版權(quán)說(shuō)明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、襯膠鋼件表面質(zhì)量控制記錄Quality Control Record of Steel Structure Surface for Rubber Lining編號(hào)No.:QD/MS04-03 記錄號(hào)Record No.:顧客名稱Customer name: 項(xiàng)目名稱Project name:設(shè)備名稱Equipment name: 規(guī)格Specification: 編號(hào)Code:檢驗(yàn)依據(jù): 產(chǎn)品工藝質(zhì)量檢驗(yàn)規(guī)程 工藝序號(hào):QC/PR-10Inspection according to:Product processing quality Inspection Rules. Process Cod
2、e:QC/PR-10 顧客提供鋼件制作檢驗(yàn)報(bào)告單: 交接人:Customer providing the steel structure manufacture inspection report: Agent:鋼件檢驗(yàn)Steel Inspection項(xiàng) 目Project檢測(cè)要求Inspection requirements檢驗(yàn)數(shù)據(jù)Inspection data處置方法Treatment method 檢驗(yàn)人員/時(shí)間Inspector/Time腐蝕程度Corrosion condition一般銹蝕 Commonly rusty檢驗(yàn)Inspection:時(shí)間Time:焊縫平/高度Welding
3、seam level/highness平Level/<2mm飛濺焊瘤Splash Welding nubble不允許存在Not allowed處置計(jì)劃Treatment Plan砂眼氣孔Sand hole不允許存在Not allowed角縫打磨Angle grinding棱角edge/corner angle R3mm內(nèi)角Internal angle R5mm凹痕深度Concave deepness0.5mm鋒口毛刺Sharp burr不允許存在Not allowed原因分析處置Reason analysis and treatment:返工檢驗(yàn)Inspection for doing
4、poorly done work over again時(shí) 間Time完 成 情 況Accomplished condition 操作人員/時(shí)間Operator/Time補(bǔ)焊Repairing welding:時(shí)間Time:打磨Grinding:時(shí)間Time:最終評(píng)定Final assessment:檢驗(yàn)員Inspector:: 時(shí)間Time: 編制Authorized by: 審核Auditor:橡膠襯里產(chǎn)品檢驗(yàn)報(bào)告Inspection Report of Rubber Lining Product編號(hào)No.:QD/MS04-06 記錄號(hào)Record No.:客戶名稱Customer name
5、: 工程名稱Project name:設(shè)備名稱Equipment name: 規(guī)格Specification: 編號(hào)Code:檢測(cè)依據(jù):橡膠襯里產(chǎn)品工藝質(zhì)量檢驗(yàn)規(guī)程 工序號(hào):QC/PR-10Inspection according to:Rubber lining product processing quality inspection rules. Process Code:QC/PR-10檢測(cè)要求Inspection requirements檢 測(cè) 結(jié) 果 Inspection result產(chǎn)品product試板Test plate1. 外觀目測(cè)100%External appearan
6、ce Examination by Visualization缺陷Shortcoming:裂口Gap:翹邊Side raised:規(guī)格Specification:2.厚度檢測(cè)Thickness test:+15%、-10%檢測(cè)儀器Instrument for Inspection:規(guī)定值Standard:儀器編號(hào)Instrument No.:實(shí)測(cè)值Reality:實(shí)測(cè)值Reality:3.火花檢測(cè)Sparking test:100%檢測(cè)儀器Instrument for Inspection:電壓規(guī)定值Voltage standard:儀器編號(hào)Instrument No.:實(shí)測(cè)值Reality:
7、實(shí)測(cè)值Reality:4.硬度檢測(cè)Hardness test:不少于6處 not Less than 6 positions檢測(cè)儀器Test Instrument:規(guī)定值Standard:儀器編號(hào)Instrument No.:實(shí)測(cè)值Reality:實(shí)測(cè)值Reality:5.剝離強(qiáng)度測(cè)試Peeling strength test:測(cè)量?jī)x器Test Instrument:規(guī)定值Standard: N/mm6.粘結(jié)強(qiáng)度測(cè)試Bonding test:測(cè)量?jī)x器Test Instrument:規(guī)定值Standard: N/mm2實(shí)測(cè)值Reality:硫化人員Vulcanization Operator:
8、修整人員Repair operator: 檢驗(yàn)員Inspector: 時(shí) 間time: 時(shí) 間Time: 時(shí) 間time:原因描述Reason description:質(zhì)量評(píng)定Quality assessment:備注Note:編制Authorized by: 審核Auditor:膠板復(fù)合成型檢查記錄Inspection record of compound rubber sheet編號(hào)No.:QD/MS04-05 記錄號(hào)Record No.:設(shè)備名稱Project name: 編號(hào)No.:計(jì)劃數(shù)量Planed quantity: 規(guī)格Specification: 批次Group No.:天氣
9、Weather: 溫度Temperature: 濕度Humidity:施工人員Workers:生產(chǎn)車間Workshop:日 期Date:檢驗(yàn)員Inspector:膠漿檢查Adhesive Inspection膠漿Adhesive : 代號(hào)Code: 制作時(shí)間Manufacture Time: 存放時(shí)間Deposited period: 濃度比Concentration ratio: 稀釋劑Thinner: 粘性試驗(yàn)Adhesiveness test: 復(fù)合方式Compound way: 輥速Roller Speed:復(fù)合過(guò)程Compound Process膠料Rubber material:
10、代 號(hào)Code: 粘合面處理 Compound surface treatment 層次Level: 要求厚度Standard Thickness : 實(shí)測(cè)厚度Actrual Thickness: 外觀質(zhì)量Surface Quality: 電火花檢測(cè)Spark test:原因分析及處置Reason analysis and treatment:編制Authorized by: 審核Auditor:襯膠過(guò)程檢驗(yàn)記錄Inspection Record of Rubber Lining Process編號(hào)No:QD/MS04-02 記錄號(hào)Record No.: 設(shè)備名稱Project name: 規(guī)
11、格Specification: 編號(hào)No.:膠料Rubber Material: 代號(hào)Code: 批次Group No.:檢驗(yàn)依據(jù):橡膠襯里工藝工序質(zhì)量檢驗(yàn)規(guī)程 工序號(hào):QC/PR-01-09Inspection according to: Rubber lining processing procedure quality inspection rules. Procedure No.: QC/PR-01-09襯膠過(guò) 程Rubber lining process項(xiàng) 目Project過(guò) 程 檢 驗(yàn)項(xiàng) 目過(guò) 程 檢 驗(yàn)下料尺寸Material dimension 合格 不合格Conformity
12、Nonconformity坡口寬度Slope width合格 不合格ConformityNonconformity膠片刷漿Brushing adhesive on rubber sheet 合格 不合格ConformityNonconformity接縫寬度Seam Width合格 不合格ConformityNonconformity襯膠布置Rubber lining arrangement合格 不合格ConformityNonconformity缺陷修整Shortcoming reparing合格 不合格ConformityNonconformity襯膠流向Rubber lining dire
13、ction合格 不合格ConformityNonconformity襯后檢測(cè)Inspection after lining合格 不合格ConformityNonconformity施工人員/時(shí) 間Workers/Time時(shí)間Time: 班次Team No:時(shí)間Time: 班次Team No:下料Material preparing:下料Material preparing:襯膠rubber lining:襯膠Rubber lining:刷漿brushing adhesive:刷漿Brushing adhesive:檢測(cè)inspection: 電壓voltage:檢測(cè)inspection: 電壓
14、voltage:基體溫、濕度控制記錄Body temperature & moisture control record溫度Temperature濕度Temperature %溫度Temperature濕度Temperature %原因分析與處置Reason analysis and treatment:檢驗(yàn)部位Inspection position:質(zhì)量確認(rèn)Quality affirmance:?jiǎn)挝回?fù)責(zé)人Company principal /日期Date: 施工負(fù)責(zé)人Manufacture Principal/日期Date:編制Authorized by: 審核Auditor: 涂刷
15、膠漿過(guò)程檢驗(yàn)記錄Inspection Record of Brushing Adhesive Process編號(hào)No.:QD/PR06-04 記錄號(hào)Record No.:設(shè)備名稱Project name: 規(guī)格Specification: 編號(hào)No.:檢驗(yàn)依據(jù):橡膠襯里工藝操作規(guī)程 工序號(hào):QC/PR-01-09Inspection according to: Rubber lining processing manufacture rules. Procedure No.: QC/PR-01-09膠漿名稱Adhesive name: 代號(hào)Code:涂刷膠漿要求:基體表面涂刷三遍,第一、二遍膠
16、漿干燥時(shí)間不低于2小時(shí),第三 遍實(shí)際掌握,膠片表面涂刷二遍,干燥時(shí)間為1545分鐘。Brushing adhesive requirements: brush three times for tank body surface; the adhesive drying time should be not less than two hours for the first and second time; for the third time, do according to the fact, brush the rubber surface for two times, and dying
17、 time should be 1545 minutes.步驟Step操作人員Operator時(shí)間Time基 體 body質(zhì)檢員Inspector溫度Temperature濕度Temperature原因分析與處置Reason analysis and treatment:檢驗(yàn)部位Inspection position:質(zhì)量確認(rèn)Quality affirmance:?jiǎn)挝回?fù)責(zé)人簽字Company principals signature:日期date:施工負(fù)責(zé)人簽字Manufacture principals signature:日期date:編制Authorized by: 審核Auditor:
18、噴砂質(zhì)量控制記錄Sandblasting Quality Control Record編號(hào)No.:QD/PM04-04 記錄號(hào)Record No.:顧客名稱Customer Name: 工程項(xiàng)目Project:設(shè)備名稱Equipment Name: 規(guī)格Specification: 編號(hào)No.:噴砂 過(guò)程Sand blasting procedure項(xiàng)目Project質(zhì)量要求Quality requirements檢驗(yàn)結(jié)果Inspection result具體方法Detailed methods其它處理情況Other treatments氧化層Oxidation layer 消 除Removed均勻度Even Level一 致 Even 漏噴點(diǎn)Leavin
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025年度跨境電子商務(wù)平臺(tái)廣告服務(wù)合同4篇
- 2025年度水電工程設(shè)計(jì)與施工一體化合同匯編4篇
- 2025年度重型沖擊鉆施工工程合同4篇
- 2025年鮮蛋冷鏈配送與售后服務(wù)合同3篇
- 個(gè)人土地抵押貸款合同范本打印版(2024)一
- 2025年度智慧城市建設(shè)物業(yè)服務(wù)委托合同4篇
- 2025年度餐飲行業(yè)供應(yīng)鏈戰(zhàn)略合作框架協(xié)議3篇
- 教育技術(shù)在小學(xué)科學(xué)課題研究中的應(yīng)用與發(fā)展
- 個(gè)人借款轉(zhuǎn)讓協(xié)議簡(jiǎn)明示例版
- 2025年度個(gè)人租賃房屋租賃合同違約責(zé)任及處理協(xié)議4篇
- 人教版物理八年級(jí)下冊(cè) 專項(xiàng)訓(xùn)練卷 (一)力、運(yùn)動(dòng)和力(含答案)
- 山東省房屋市政工程安全監(jiān)督機(jī)構(gòu)人員業(yè)務(wù)能力考試題庫(kù)-中(多選題)
- 重慶市2023-2024學(xué)年七年級(jí)上學(xué)期期末考試數(shù)學(xué)試題(含答案)
- 2024年中考語(yǔ)文滿分作文6篇(含題目)
- 北師大版 2024-2025學(xué)年四年級(jí)數(shù)學(xué)上冊(cè)典型例題系列第三單元:行程問(wèn)題“拓展型”專項(xiàng)練習(xí)(原卷版+解析)
- 2023年譯林版英語(yǔ)五年級(jí)下冊(cè)Units-1-2單元測(cè)試卷-含答案
- 施工管理中的文檔管理方法與要求
- DL∕T 547-2020 電力系統(tǒng)光纖通信運(yùn)行管理規(guī)程
- 種子輪投資協(xié)議
- 執(zhí)行依據(jù)主文范文(通用4篇)
- 浙教版七年級(jí)數(shù)學(xué)下冊(cè)全冊(cè)課件
評(píng)論
0/150
提交評(píng)論