1、GC4-RDE通風(fēng)空調(diào)調(diào)試方案Commissioning Plan for Ventilation and Air Conditioning Equipment根據(jù)SPEC號(hào) 23 05 93 本次文件提交內(nèi)容無偏差 According to the SPEC 23 05 93, the submittal has no deviation目錄Table of Contents一、 概況 I. Overview二、 調(diào)試工作范圍II. Scope of Commissioning三、 調(diào)試內(nèi)容說明III. Description of Commissioning四、 執(zhí)行標(biāo)準(zhǔn)IV. Appli
2、ed Standards五、 調(diào)試步驟V. Commissioning Procedures六、 調(diào)試結(jié)論和報(bào)告VI. Commissioning Conclusion and Report七、 調(diào)試組織與部署VII. Commissioning Organization and Deployment八、 安全措施VIII. Safety Measures九、 調(diào)試必備條件IX. Essential Conditions of Commissioning一、概況 I. Overview 1、工程概況 Overview1) 工程名稱: Project Name: 2)工程地點(diǎn): Project
3、Site: 3)建設(shè)單位: Owner: Company Limited4)設(shè)計(jì)單位: Designer:.5)監(jiān)理單位: Supervisor: 6)施工單位: Contractor:2、工程簡介Introduction二、調(diào)試工作范圍II. Scope of Commissioning2.1本調(diào)試工作可分為以下幾方面The commissioning is divided into the following parts: 各空調(diào)箱及通風(fēng)機(jī)單機(jī)無負(fù)荷試車。No-load trial run for each single unit of air conditioner case and v
4、entilator. 各空調(diào)箱及通風(fēng)機(jī)風(fēng)量、進(jìn)口靜壓、出口靜壓、電流、轉(zhuǎn)速、 電壓的測定及所有風(fēng)機(jī)和電機(jī)的銘牌參數(shù)。Measurement of blast volume, inlet static pressure, outlet static pressure, current, rotation speed and voltage of each air conditioner case and ventilator. 機(jī)械送、排風(fēng)系統(tǒng)的總風(fēng)量測定。Measurement of total blast volume of mechanical air supply and exhaust
5、 system. 機(jī)械送、排風(fēng)系統(tǒng)的各風(fēng)口風(fēng)量測定、調(diào)節(jié)。Measurement and adjustment of blast volume of each tuyere of mechanical air supply and exhaust system. 防排煙系統(tǒng)及排油煙機(jī)風(fēng)機(jī)總風(fēng)量及風(fēng)口風(fēng)量測定。Measurement of total blast volume and tuyere blast volume of smoke prevention and exhaust system and oil smoke exhauster fans.2.2調(diào)試工作的責(zé)職 Commissi
6、oning Duties 空調(diào)系統(tǒng)的調(diào)試是集業(yè)主技術(shù)參數(shù)的提供合理性,設(shè)計(jì)的正確與否及設(shè)備供應(yīng)方技術(shù)性能,施工的工程質(zhì)量等均可對(duì)系統(tǒng)性能產(chǎn)生一定的影響,調(diào)試人員在調(diào)試過程中如發(fā)現(xiàn)由于上述原因無法進(jìn)行工作時(shí),應(yīng)及時(shí)向施工單位、業(yè)主、總包、監(jiān)理反映。Commissioning of the air conditioning system is intended for reasonableness of technical parameters provided by the owner, correctness of design, technical characteristics of eq
7、uipment supplier and construction quality, which have an impact on performance of the system. The commissioner shall, if finding it impossible to work as a result thereof in the commissioning process, reflect it to the contractor, the owner, the general contractor and the supervisor in due time. 由于測
8、試是調(diào)試的前提,只有通過測試才能了解系統(tǒng)的運(yùn)轉(zhuǎn)的狀況?,F(xiàn)場存在問題的原因是多種的,所以很難用一種固定模式來解決上述問題,如出現(xiàn)問題我們會(huì)及時(shí)向施工單位、業(yè)主、設(shè)計(jì)、監(jiān)理匯報(bào),協(xié)商解決問題措施。Since tests are prerequisite to commissioning, operating condition of the system can be known only by passing the tests. There are many kinds of problems existing at the site, so it is very difficult to s
9、olve the problems with only one mode. If any problem occurs, we will report it to the contractor, the owner, the designer and the supervisor in due time to negotiate a solution.三、調(diào)試內(nèi)容說明 III. Description of Commissioning1風(fēng)管系統(tǒng)的調(diào)試 Commissioning of Air Duct System 通風(fēng)系統(tǒng),測定排風(fēng)機(jī)的風(fēng)量、風(fēng)壓應(yīng)在風(fēng)機(jī)特性曲線上,且風(fēng)量符合設(shè)計(jì)要求時(shí),進(jìn)行
10、風(fēng)量平衡。從最不利管門按設(shè)計(jì)風(fēng)量用等比分配法進(jìn)行風(fēng)口平衡。風(fēng)口平衡后,對(duì)總風(fēng)量復(fù)測,復(fù)測值應(yīng)與設(shè)計(jì)值基本相符。最后用紅漆對(duì)平衡的閥門進(jìn)行標(biāo)色。For the ventilation system, measured blast volume and blast pressure of exhaust fans shall be on the their characteristic curves, and blast volume shall be balanced when it meets design requirements. The tuyeres shall be balanced
11、 from the worst pipe door by equal distribution in accordance with the designed blast volume. After that, total blast volume shall be re-measured, and re-measured value shall be basically consistent with design value. Finally, balanced valves shall be painted in red. 排煙系統(tǒng)試運(yùn)轉(zhuǎn)及測試 Trial run and tests o
12、f smoke exhaust system 排煙系統(tǒng)在安裝完畢投入使用前,必須進(jìn)行系統(tǒng)的測定和調(diào)試,設(shè)備單機(jī)試運(yùn)轉(zhuǎn)及測試(詳見調(diào)試范圍2.1)。The smoke exhaust system must be subject to system tests and commissioning and single-unit trial run and tests after installation before use (see 2.1 for details of commissioning scope).防排煙系統(tǒng)的測定和調(diào)試應(yīng)包括下列項(xiàng)目:Tests and commissionin
13、g of the smoke prevention and exhaust system shall include:a. 逐個(gè)進(jìn)行前室常閉送風(fēng)口的手動(dòng)開啟、手動(dòng)復(fù)位試驗(yàn)。執(zhí)行機(jī)構(gòu)動(dòng)作應(yīng)靈敏,脫扣鋼絲的連接應(yīng)不松弛,不脫落。Manual opening and manual reset tests of each normally closed air outlet of front room. The actuator shall act sensitively, and the tripping wire shall be connected without loosing and fal
14、ling.b. 手動(dòng)開啟排煙風(fēng)機(jī),風(fēng)機(jī)應(yīng)正常運(yùn)轉(zhuǎn)30min,無異常聲響。Manually start the smoke exhaust fan. The fan shall properly work for 30min without abnormal noise.c. 送風(fēng)機(jī)(排煙風(fēng)機(jī))入口處風(fēng)量應(yīng)與銘牌值相符。Blast volume at inlet of the blower (smoke exhaust fan) shall be compliant with nameplate rating.d. 逐個(gè)檢查送風(fēng)口(排煙口)與風(fēng)道連接處,不應(yīng)有風(fēng)量泄漏。Check connect
15、ions between air outlets (exhaust ports) and ducts one by one. There shall be no air leakage.e. 逐個(gè)檢查送風(fēng)口(排煙口),應(yīng)牢固安裝在指定位置上。Check air outlets (exhaust ports) one by one. They shall be securely installed at specified position.f. 選一層為模擬火災(zāi)層,開啟風(fēng)機(jī)和該層的送風(fēng)口,測試該層風(fēng)口處的風(fēng)速應(yīng)達(dá)到設(shè)計(jì)要求。Select a floor as fire simulation f
16、loor, start its fans and air outlets, and test air speed at tuyeres on that floor. The speed shall be compliant with design requirements.四、執(zhí)行標(biāo)準(zhǔn)IV. Applied Standards1GB502432002通風(fēng)與空調(diào)工程施工及驗(yàn)收規(guī)范。GB50243-2002 Code of Acceptance for Construction Quality of Ventilation and Air Conditioning Works2工程圖紙及有關(guān)修改圖
17、。Engineering drawings and relevant revisions.3設(shè)計(jì)院提供的工程設(shè)計(jì)數(shù)據(jù)及設(shè)計(jì)參數(shù)。(單獨(dú)提供)Engineering design data and design parameters provided by the design institute. (Separately provided)4上海市工程建設(shè)規(guī)范建筑防排煙技術(shù)規(guī)程DGJ08-88-2006Technical Specification for Building Smoke Control DGJ08-88-20065.建筑節(jié)能工程施工質(zhì)量驗(yàn)收規(guī)范(GB50411-2007)Cod
18、e for Acceptance of Energy Efficient Building Construction GB50411-20076. 組合式空調(diào)機(jī)組(GB/T 14294-2008)Central-station Air Handling Units GB/T 14294-2008五、調(diào)試步驟 V. Commissioning Procedures5.1支持條件。Supporting Conditions由于調(diào)試過程是集設(shè)計(jì)、施工、制造廠于一體全過程的質(zhì)量反映,整個(gè)過程需要得到各方面的支持與合作。The commissioning process, which acts as q
19、uality reflection throughout design, construction and manufacturer, requires support and cooperation in all respects.1調(diào)試人員的準(zhǔn)備:調(diào)試單位具有上海市建設(shè)工程檢測行業(yè)協(xié)會(huì)認(rèn)證的機(jī)構(gòu)完成,調(diào)試人員必須具備相應(yīng)的資質(zhì)證明。調(diào)試人員具有5年豐富的測試經(jīng)驗(yàn),對(duì)系統(tǒng)的工藝流程、控制原理非常熟悉,有較強(qiáng)的解決測試中出現(xiàn)問題和故障的能力。Preparation of commissioning operators: The commissioning organization shall
20、have a certificate issued by Shanghai Construction Engineering Test Industry Association, and commissioning operators must have relevant qualifications and rich experience in tests, be familiar with technological process and control principle of the system and have strong capacity to solve problems
21、and faults occurring in the tests.2清掃準(zhǔn)備:在系統(tǒng)測試前,施工單位應(yīng)對(duì)各通風(fēng)機(jī)等進(jìn)行徹底的清掃和完整性檢查,現(xiàn)場的環(huán)境也要保持清潔。Preparation for cleaning: Before tests of the system, the contractor shall thoroughly clean and check integrity of each ventilator and keep the site environmentally clean.3資料準(zhǔn)備:測試資料包括整套的系統(tǒng)圖,控制原理圖,相關(guān)的平面圖和應(yīng)由設(shè)計(jì)方提供的測試數(shù)據(jù)。
22、Preparation of information: Test information includes a complete set of system drawings, control principle drawings, relevant plane layouts and test data to be provided by the designer.4 物業(yè)管理對(duì)所調(diào)試工作的房門在需要時(shí)能及時(shí)開啟。It is possible for property management to open the door of the room where commissioning is
23、 done when necessary.5 設(shè)計(jì)方能及時(shí)提供技術(shù)數(shù)據(jù),且對(duì)測試過程中的數(shù)據(jù)能共同進(jìn)行判別。The designer shall be able to provide technical data and jointly identify data during the tests.6 在調(diào)試過程發(fā)現(xiàn)的問題,我方及時(shí)向業(yè)主、監(jiān)理、總包匯報(bào)后,請(qǐng)業(yè)主能及時(shí)給于解決,利于工作順利進(jìn)行。We will report any problem found in the commissioning process to the owner, the supervisor and the g
24、eneral contractor in due time and request the owner to solve it for the sake of successful work.5.2調(diào)試過程。Commissioning Process5.2.1空調(diào)系統(tǒng)調(diào)試(定風(fēng)量系統(tǒng))Commissioning of Air Conditioning System (Constant Blast Volume System)調(diào)試程序 Commissioning Procedures4.風(fēng)壓轉(zhuǎn)速總風(fēng)量測定3.新風(fēng)量確定2.風(fēng)管系統(tǒng)檢查1.單機(jī)試運(yùn)轉(zhuǎn)5.風(fēng)口風(fēng)量測試與平衡6.總風(fēng)量復(fù)測7. 風(fēng)口風(fēng)
25、量確認(rèn)及閥門固定與標(biāo)色2. Inspection of air duct system1. Trial run of single unit4. Measurement of blast pressure, rotation speed and total blast volume3. Definition of new blast volume6.The total air volume of retest Re-measurement of total blast volume5. Testing and balancing of blast volume of tuyere7. Conf
26、irmation of blast volume of tuyere and fixation and coloring of valves 風(fēng)機(jī)單機(jī)試運(yùn)轉(zhuǎn)試運(yùn)轉(zhuǎn)是在加上適當(dāng)潤滑油且安全措施齊全條件下進(jìn)行。葉輪應(yīng)無卡阻和碰擦現(xiàn)象,葉輪旋轉(zhuǎn)方向正確,運(yùn)轉(zhuǎn)不少于2h。無異常噪聲及振動(dòng),軸承無異常溫升,皮帶緊張度適中。Trial run of single unit The unit shall be run on trial with proper lubricating oil filled and all safety measures taken. The impellers shall n
27、either seize nor collide with anything else and shall rotate in the correct direction for at least 2h. There shall be no abnormal noise or vibration. The bearings shall have no abnormal temperature rise. The belts shall be properly tensioned. 風(fēng)管系統(tǒng)檢查風(fēng)管系統(tǒng)所服務(wù)的大廳及房間均應(yīng)打掃清潔,檢查系統(tǒng)中閥門開啟是否正確,防火閥、調(diào)節(jié)閥一般都處在開啟位置。
28、Inspection of air duct system The halls and rooms for which the air duct system is used shall be cleaned up. Check if valves in the system are correctly opened. The fire valves and regulating valves are generally open. 總風(fēng)量風(fēng)壓轉(zhuǎn)速測定測定風(fēng)機(jī)總風(fēng)量時(shí),選定氣流相對(duì)穩(wěn)定段,一般應(yīng)選在產(chǎn)生局部阻力之后45倍風(fēng)管直徑(或風(fēng)管大邊尺寸)和產(chǎn)生局部阻力之前1.52倍風(fēng)管直徑(或風(fēng)管大邊
29、尺寸)的直管段上。測定時(shí),在矩形風(fēng)管截面內(nèi)測量平均風(fēng)速,應(yīng)將將測定面分成若干個(gè)等面積方格,每個(gè)方格約為0.05,用數(shù)字式風(fēng)速儀測出各個(gè)方格的風(fēng)速,求出平均風(fēng)速,計(jì)算出總風(fēng)量。Measurement of blast pressure, rotation speed and total blast volume To measure total blast volume of fans, a segment with relatively stable air flow shall be selected, generally a straight pipe segment that is 4-
30、5 times of the diameter (or size of the long side) of an air duct after local resistance is generated and 1.5-2 times of the diameter (or size of the long side) of an air duct before local resistance is generated. In the measurement, average air speed shall be measured in the cross section of a rect
31、angular air duct, and the measured surface shall be divided into several equal-area squares each of which is approx. 0.05m2. Air speed in each of the squares shall be measured with a digital anemoscope to derive average air speed and calculate total blast volume. 風(fēng)口風(fēng)量測試與平衡包括兩方面工作,其一、是風(fēng)口風(fēng)量測試,其二、是風(fēng)口之間
32、的平衡。Testing and balancing of blast volume of tuyeres Including two items of work, one of which is testing of blast volume of tuyeres, and the other is balancing between tuyeres.首先測定每個(gè)風(fēng)口的風(fēng)速,然后根據(jù)所測定數(shù)據(jù)分析,通過調(diào)節(jié)各支管上的調(diào)節(jié)閥,使每個(gè)風(fēng)口的風(fēng)量達(dá)到設(shè)計(jì)要求,誤差在5范圍內(nèi),風(fēng)口風(fēng)量平衡時(shí)根據(jù)實(shí)測風(fēng)量與設(shè)計(jì)風(fēng)量的比值進(jìn)行調(diào)節(jié),從最不利處進(jìn)行調(diào)節(jié),直至趨于平衡。First of all, measur
33、e air speed of each tuyere, and adjust blast volume of each tuyere up to design requirements by analyzing the measured data and adjusting the regulating valves on each branch pipe and tuyere, error of which shall be within 5%. To balance blast volume of tuyeres, adjustment shall be made from the wor
34、st place in accordance with the ratio between measured blast volume to designed blast volume until it is balanced.平衡一般采用基準(zhǔn)風(fēng)口調(diào)整法。此方法以風(fēng)口風(fēng)量測量為基礎(chǔ),先用風(fēng)速儀初測全部風(fēng)口的送風(fēng)量,并計(jì)算每個(gè)風(fēng)口的實(shí)測風(fēng)量與設(shè)計(jì)風(fēng)量的比值,選出每條支干管上比值最小的風(fēng)口,作為調(diào)整各支干管上風(fēng)口風(fēng)量的基準(zhǔn)風(fēng)口。再從最遠(yuǎn)支干管最遠(yuǎn)的風(fēng)口開始測量與調(diào)整,使得風(fēng)口與基準(zhǔn)風(fēng)口實(shí)測風(fēng)量與設(shè)計(jì)風(fēng)量的比值近似相等,逐步使風(fēng)口風(fēng)量得到平衡。Generally, reference tuyere
35、adjustment shall be used for balancing. It is based on measurement of blast volume of tuyeres by preliminarily measuring air supply volume of all tuyeres with an anemoscope, calculating the ratio of measured blast volume to designed blast volume of each tuyere and selecting the tuyere with the small
36、est ratio on each branch and main pipe as the reference tuyere for adjusting blast volume of tuyeres on each of the pipes. Then, start measurement and adjustment with the farthermost tuyere of the farthermost branch or main pipe to make the ratio of measured blast volume to designed blast volume of
37、each tuyere approximate to that of the reference tuyere and gradually balance blast volume of tuyeres.在圖紙上未標(biāo)定風(fēng)口風(fēng)量時(shí),按照實(shí)測值等面積分配或與設(shè)計(jì)溝通按設(shè)計(jì)的給定值進(jìn)行分配。Blast volume of tuyeres shall, if not stated in drawings, be equally distributed by areas in accordance with measured value or distributed in accordance with
38、 given value in design by communicating with the designer. 復(fù)測在風(fēng)口風(fēng)量平衡工作結(jié)束后,還必須對(duì)風(fēng)機(jī)的總風(fēng)量和風(fēng)壓進(jìn)行一次復(fù)測,如與設(shè)計(jì)要求相符合則調(diào)試完畢,如與設(shè)計(jì)值偏差超過5%或超過業(yè)主要求時(shí)必須進(jìn)行復(fù)查,尋找出原因,并就此做出應(yīng)對(duì),直至問題的解決。Re-measurement After blast volume of tuyeres is balanced, total blast volume and blast pressure of fans must be re-measured. If re-measured val
39、ue is compliant with design requirements, commissioning will be ended. If re-measured value greatly deviates from design value or exceeds the owners requirement, it must be rechecked to find out the cause and make response until the problem is solved. 系統(tǒng)風(fēng)量調(diào)試結(jié)束,對(duì)所有閥門進(jìn)行固定,且對(duì)手柄開啟位置進(jìn)行涂漆標(biāo)色,以保證對(duì)閥門開啟程度的確認(rèn)。
40、After commissioning of blast volume of the system, all valves shall be secured, and ON positions of handles shall be painted in different colors to confirm openness of valves.5.2.2防煙系統(tǒng)(防煙系統(tǒng)的測試應(yīng)在排煙系統(tǒng)同時(shí)運(yùn)轉(zhuǎn)的條件下進(jìn)行)。Smoke Prevention System (It shall be tested with the smoke exhaust system running.)2.總風(fēng)量測試
41、1.單機(jī)試運(yùn)轉(zhuǎn)2. Testing of total blast volume1. Trial run of single unit 風(fēng)機(jī)單機(jī)試運(yùn)轉(zhuǎn)試運(yùn)轉(zhuǎn)是在加上適當(dāng)潤滑油且安全措施齊全條件下進(jìn)行。葉輪應(yīng)無卡阻和碰擦現(xiàn)象,葉輪旋轉(zhuǎn)方向正確,運(yùn)轉(zhuǎn)不少于2h。且無異常噪聲及振動(dòng),軸承無異常溫升,機(jī)電電流在額定范圍以內(nèi)及皮帶緊張度適中,上述工作是在電壓380V,頻率50Hz條件下進(jìn)行。Trial run of single unit The unit shall be run on trial with proper lubricating oil filled and all safety mea
42、sures taken. The impellers shall neither seize nor collide with anything else and shall rotate in the correct direction for at least 2h. There shall be no abnormal noise or vibration. The bearings shall have no abnormal temperature rise. Current shall be within the rated range, and the belts shall b
43、e properly tensioned. The aforesaid work is conducted at 380V voltage and 50Hz frequency. 風(fēng)管系統(tǒng)檢查立管所服務(wù)的各層門、建筑、風(fēng)口與建筑結(jié)合部應(yīng)密封,無明顯 漏縫隙。Inspection of air duct system Connections between doors, buildings and tuyeres on each floor where vertical pipes are used and buildings shall be sealed up without visible
44、 leakage and gap. 總風(fēng)量測定測定風(fēng)機(jī)總風(fēng)量時(shí),選定氣流相對(duì)穩(wěn)定段,一般應(yīng)選在產(chǎn)生局部阻力之后45倍風(fēng)管直徑(或風(fēng)管大邊尺寸)和產(chǎn)生局部阻力之前1.52倍風(fēng)管直徑(或風(fēng)管大邊尺寸)的直管段上。測定時(shí),在矩形風(fēng)管截面內(nèi)測量平均風(fēng)速,應(yīng)將將測定面分成若干個(gè)等面積方格,每個(gè)方格約為0.05,用數(shù)字式風(fēng)速儀測出各個(gè)方格的風(fēng)速,求出平均風(fēng)速,計(jì)算出總風(fēng)量。Measurement of total blast volume To measure total blast volume of fans, a segment with relatively stable air flow sha
45、ll be selected, generally a straight pipe segment that is 4-5 times of the diameter (or size of the long side) of an air duct after local resistance is generated and 1.5-2 times of the diameter (or size of the long side) of an air duct before local resistance is generated. In the measurement, averag
46、e air speed shall be measured in the cross section of a rectangular air duct, and the measured surface shall be divided into several equal-area squares each of which is approx. 0.05m2. Air speed in each of the squares shall be measured with a digital anemoscope to derive average air speed and calcul
47、ate total blast volume. 風(fēng)機(jī)機(jī)外余壓測試用微壓計(jì)加畢托管在空調(diào)箱出口處測靜壓。Measurement of residual pressure outside fans Measure static pressure at the outlet of the air conditioner case with a Chattock gauge and a Pitot tube. 用微壓計(jì)測試,測試相應(yīng)位置的壓力差,測試時(shí)應(yīng)密切注意相關(guān)門的開啟狀況。Test pressure difference at relevant positions with a Chattock
48、 gauge. During the test, opening of doors shall be closely watched. 用熱球風(fēng)速儀測試相應(yīng)門開啟時(shí)(門開啟數(shù)應(yīng)符合消防法規(guī)與原設(shè)計(jì)說明)的門洞風(fēng)速。Test air speed when relevant doors are opened with a hot-bulb anemoscope (such opening shall be compliant with fire control regulations and original design).5.2.3排煙系統(tǒng)(同防煙系統(tǒng))。Smoke Exhaust Syste
49、m (same as smoke prevention system)3.樓層排煙量測試2.總排煙壓頭量測試1.單機(jī)試運(yùn)轉(zhuǎn)2. Testing of total smoke exhaust pressure head3. Testing of smoke exhaust level of each floor1. Trial run of single unit 排煙風(fēng)機(jī)單機(jī)試試運(yùn)轉(zhuǎn)(按設(shè)計(jì)書要求,消防部門認(rèn)定的開啟若干個(gè)排煙口的前提下進(jìn)行試運(yùn)轉(zhuǎn))。Trial run of single unit of smoke exhaust fan (in accordance with design
50、sheets, the unit shall be run on trial with several exhaust ports opened as recognized by the fire control department).試運(yùn)轉(zhuǎn)應(yīng)加適當(dāng)潤滑油且安全措施齊全條件下進(jìn)行。葉輪運(yùn)轉(zhuǎn)應(yīng)無卡阻和碰擦現(xiàn)象,葉輪旋轉(zhuǎn)方向正確,運(yùn)轉(zhuǎn)不少于2h。且無異常噪聲及振動(dòng),軸承無異常溫升,電機(jī)電流在額定范圍以內(nèi)及皮帶緊張度適中,上述工作是在電壓380V,頻率50Hz條件下進(jìn)行。The unit shall be run on trial with proper lubricating oil fille
51、d and all safety measures taken. The impellers shall neither seize nor collide with anything else and shall rotate in the correct direction for at least 2h. There shall be no abnormal noise or vibration. The bearings shall have no abnormal temperature rise. Current shall be within the rated range, a
52、nd the belts shall be properly tensioned. The aforesaid work is conducted at 380V voltage and 50Hz frequency. 總排煙量測定測定風(fēng)機(jī)總風(fēng)量時(shí),選定氣流相對(duì)穩(wěn)定段,一般應(yīng)選在產(chǎn)生局部阻力之后45倍風(fēng)管直徑(或風(fēng)管大邊尺寸)和產(chǎn)生局部阻力之前1.52倍風(fēng)管直徑(或風(fēng)管大邊尺寸)的直管段上。測定時(shí),在矩形風(fēng)管截面內(nèi)測量平均風(fēng)速,應(yīng)將將測定面分成若干個(gè)等面積方格,每個(gè)方格約為0.05,用數(shù)字式風(fēng)速儀測出各個(gè)方格的風(fēng)速,求出平均風(fēng)速,計(jì)算出總風(fēng)量。Measurement of total smok
53、e exhaust level To measure total blast volume of fans, a segment with relatively stable air flow shall be selected, generally a straight pipe segment that is 4-5 times of the diameter (or size of the long side) of an air duct after local resistance is generated and 1.5-2 times of the diameter (or si
54、ze of the long side) of an air duct before local resistance is generated. In the measurement, average air speed shall be measured in the cross section of a rectangular air duct, and the measured surface shall be divided into several equal-area squares each of which is approx. 0.05m2. Air speed in ea
55、ch of the squares shall be measured with a digital anemoscope to derive average air speed and calculate total blast volume. 樓層排煙量測試用風(fēng)速儀測排煙口平均風(fēng)速,計(jì)算風(fēng)量達(dá)到設(shè)計(jì)和規(guī)范要求。Testing of smoke exhaust level of each floor Measure average air speed of exhaust ports with an anemoscope, and calculate blast volume to chec
56、k if design requirements and specifications are met!空調(diào)水系統(tǒng)調(diào)試 Commissioning of air conditioning water system 本項(xiàng)目冷媒水由能源中心直供,以餐飲區(qū)管道實(shí)際接入端實(shí)測總水流量進(jìn)行平衡調(diào)試。首先進(jìn)行各支路管的分配平衡;調(diào)節(jié)實(shí)際進(jìn)入RD&E餐飲區(qū)域的實(shí)際水流量調(diào)至設(shè)計(jì)需求的流量;然后各空調(diào)系統(tǒng)末端按設(shè)計(jì)要求進(jìn)行平衡調(diào)試。In this project, cooling water is directly supplied from the energy center, and balanc
57、e is commissioned by measuring total water flow at the effective incoming end of Dreamworld pipes. Firstly, adjust the actual water flow connected into RD&E Dining Area to required flow in design, and balance distribution to each branch. Each end of the air conditioning system shall be balanced
58、in accordance with design requirements.6.1準(zhǔn)備工作 Preparations6.1.1 在冷凍水直供系統(tǒng)的流量平衡調(diào)試施工前,各區(qū)段空調(diào)水系統(tǒng)的設(shè)備、管線必須按照設(shè)計(jì)要求施工完畢,循環(huán)清洗已完成;鈍化已完成;已經(jīng)按照要求灌滿水,排凈系統(tǒng)內(nèi)的空氣,設(shè)備的單機(jī)調(diào)試應(yīng)完成,空調(diào)冷凍水水系統(tǒng)開通。Before flow balancing of the direct chilled water supply system, equipment and piping of the air conditioning water system in each section must be constructed in accordance with design requirements, and construction,
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年南京貨車資格證答案
- 小商鋪房屋租賃合同
- 2025年高中化學(xué)新教材同步 必修第一冊(cè) 第2章 第2節(jié) 第1課時(shí) 氯氣的性質(zhì)
- 反擔(dān)保 保證合同范本
- Α-烯基磺酸鹽(AOS9235)競爭策略分析報(bào)告
- 印布油墨戰(zhàn)略市場規(guī)劃報(bào)告
- 鋅鎳蓄電池市場分析及競爭策略分析報(bào)告
- 原木砍伐工程合同范本
- 維修電工模擬題+答案
- 獸醫(yī)免疫學(xué)模擬習(xí)題及答案
- 2024年江蘇省中學(xué)生生物學(xué)奧林匹克初賽理論試題
- 環(huán)境年度報(bào)告
- 生產(chǎn)流水線的規(guī)劃方案
- 小針刀療法教學(xué)課件
- 打造寫生基地方案
- 寫作:廣告詞-【中職專用】高二語文高效課堂(高教版2023·職業(yè)模塊)
- 爆發(fā)性心肌炎護(hù)理查房課件
- 銷售人員人才畫像
- 鑫宇鋅合金模具設(shè)計(jì)標(biāo)準(zhǔn)
- 整理我的小書桌(課件)小學(xué)勞動(dòng)二年級(jí)通用版
- 森林撫育施工組織設(shè)計(jì)
評(píng)論
0/150
提交評(píng)論