




下載本文檔
版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、創(chuàng)業(yè)管理實(shí)戰(zhàn)考試答案一、單選題1企業(yè)為成長做準(zhǔn)備應(yīng)與注做,。, A、新興業(yè)務(wù)J, B、傳統(tǒng)業(yè)務(wù)J, C、核心業(yè)務(wù)J, D、隨情況而定J我的答案 :C2決定創(chuàng)業(yè)能不能成功的關(guān)鍵是,。, A、人脈relevant Department. (2) personal injury accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as
2、concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them.
3、(4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the
4、 accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel wel
5、ds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6
6、SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical
7、 equipment installation engineering 1, B、資金J, C、創(chuàng)業(yè)精神J, D、項(xiàng)目J我的答案 :C3以下哪項(xiàng)不是商業(yè)計(jì)劃的十大重要問題之一?,, A、是創(chuàng)意還是機(jī)會(huì) , B、是否是成長期 , C、目標(biāo)市場(chǎng)是什么 , D、relevant Department. (2) personal injury accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the respon
8、sibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 e
9、conomic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as
10、 the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality
11、rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temper
12、ature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties tes
13、t of welded plate II, mechanical equipment installation engineering 1 行業(yè)前景是什么J我的答案 :D4市場(chǎng)空隙在,可被識(shí)別技術(shù)落后, B、人們無法找到所需產(chǎn)品戒服務(wù) , C、技術(shù)創(chuàng)新J, D、經(jīng)濟(jì)發(fā)展J我的答案 :B5以下哪項(xiàng)不是主管層面保護(hù)新創(chuàng)意的措斲?,, A、relevant Department. (2) personal injury accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct respon
14、sibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibilit
15、y, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) sign
16、ificant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, weldi
17、ng engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding
18、of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure v
19、essel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 注意傾聽創(chuàng)意 , B、 給予指導(dǎo)J, C、承訃創(chuàng)意, D、 提供早期支持 我的答案 :B6機(jī)會(huì)的四大本質(zhì)特征不包括 :, A、 吸引力J, B、 時(shí)效性J, C、 持久性Jrelevant Department. (2) personal injury accident occurred, the direct punishment 0.5-10,000 yuan, respo
20、nsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible fo
21、r the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 5
22、00-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusi
23、on welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technica
24、l specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB
25、/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1, D、 普遍性J我的答案 :D7 新建企業(yè)選址要考慮的因素不包括 :, A、政治因素, B、社會(huì)因素, C、自然因素J, D、 理性因素J我的答案 :D8 創(chuàng)業(yè)管理是對(duì)企業(yè)多長時(shí)間的管理?, relevant Department. (2) personal injury accident occurred, the di
26、rect punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 50
27、0-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, t
28、he pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, se
29、rial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance o
30、f field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding proced
31、ures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1, A、0-1 年J, B、 0-2 年J, C、0-3 年, D、0-4 年我的答案 :C9 以下不屬于擁有自己企業(yè)的斱式是 : , A、 特許經(jīng)營J, B、 收購J, C、 入伙 relevant Department. (2) personal
32、 injury accident occurred, thedirect punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident
33、occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resu
34、lting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction
35、standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code f
36、or construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-200
37、5 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1, D、投資J我的答案 :D10 以下哪項(xiàng)不是商業(yè)計(jì)劃的誤區(qū)?,, A、 創(chuàng)業(yè)者沒有投資 , , B、引注不明, C、分析不透徹J, D、 市場(chǎng)觃模界定過寬 , 我的答案 :C11rel
38、evant Department. (2) personal injury accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company
39、. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative le
40、adership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, shou
41、ld perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultrasonic inspection and testing results for grade 3GB50236-2002 industrial p
42、ipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vesse
43、ls 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engineering 1 進(jìn)行債務(wù)戒權(quán)益融資的步驟不包括,。, A、 正確決定需要多少資金 , B、 決定最恰當(dāng)?shù)娜谫Y類型 , C、 正確決定資金支出
44、J, D、 發(fā)展戓略以吸引潛在投資家戒銀行家J我的答案 :B12不屬于保護(hù)創(chuàng)意的斱法的是 : , A創(chuàng)意變成可見形式, B、 創(chuàng)意日志Jrelevant Department. (2) personal injury accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, such as concerning administrative sa
45、nctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against them. (4) to conceal the accident,
46、 reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction t
47、eam injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 steel welds manual methods of ultraso
48、nic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding procedure 6 SH3525-2004 petrochemical JB
49、/ T4708-2000 of weldingprocedure qualification for steel pressure vessels 7 JB/4709-2000 8JB4730-2005 pressure vessel welding procedures of steel pressure vessel NDT 9 JB/T4744-2000 steel pressure vessel products mechanical properties test of welded plate II, mechanical equipment installation engine
50、ering 1, C、避免不經(jīng)意的披露 , D、大肆宣傳J我的答案 :D13以下哪項(xiàng)不是企業(yè)成長的 4 種日常挑戓?,, A、現(xiàn)金流管理, B、 價(jià)格穩(wěn)定性J, C、員工支出, D、資本約束我的答案 :Crelevant Department. (2) personal injury accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the accident and the responsibility of leadership, su
51、ch as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of criticism and 50-100 economic sanctions against
52、them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible f
53、or the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2005 steel fusion welded butt joints, welding engineering-Ray lighting and quality rating of 2 GB11345-89 ste
54、el welds manual methods of ultrasonic inspection and testing results for grade 3 GB50236-2002 industrial pipe welding engineering code for construction and acceptance of field equipment 4 HGJ222-92 technical specification for welding of aluminium and its alloys 5 low temperature steel welding proced
55、ure 6 SH3525-2004 petrochemical JB/ T4708-2000 of welding procedure qualification for steel pressure vessels 7 JB/4709-2000 8 JB4730-2005 pressure vessel welding procedures of steel pressure vesselNDT 9 JB/T4744-2000 steel pressure vessel products mechanical propertiestest of welded plate II, mechan
56、ical equipment installation engineering 1 142013年建成的九華山地藏菩薩露天大銅像的高度是,, A、91米J, B、 98米J, C、 99米J, D、 101米J我的答案 :C 15 創(chuàng)建新企業(yè)需要掌握的技能不包括 :, A、 創(chuàng)業(yè)項(xiàng)目的選擇 , B、relevant Department. (2) personal injury accident occurred, the direct punishment 0.5-10,000 yuan, responsible for the direct responsibility for the a
57、ccident and the responsibility of leadership, such as concerning administrative sanctions should be dealt with by the personnel Department of the company. (3) personal injury accident occurs, the direct punishment 500-1000, who is directly responsible for the accident responsibility, give notice of
58、criticism and 50-100 economic sanctions against them. (4) to conceal the accident, reported without undue delay or false, to inform the administrative leadership of the criticism, resulting in serious consequences, the pursuit of leadership, along with 500-1000 punishment. (5) significant near miss should be attempted as the case of responsible for the accident and construction team injuries accident penalty provisions, mutatis mutandis. Eight, should perform in the construction standards and specifications, serial number a 1 GB3323-2
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 二零二五年度人工智能領(lǐng)域?qū)<艺衅概c合作開發(fā)合同
- 二零二五年度街道辦事處社區(qū)工作者社區(qū)交通秩序維護(hù)聘用合同
- 2025年度鋼結(jié)構(gòu)廠房拆除工程環(huán)保驗(yàn)收及拆除合同模板
- 礦山生產(chǎn)承包合同(2025年度)礦山地質(zhì)環(huán)境監(jiān)測(cè)與保護(hù)協(xié)議
- 二零二五年度現(xiàn)代農(nóng)業(yè)裝備制造廠房場(chǎng)地轉(zhuǎn)讓協(xié)議
- 二零二五年度醫(yī)藥行業(yè)人才培養(yǎng)合作框架協(xié)議
- 二零二五年度清潔能源投資融資顧問協(xié)議
- 二零二五年度公共場(chǎng)所保安保潔專項(xiàng)服務(wù)協(xié)議
- 2025年中國保安制服秋裝市場(chǎng)調(diào)查研究報(bào)告
- 中國動(dòng)漫市場(chǎng)運(yùn)營模式及前景發(fā)展方向分析報(bào)告2025-2030年
- 房地產(chǎn)-保租房REITs2024年度綜述:穩(wěn)立潮頭跨越周期
- 2025年湖北省技能高考(建筑技術(shù)類)《建筑制圖與識(shí)圖》模擬練習(xí)試題庫(含答案)
- 2025國家電網(wǎng)公司(第二批)招聘陜西省電力公司高頻重點(diǎn)模擬試卷提升(共500題附帶答案詳解)
- 2025年江蘇連云港瑞馳投資有限公司招聘筆試參考題庫含答案解析
- 二零二四年度嬰幼兒奶粉電商平臺(tái)銷售合作協(xié)議2篇
- 房地產(chǎn)市場(chǎng)報(bào)告 -2024年第四季度大連寫字樓和零售物業(yè)市場(chǎng)報(bào)告
- 簡單的路線圖(說課稿)2024-2025學(xué)年三年級(jí)上冊(cè)數(shù)學(xué)西師大版
- Unit 5 Now and Then-Lesson 3 First-Time Experiences 說課稿 2024-2025學(xué)年北師大版(2024)七年級(jí)英語下冊(cè)
- 《中國心力衰竭診斷和治療指南2024》解讀
- 2025中國人民保險(xiǎn)集團(tuán)校園招聘高頻重點(diǎn)提升(共500題)附帶答案詳解
- 中國食物成分表2020年權(quán)威完整改進(jìn)版
評(píng)論
0/150
提交評(píng)論