


版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡(jiǎn)介
1、母線安裝記錄Bus installation record項(xiàng)目:Project裝置:Unit工號(hào):Sectio n名稱Name施工日期Date電壓等級(jí)VoltagekV圖號(hào)Drawing No.母線型號(hào)、規(guī)格 Bus model and spec.套管、絕緣子型號(hào)Bushing insulator model1、一般安裝檢查:General installation inspection序號(hào)No.檢查調(diào)整項(xiàng)目Inspection and adjustment item安裝檢查結(jié)果Inspection result1母線型號(hào)、規(guī)格、材質(zhì)核對(duì)Bus model, spec, and mat. In
2、spection型號(hào)規(guī)格材質(zhì)ModelSpecificationMaterial2絕緣子、穿墻套管檢查Insulator and lead-in insulator型號(hào)規(guī)格油位、密封絕緣ModelOil level, sealInsulation3母線支架制作安裝Bus support fabrication and installation規(guī)格安裝尺寸防腐Spec.DimensionAnti-corrosion4母線安裝檢查Bus installation排列、相色彎曲倍率伸縮節(jié)Arrangement, colorCurve radiusExpansion joint5連接螺栓、墊圈檢查Bo
3、lt and washer inspection規(guī)格熱鍍鋅露岀長(zhǎng)度Spec.GalvanizationLeft length6母線接觸面Bus contact area inspection光潔平整搪錫電力復(fù)合脂Smooth.Enam.Polymer7硬母線焊接檢查Rigid bus welding inspection焊工合格證號(hào)Weldor No.8軟母線、組合母線安裝Flexible and combine bus installation2、母線接觸面連接緊密檢測(cè):Bus contact. Tightness inspection螺栓規(guī)格(mm) Bolt spec.實(shí)測(cè)力矩值A(chǔ)ctu
4、al(N.m) torque螺栓規(guī)格(mm) Bolt spec.實(shí)測(cè)力矩值(N.m)Actual torque螺栓規(guī)格(mm) Bolt spec.實(shí)測(cè)力矩值(N.m)Actual torque最小值Min.最大值Max.最小值Min.最大值Max.最小值Min.最大值Max.3、軟母線弛度:Flexible bus sag inspection軟母線名稱Flexible bus name設(shè)計(jì)弛度(mm)Design sag實(shí)測(cè)弛度(mm)Actual sag4、母線相同、對(duì)地最小距離檢測(cè):Bus phase and phase to earth min. Distance measure母
5、線類別Bus type主母線Main分支母線Branch實(shí)測(cè)最小相間距離(mm)Min. Phase to phase distance實(shí)測(cè)最小對(duì)地距離Min. Phase to earth distance備注:Remarks結(jié)論:Conclusion技術(shù)負(fù)責(zé)人Check施工人Operator蓄電池充(放)電記錄Storage battery charg in g/Discharg ing record項(xiàng)目Project裝置:Un it工號(hào):Sectio n名稱Name型號(hào)Model岀廠日期Manuf. Date電壓VoltageV容量capacityAh電池總數(shù)Number of batt
6、ery電解液Electrolyte電解液化驗(yàn)單或合格證號(hào)Electrolyte report or certification No.蒸餾水化驗(yàn)單或合格證號(hào)Distilled water report or certification No.注入時(shí)電解液溫度Electrolyte temp. at fillingc電解液比重Specific gravity of electrolyte開始注入時(shí)間Filling start time結(jié)束時(shí)間End time初充電First charging充電開始時(shí)間Charging start time結(jié)束時(shí)間End time單獨(dú)補(bǔ)充充電的電池編號(hào)Separ
7、ately charged cell No.放電Discharging放電開始時(shí)間Discharge start time結(jié)束時(shí)間End time放電電流Discharge current放電容量Discharging capacity為額定容量的% (換算到25C時(shí))% of rated capacity (at 25 C)充(放)電特性曲線圖:(充放電記錄見附表)Charging/Discharging characteristic curve備注:Remarks結(jié)論:Conclusion技術(shù)負(fù)責(zé)人Check施工人Operator蓄電池充(放)電 記錄附表Attached table fo
8、r storage battery charg in g/Discharg ing record項(xiàng)目Project裝置:Unit工號(hào):Sectio n名稱Name型號(hào)Model出廠日期Manufacture date電壓VoltageV容量CapacityAh電池總數(shù)Number of battery時(shí)間Time允(放)電 電壓(V)Charge/Discharge voltage允(放)電 電流(A)Charge/Discharge currentNoNoNoNoNoNoUDTUDTUDTUDTUDTUDT技術(shù)負(fù)責(zé)人Check施工人Operator日期Date電機(jī)抽芯檢查記錄Motor lo
9、ose-core in spect ion record項(xiàng)目Project裝置:Un it工號(hào):Secti on名稱Name位號(hào)Tag. No.檢查日期Inspection Date型號(hào)Type額定容量Rated capacitykW額定電壓Rated voltagekV額定電流Rated currentA接法Connection絕緣等級(jí)Insulation class轉(zhuǎn)速Rotation speedr/min轉(zhuǎn)子結(jié)構(gòu)Rotor structure防爆等級(jí)Explosion proof class岀廠編號(hào)Manufacturer No.制造廠Manufacturer防護(hù)等級(jí)Prevention
10、 class檢查內(nèi)容Installation contents標(biāo)記Mark備注Remark鐵芯軸頸無傷痕銹蝕No Damage & corrosion on surface of core shaft滑環(huán)和換向器無傷痕、銹蝕No Damage & corrosion on surface of commutator and slip-ring繞組絕緣層完好,綁線無松動(dòng)Winding insulation coating and fixing inspection繞組連接正確,焊接良好Winding connection and welding inspection繞組電阻檢測(cè)合
11、格Winding resistance inspection定子槽楔無斷裂凸岀及松動(dòng),端部槽楔牢固Stator slot wedge inspection轉(zhuǎn)子平衡塊緊固,平衡螺絲鎖車Rotor balance block and bolt fixing inspection風(fēng)扇完好,方向正確Fan inspection磁極及鐵軛固定良好Magnetic pole and hub fixing inspection勵(lì)磁繞組緊固Exciter winding fixing inspection鼠籠式電機(jī)轉(zhuǎn)子導(dǎo)電條和端環(huán)焊接良好,澆鑄無裂紋Rotor conductor and end link o
12、f squirrel-cage motor軸承滾動(dòng)體與內(nèi)、外圈轉(zhuǎn)動(dòng)靈活無松動(dòng)、卡澀Bearing rotating flexibility inspection力口入軸承內(nèi)的潤滑脂已填滿內(nèi)部空間的三分之二Internal space of bearing is filled with lubrication grease電機(jī)機(jī)部清潔無雜物Motor internal cleanliness inspection結(jié)論:Conclusion技術(shù)負(fù)責(zé)人Check施工人Operator電機(jī)干燥記錄Motor drying record項(xiàng)目Project裝置:Unit工號(hào):Sectio n名稱Name位
13、號(hào)Tag. No.干燥日期Drying Date型號(hào)Type額定容量Rated capacitykW絕緣等級(jí)Insulation class定子電壓Stator voltageV轉(zhuǎn)子電壓Rotor voltageV制造丿Manufacturer定子電流Stator currentA轉(zhuǎn)子電流Rotor currentA岀廠日期Manuf. Date接線Connection轉(zhuǎn)速Rotation speedr/min岀廠編號(hào)Manufacturer No.干燥方法簡(jiǎn)述Brief discription of drying method干燥開始時(shí)間Drying start time年月日時(shí)分Date干
14、燥結(jié)束時(shí)間Drying end time年月日時(shí)分Date干燥過程最高溫度Max. drying temp.定子CStator轉(zhuǎn)子CStator干燥后絕緣電阻及吸收比Insulation resistance and absorptance after drying測(cè)試部位Test position定子對(duì)地Stator to earth轉(zhuǎn)子對(duì)地Rotor to earth電機(jī)溫度(C)Motor temperatureR15" (M Q)R60" ( M Q)KR15" ( M Q)R60" (M Q)K備注:Remarks結(jié)論:Conclusion技術(shù)
15、負(fù)責(zé)人Check施工人Operator電機(jī)干燥記錄附表Attached table for motor drying record項(xiàng)目Project裝置:Un it工號(hào):Secti on時(shí)間Time溫.度(C)Temp.定子絕緣電阻(M Q)Stator ins. resistance轉(zhuǎn)子絕緣電阻(M Q)Rotor i ns. resista nee干燥電流(A)Drying curre nt備注Remark123456測(cè)溫點(diǎn)位置:nTemp. measure position1.;2.;3.;4.;5.;6.;技術(shù)負(fù)責(zé)人Check施工人Operator日期Date電機(jī)試車記錄Motor t
16、est run record項(xiàng)目Project裝置:Unit工號(hào):Sectio n序號(hào)No.電機(jī)名稱或 位號(hào)Motor name or tag. No.額定數(shù)據(jù)Rated data試車記錄數(shù)據(jù) Test run record data環(huán)境 溫度 (C)En vi-ro nment temp.試車 日期Date容量(kW) Capa-city電壓(V)Vol-tage電流(A) Curr.絕緣 等級(jí)Ins. class絕緣電阻(M Q)Ins. resis.電壓(V)Vol-ta ge空載電流(V)Vol-tage負(fù)載 電流(A) No-Lo ad curr.電機(jī) 溫度(A)Motor temp
17、.軸承溫度(C)Bearing temp.前Front后Rear備注:Remarks結(jié)論:Conclusion技術(shù)負(fù)責(zé)人Check施工人Operator架空線路施工記錄Overhead line stri nging record項(xiàng)目Project裝置:Un it工號(hào):Sectio n線路名稱Line name施工日期Date線路電壓VOltage線數(shù)Line number線路長(zhǎng)度Length線路起點(diǎn)Start place線路終點(diǎn)End place施工記錄Stringing record電桿型號(hào)、規(guī)格及數(shù)量Pole model, spec. Quantity拉線材料及組數(shù)Stay materi
18、al and quantity導(dǎo)線型號(hào)及規(guī)格 Line model and spec.路燈型號(hào)及數(shù)量Road lamp model and quantity絕緣子型號(hào)及規(guī)格 Insulator model and spec.路燈線型號(hào)及規(guī)格Toad line model and spec.弛度Sag耐張桿號(hào)(號(hào)一號(hào))Anchor pole (No. No.)設(shè)計(jì)弛度(mm)Design sag實(shí)測(cè)馳度(mm)Real sag環(huán)境溫度(C)Environment temp.對(duì)地、交叉跨越距離測(cè)量:Line to earth and to cross-over objects distance m
19、easurement跨越桿號(hào) 號(hào)一號(hào)Cross-over pole No.-N0.被跨越物名稱Cross-over object name被跨越物對(duì)最近桿、塔的水平距離(m)The nearest distance between crossover object and pole導(dǎo)線對(duì)被跨越物的最小垂直距離 (m)Min. Vertical distance from line to cross-over object溫度(C)Temp.線中絕緣電阻(M Q)Line insulation resistanceA B , C, E , OBA , C, E, OC A , B, E, O相位
20、檢查Phase sequence inspection備注:Remarks結(jié)論:Conclusion技術(shù)負(fù)責(zé)人Check施工人Operator避雷、接地裝置安裝記錄Light ning con ductor and earthi ng devicein stallati on record項(xiàng)目Project裝置:Unit工號(hào):Sectio n名稱Name施工圖號(hào)Drawing No.1繪圖或簡(jiǎn)述避雷及接地裝置情況(種類、材質(zhì)、規(guī)格、長(zhǎng)度、埋入深度、數(shù)量、連接萬法、尺寸及防腐等)Drawing or brief discription of the lightning conductor and
21、 earthing device (kind, material, specification, buried length, quantity, connection, dimension and anti-corrosion, etc.)2接地電阻測(cè)量記錄Grounding resistance measurement record序號(hào)No.測(cè)試位置Measure position接地電阻(Q)Ground. resistance試驗(yàn)日期Measure date當(dāng)天及三天前天氣情況Weather of the day and three days ago備注:Remarks結(jié)論:Concl
22、usion技術(shù)負(fù)責(zé)人Check施工人Operator試驗(yàn)人Tester電氣安裝記錄Electrical installation record項(xiàng)目Project裝置:Unit工號(hào):Sectio n技術(shù)負(fù)責(zé)人Check施工人Operator交流電機(jī)試驗(yàn)報(bào)告AC Motor test report項(xiàng)目Project裝置:Un it工號(hào):Sectio n名稱Name位號(hào)Tag. No.試驗(yàn)日期Test Date額定容量Rated capacity(kW)型號(hào)Model岀廠編號(hào)Manuf. No.絕緣等級(jí)Insulation class定子電壓Stator voltageV定子電流Stator cur
23、rentA額定轉(zhuǎn)速Rated rpmr/min接線方式Connect mode轉(zhuǎn)子電壓Rotor voltageV轉(zhuǎn)子電流Rotor currentA相數(shù)Phase number防爆等級(jí)E. P. class直流電阻測(cè)量 DC Resistance measure溫度 Temp.°C定子繞組相別Stator phase直流電阻(Q)DC Resistance轉(zhuǎn)子繞組相別(Q)Rotor phase直流電阻(Q)DC Resistance各相直流電阻差別DC Resistance deviation定子 Stator%;轉(zhuǎn)子 Rotor%;定子繞組極性Stator wind, pola
24、r.絕緣試驗(yàn)Insulation test繞組名稱Wind name絕緣電阻 (M Q)Ins. resis吸收比Absorp-ta nce交流耐壓電壓(kV)AC Withstanding voltage時(shí)間(mm) Time直流耐壓電壓(kV)DC Withstanding voltage時(shí)間(mm) Time直流泄漏電流A)DC Leakage current定子繞組Stator wind轉(zhuǎn)子繞組Rotor wind電機(jī)軸承絕緣電阻(M Q)Bearing ins. resistance附屬設(shè)備檢查Auxiliary device test設(shè)備名稱Device name絕緣電阻(M Q)
25、Insulation resistance直流電阻(Q)DC Resistance起動(dòng)電阻器Start-up resistor可變電阻器Variable resistor滅磁電阻器Magnetic extinguisher備注:Remarks結(jié)論:Conclusion技術(shù)負(fù)責(zé)人Check試驗(yàn)人Operator直流電機(jī)試驗(yàn)報(bào)告DC motor test report項(xiàng)目Project裝置:Un it工號(hào):Sectio n名稱Name位號(hào)Tag. No.試驗(yàn)日期Test Date額定容量Rated capacitykW型號(hào)Model岀廠編號(hào)Manuf. No.勵(lì)磁方式Excite mode額定電壓
26、Rated voltageV額定電流Rated currentA額定轉(zhuǎn)速Rated rpmr/min工作率Work ratio勵(lì)磁電壓Excite voltageV勵(lì)磁電流Excite currentA1試驗(yàn)與檢查 Test and inspection環(huán)境溫度: Environment temp.°C勵(lì)磁繞組的絕緣電阻及交流耐硬度試驗(yàn)Excite wind. Ins. R & AC withstanding voltage testM QkVmin電樞的絕緣電阻及交流耐壓試驗(yàn)Armtr. Ins. R & AC withstanding voltage testM
27、QkVmin勵(lì)磁繞組的直流電阻Excite wind DC resistanceQ電樞整流片間的直流電阻Armtr. Back-to 七ack DC resistanceQ勵(lì)磁可變電阻器的直流電阻DC R of Excite variable resistorQ繞組極性及其接線檢查Wind. Polar. & connection碳刷位置檢查Bruch position inspection2.發(fā)電機(jī)的空載特性Generator no-Load characteristics勵(lì)磁電流(A)Excite current電壓(V)Voltage備注:Remarks結(jié)論:Conclusion
28、技術(shù)負(fù)責(zé)人Check試驗(yàn)人Operator變壓器試驗(yàn)報(bào)告Tran sformer test report項(xiàng)目:Project裝置:Un it工號(hào):Sectio n名稱Name位號(hào)Tag. No.試驗(yàn)日期Test Date額定容量Rated capacitykVA型號(hào)Model岀廠編號(hào)Manuf. No.接線組別Connection額定電壓Rated voltagekV額定電流Rated currentA阻抗Resistance%冷卻方式Cool. mode直流電阻測(cè)量: AC Resistance measure溫度:C Temp.高壓側(cè)HV sideI(Q)n(Q)m(Q)IV(Q)V(Q)
29、低壓側(cè)LV side電阻(Q)ResistanceAaBbCc誤差%Error變壓比檢查:Transformer rate inspection分接開關(guān)位置Tap position標(biāo)稱變比Nominal rate高壓側(cè)電壓/低壓側(cè)電壓HV/LV實(shí)測(cè)變壓比Real rate變壓比誤差(%)Rate errorUAB/Uab(V )UBC/Ubc(V)UCA/Uca(A)ABBCCAABBCCAInmIVV絕緣試驗(yàn):Insulation test項(xiàng)目Item絕緣電阻及Ins. R anR607文吸收比d AbsorbtR15"交流耐壓試驗(yàn)AC withstanding voltage t
30、est直流泄漏試驗(yàn)DC leakage test介質(zhì)損失角正切值Loose tg 8R60"/R15"吸收比Absorb-tance電壓(kV) Voltage時(shí)間(min)Time電壓(kV) Voltage電流5 A)Currenttg8 (%)溫度 (C)Temp.高壓一低壓及地HV LV/Earth低壓一高壓及地LV HV/Earth絕緣油試驗(yàn):油號(hào)#:五次擊穿電壓平均值: kVIns. Oil test: oil No. , average voltage for 5 break down is接地組別或極性檢查Connection inspection備注:Re
31、marks結(jié)論:Conclusion技術(shù)負(fù)責(zé)人Check試驗(yàn)人Operator斷路器試驗(yàn)報(bào)告Circit breaker test report項(xiàng)目:Project裝置:Un it工號(hào):Sectio n名稱Name位號(hào)Tag. No.試驗(yàn)日期Test Date型號(hào)Model額定電壓Rated voltagekV額定電流Rated currentA開斷電流M. currentkA'操動(dòng)機(jī)構(gòu)型號(hào)Operation mechanism操作電壓Oper. voltage岀廠編號(hào)Manuf. No.導(dǎo)電回路直流電阻測(cè)量真空斷路滅弧室真空度檢查DC Resistance of primary ci
32、rcuitVacuum insp. for vacuum breaker六氟化硫斷路器氣體壓力Gas press. Insp. for SF6 breaker相別Phase主觸頭(|iQ)Main contact滅弧觸頭(iQ)Arc-Extinguishing contact相別Phase電壓(kV) Voltage時(shí)間(min)Time相別Phase壓力(Mpa)PressureAAABBBCCC機(jī)械特性:Meeh. Characteristic最低合閘電壓Min. close voltage最低分閘電壓Min. openn voltage合閘時(shí)間Close time分閘時(shí)間Open ti
33、me合閘時(shí)間Close time分閘時(shí)間Open timeVVssm/sm/s線圈試驗(yàn):Coil test絕緣試驗(yàn):Insulation. Test項(xiàng)目Item合閘接觸器Close contact合閘線圈Close coil分閘線圈Open coil相別Phase絕緣電阻(M Q)Ins. resis.交流試驗(yàn)電壓(kV) AC test voltage時(shí)間(min) Time直流電阻DC Resis.QQQA B 絕緣電阻Ins. resis.M QM QM QC 斷路器在額定操作電壓下分合閘次,動(dòng)作良好。Breaker open/closetime with rated oper, vol
34、tage and operate well絕緣油五次擊穿電壓的平均值:Average voltage for 5 breaking down iskV備注:Remarks結(jié)論:Conclusion技術(shù)負(fù)責(zé)人Check試驗(yàn)人Operator電力電纜試驗(yàn)報(bào)告Power cable test report項(xiàng)目Project裝置:Un it工號(hào):Sectio n名稱Name試驗(yàn)日期Test Date規(guī)格型號(hào)Spec./Model額定電壓Rated voltagekV長(zhǎng)度Lengthm中間頭數(shù)Number of connection電纜起點(diǎn)Start point電纜終點(diǎn)End point絕緣電阻Insu
35、lation resistance相別PhaseA BB CC AA EB EC E絕緣電阻(M Q)直流耐壓及泄漏電流DC withstanding voltage and leakage current試驗(yàn)電壓(kV)Test voltage時(shí)間(min)Time泄漏電流Leak, curr.5 A)A B , C, EB C, A , EC A , B, E相位檢查Phase inspection備注:Remarks結(jié)論:Conclusion技術(shù)負(fù)責(zé)人Check試驗(yàn)人Operator電壓互感器試驗(yàn)報(bào)告P T test report項(xiàng)目Project裝置:Un it工號(hào):Sectio n名
36、稱Name位號(hào)Tag. No.額定電壓Rated voltageV/V ; V型號(hào)Model接線線別Connection準(zhǔn)確等級(jí)Precision容量CapacityVA最大容量Max. Cap.VA制造丿Manufacturer岀廠編號(hào)Manuf. No.A 相 No. Phase AB 相 No.C 相 No.Phase BPhase C試驗(yàn)日期Test date相別1絕緣電阻R60"R15"Insulation resistance交流耐壓AC withstanding.Voltage.介質(zhì)損耗Loose tg 8Phase一次對(duì)二次,輔助及 地( M Q)Pri.
37、To sec., Aux. and E.二次對(duì)一次,輔助及 地( M Q)Sec. To pri., aux. and E.輔助對(duì)一次,二次及地 (M Q)Aux. To pri. , sec. and E.電壓(kV)Voltage時(shí)間(min)Timetg8(%)溫度 (C)Temp.ABC繞組直流電阻溫度CWind DC RTemp.絕緣油擊穿電壓Oil break down voltage接線組別或極性檢查Connection inspection相別Phase一次線圈(Q)Primary coil相別Phase五次平均值(kV)Average for 5 timesABC變壓比檢查T
38、ransform rate inspection額定電壓下的空載電流測(cè)量No-load curr. With rated voltage.相別Phase標(biāo)稱變比Rated rate一次電壓(V)Pri. voltage二次電壓(V)Sec. voltage實(shí)測(cè)變比Real rate變比誤差(%)Rate error相別Phase空載電流(mA)No-load curr.AABBCC備注:Remarks結(jié)論:Conclusion技術(shù)負(fù)責(zé)人Check試驗(yàn)人Operator電流互感器試驗(yàn)報(bào)告C T test report項(xiàng)目Project裝置:Un it工號(hào):Sectio n名稱Name位號(hào)Tag. No.試驗(yàn)日期Test date型號(hào)Model準(zhǔn)確等級(jí)Precision電壓等級(jí)Voltage電流比Curr. rate二次負(fù)荷Sec. load制造廠Manufacturer出廠編號(hào)與相別A相No.Manuf. No. and phase Phase AB 相 No. Phase BC 相 No. Phase C絕緣試驗(yàn):Ins. test相別絕緣電阻R60"R15"Insula
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 汽車行業(yè)合同樣本:會(huì)員服務(wù)協(xié)議
- 移動(dòng)基站租賃合同書范本
- 城市老舊小區(qū)消防系統(tǒng)改造項(xiàng)目合同
- 幼兒園臨時(shí)教師聘任合同
- 新版民間房產(chǎn)抵押權(quán)轉(zhuǎn)讓合同
- 腎性水腫課件
- 智能化煤礦培訓(xùn)課件下載
- 舊貨零售互聯(lián)網(wǎng)+創(chuàng)新實(shí)踐考核試卷
- 搪瓷器的創(chuàng)造思維與創(chuàng)意設(shè)計(jì)考核試卷
- 建筑施工現(xiàn)場(chǎng)安全監(jiān)測(cè)與預(yù)警考核試卷
- 2025年黑龍江交通職業(yè)技術(shù)學(xué)院?jiǎn)握新殬I(yè)技能測(cè)試題庫必考題
- 個(gè)人畫協(xié)議合同范本
- 2024-2025學(xué)年高一下學(xué)期開學(xué)第一節(jié)課(哪吒精神)主題班會(huì)課件
- 人教版2025-初中物理實(shí)驗(yàn)室實(shí)驗(yàn)課程安排
- 2024年無錫科技職業(yè)學(xué)院高職單招語文歷年參考題庫含答案解析
- 舞蹈藝術(shù)賞析課件
- 2025江蘇泰州興化市陳堡鎮(zhèn)村級(jí)后備干部招聘10人歷年高頻重點(diǎn)提升(共500題)附帶答案詳解
- (完整版)python學(xué)習(xí)課件
- CNAS-RL01:2019實(shí)驗(yàn)室認(rèn)可規(guī)則
- 成人腦室外引流護(hù)理-中華護(hù)理學(xué)會(huì)團(tuán)體 標(biāo)準(zhǔn)
- 2024年甘肅省公務(wù)員考試《行測(cè)》真題及答案解析
評(píng)論
0/150
提交評(píng)論