1、建設(shè)工程設(shè)計(jì)合同,中英文篇一:建設(shè)工程設(shè)計(jì)合同(中英文對(duì)照版)建設(shè)工程設(shè)計(jì)合同(二)(專業(yè)建設(shè)工程設(shè)計(jì)合同)Engineering Service Contract ()(Professional Engineering Service Contract For Construction Project) 工 程 名 稱: 工 程 地 點(diǎn):合 同 編 號(hào):(由設(shè)計(jì)人編填)設(shè)計(jì)證書等級(jí):發(fā) 包 人:設(shè) 計(jì) 人:簽 訂 日 期:Name of the project:Location of the project: Contract No.: (Filled in by the Designer)

2、 Level of the design certificate: Employer: Designer:Date of contract: November 25, XX監(jiān)制中華人民共和國(guó)建設(shè)部國(guó)家工商行政管理部Supervised by: Jiangsu Provincial Department of ConstructionJiangsu Provincial Administration for Industry and Commerce 發(fā)包人: 設(shè)計(jì)人:發(fā)包人委托設(shè)計(jì)人承擔(dān) _工程設(shè)計(jì),工程地點(diǎn)為_(kāi) ,經(jīng)雙方協(xié)商一致,簽訂本合同,共同執(zhí)行。Employer: (Party A)D

3、esigner: (Party B)The Employer entrust the Designer to undertake the engineering design of the 10/ transformer station and the location for the project is within the plant of After friendly consultation, the Parties hereby sign this Contract as follows:第一條 本合同簽訂論據(jù)中華人民共和國(guó)合同法、中華人民共和國(guó)建筑法和建設(shè)工程勘察設(shè)計(jì)市場(chǎng)管理規(guī)定

4、。國(guó)家及地方有關(guān)建設(shè)工程勘察設(shè)計(jì)管理法規(guī)和規(guī)章。建設(shè)工程批準(zhǔn)文件。Article 1 Basis for the conclusion of this Contract The Contract Law of the Peoples Republic of China; The Construction Law of the Peoples Republic of China; Regulations on the Administration of the Market for Survey and Design of Engineering Construction. National a

5、nd local rules and regulations on the administration of the market for survey and design of engineering construction Approval documents of the engineering construction第二條 設(shè)計(jì)依據(jù)發(fā)包人給設(shè)計(jì)人的委托書或設(shè)計(jì)中標(biāo)文件發(fā)包人提交的基礎(chǔ)資料設(shè)計(jì)人采用的主要技術(shù)標(biāo)準(zhǔn)是:Article 2 Basis for design of the engineering construction Letter of Authority or d

6、ocuments on letter of acceptance provided by the Employer to the Designer. Basic materials submitted by the Employer. The main technological standards adopted by the Designer is as follows:第三條 合同文件的優(yōu)先次序構(gòu)成本合同的文件可視為是能互相說(shuō)明的,如果合同文件存在歧義或不一致,則根據(jù)如下優(yōu)先次序來(lái)判斷:合同書中標(biāo)函(文件)發(fā)包人要求及委托書投標(biāo)書Article 3 Priority of the con

7、tractual documentsThe several documents forming the Contract are to be taken as mutually explanatory of one another, but in case of ambiguities or discrepancies, the priority of the documents forming, the Contract shall be as follows:(1) The Contract;(2) The Letter of Acceptance (documents);(3) Requ

8、irements of the Employer and letter of authority;(4) The Tender;第四條 本合同項(xiàng)目的名稱、規(guī)模、階段、投資及設(shè)計(jì)內(nèi)容(根據(jù)行業(yè)特點(diǎn)填寫) Article 4 Name, size, stages, investment and content of design(which may be filled in according to the characteristics of the industry)第五條 發(fā)包人向設(shè)計(jì)人提交的有關(guān)資料、文件及時(shí)間序號(hào) 資料及文件名稱 份數(shù) 提交日期 有關(guān)事宜Article 5 Materia

9、ls and documents delivered by the Employer to the Designer and time for delivery of materials and documents1. ;2. ;3. Official reply of the power supply department on consent of the power supply.第六條 設(shè)計(jì)人向發(fā)包人交付的設(shè)計(jì)文件、份數(shù)、地點(diǎn)及時(shí)間序號(hào) 資料及文件名稱 份數(shù) 提交日期 有關(guān)事宜Article 6 Delivery of design documents by the Designer

10、to the constract issuing party and copies, location and time for the deliveryThe Designer shall deliver to the Employer all set of drawings of the electrical design with eight copies in total. And the Employer may take all drawings from the Wuxi Civil Engineering Construction Institute Co., Ltd. on

11、,第七條 費(fèi)用雙方商定,本合同的設(shè)計(jì)費(fèi)為_(kāi)萬(wàn)元。收費(fèi)依據(jù)和計(jì)算方法按國(guó)家和地方有關(guān)規(guī)定執(zhí)行,國(guó)家和地方?jīng)]有規(guī)定的,由雙方商定。如果上述費(fèi)用為估算設(shè)計(jì)費(fèi),則雙方在初步設(shè)計(jì)審批后,按批準(zhǔn)的初步設(shè)計(jì)概算核算設(shè)計(jì)費(fèi)。工程建設(shè)期間如遇概算調(diào)整,則設(shè)計(jì)費(fèi)也應(yīng)做相應(yīng)調(diào)整。Article 7 Charges The Parties agree that charges for the design hereunder shall be % of the total investment of the transformer (the appraised price of this contract shall

12、 be taken as basis). The basis for charges and the method of computing shall be in accordance with relevant national and local provisions. Where there are no relevant national and local provisions, it shall be discussed and determined by the Parties.第八條 支付方式本合同生效后三天內(nèi),發(fā)包人支付設(shè)計(jì)費(fèi)總額的20%,計(jì)_萬(wàn)元作為定金(合同結(jié)算時(shí),定金

13、低作設(shè)計(jì)費(fèi))。設(shè)計(jì)人提交_設(shè)計(jì)文件后三天內(nèi),發(fā)包人支付設(shè)計(jì)總額的30%,計(jì)_萬(wàn)元;之后,發(fā)包人應(yīng)按設(shè)計(jì)人所完成的施工圖工作量比例,分期分批向設(shè)計(jì)人支付總設(shè)計(jì)費(fèi)的20%,計(jì)_萬(wàn)元,施工圖完成后,發(fā)包人結(jié)清設(shè)計(jì)費(fèi),不留尾款。雙方委托銀行代付代收有關(guān)費(fèi)用。Article 8 Terms of payment Within three days upon the effectiveness of this contract, the Employer shall pay 1% of RMB 1,800,000yuan, the appraised price of investment to the

14、transformer, namely RMB1,8000 yuan as the down payment.( the down payment shall be counted as the charges for design upon settlement of the contract). The Designer shall submit eight sets of design documents to Party A for submission to the power supply department and the Employer will pay % of RMB

15、1,800,000yuan, the appraised price of investment to the transformer, namely RMB 6,3000 yuan, without any remainder. The Parties shall entrust bank to collect and pay for relevant charges.第九條 雙方責(zé)任發(fā)包人責(zé)任發(fā)包人按本合同第五條規(guī)定的內(nèi)容,在規(guī)定的時(shí)間內(nèi)向設(shè)計(jì)人提交基礎(chǔ)資料及文件,并對(duì)其完整性、正確性及時(shí)限負(fù)責(zé)。發(fā)包人不得要求設(shè)計(jì)人違反國(guó)家有關(guān)標(biāo)準(zhǔn)進(jìn)行設(shè)計(jì)。發(fā)包人提交上述資料及文件超過(guò)規(guī)定期限15天以內(nèi),

16、設(shè)計(jì)人按本合同第六條規(guī)定的交付設(shè)計(jì)文件時(shí)間順延;發(fā)包人交付上述資料及文件超過(guò)規(guī)定期限15天以上時(shí),設(shè)計(jì)人有權(quán)重新確定提交設(shè)計(jì)文件的時(shí)間。Article 9 Responsibilities of the Parties Responsibilities of the Employer The Employer shall submit to Designer basic materials and documents withinspecified period as provided in Article 5 of this contract and shall be responsible

17、 for the completeness, accuracy and time limit of the materials and documents. The Employer shall not require the Designer to conduct design in violation of relevant national standards. In case there is a delay of less than 15 days exceeding the specified time limit for the delivery of the above mat

18、erials and documents by the Employer, the time limit for the Designer to deliver design documents shall be extended accordingly; in case there is a delay of more than 15 days exceeding the specified time limit for the delivery of the above materials and documents by the Employer, the Designer shall

19、have the right to re-determine the time for delivery of the design documents.發(fā)包人變更委托設(shè)計(jì)項(xiàng)目、規(guī)模、條件或因提交的資料錯(cuò)誤,或所提交資料作較大修改,以致造成設(shè)計(jì)人設(shè)計(jì)返工時(shí),雙方除另行協(xié)商簽訂補(bǔ)充協(xié)議(或另訂合同)、重新明確有關(guān)條款外,發(fā)包人應(yīng)按設(shè)計(jì)人所耗工作量向設(shè)計(jì)人支付返工費(fèi)。在未簽訂合同前發(fā)包人已同意,設(shè)計(jì)人為發(fā)包人所做的各項(xiàng)設(shè)計(jì)工作,發(fā)包人應(yīng)支付相應(yīng)設(shè)計(jì)費(fèi)。 In case of the Designers rework on the design resulted for changes of the

20、 engineering, size and conditions of the design by the Employer or mistakes of the materials submitted or major revision on the submitted materials, the Parties shall conclude supplementary agreement separately (or conclude additional agreement) and redefine relevant terms and conditions, and the Em

21、ployer should pay charges for rework to the Designer according to the workload.The Employer has agreed before the conclusion of the contract that it will pay charges of design to the Designer for all the design works conducted by the Designer.在合同履行期間,發(fā)包人要求終止或解除合同,設(shè)計(jì)人未開(kāi)始設(shè)計(jì)工作的,不退還發(fā)包人已付的定金;已開(kāi)始設(shè)計(jì)工作的,發(fā)包人

22、應(yīng)根據(jù)設(shè)計(jì)人已進(jìn)行的實(shí)際工作量,不足一半時(shí),按該階段設(shè)計(jì)費(fèi)的一半支付;超過(guò)一半時(shí),按該階段設(shè)計(jì)費(fèi)的全部支付。 During the performance of the contract, if the Employer requires to terminate or cancel the contract before the Designer starts the design work, the Designer will not return the down payment already paid by the Employer; if the Designer has star

23、ted the design work, the Employer shall pay for the actual workload already done by the Designer. When the actual workload of the design is less than half of the work at the stage, the Employer shall pay half of the payment for the design work at the stage. When the actual workload of the design is

24、more than half of the work at the stage, the Employer shall pay all the payment for the design work at the stage.發(fā)包人必須按合同規(guī)定支付定金,收到定金作為設(shè)計(jì)人設(shè)計(jì)開(kāi)工的標(biāo)志。未收到定金,設(shè)計(jì)人有權(quán)推遲設(shè)計(jì)工作的開(kāi)工時(shí)問(wèn),且交付文件的時(shí)間順延。 The Employer should pay down payment as provided by the contract and receipt of down payment will be the symbol for the

25、commencement of the design work by the Designer. The Designer shall have the right to put off the commencement date of the design work if it has not received the down payment and the time for delivery shall be extended accordingly.發(fā)包人應(yīng)按本合同規(guī)定的金額和日期向設(shè)計(jì)人支付設(shè)計(jì)費(fèi),每逾期支付一天,應(yīng)承擔(dān)應(yīng)支付金額千分之二的逾期違約金,且設(shè)計(jì)人提交設(shè)計(jì)文件的時(shí)間順延。

26、逾期超過(guò)30天以上時(shí),設(shè)計(jì)人有權(quán)暫停履行下階段工作,并書面通知發(fā)包人。發(fā)包人的上級(jí)或設(shè)計(jì)審批部門對(duì)設(shè)計(jì)文件不審批或本合同項(xiàng)目停緩建,發(fā)包人均應(yīng)支付應(yīng)付的設(shè)計(jì)費(fèi)。 The Employer should pay charges for design to the Designer at the amount and date provided in this Contract. For each day of overdue payment, 2 of the overdue payment shall be paid as damages for overdue payment and the

27、 time for delivery by the Designer shall be extended accordingly. Where the delay of payment has exceeded 30 days, the Designer shall have the right to suspend the performance of the work at the next stage and give written notice to the Employer. In case the higher authority or competent department

28、of design approval would not approve the design documents or the engineering construction of this contract is suspended or stopped, the Employer should pay the payable charges for design.發(fā)包人要求設(shè)計(jì)人比合同規(guī)定時(shí)間提前交付設(shè)計(jì)文件時(shí),須征得設(shè)計(jì)人同意,不得嚴(yán)重背離合理設(shè)計(jì)周期,且發(fā)包人應(yīng)支付趕工費(fèi)。發(fā)包人應(yīng)為設(shè)計(jì)人派駐現(xiàn)場(chǎng)的工作人員提供工作、生活及交通等方面的便利條件及必要的勞動(dòng)保護(hù)裝備。設(shè)計(jì)文件中選用的國(guó)

29、家標(biāo)準(zhǔn)圖、部標(biāo)準(zhǔn)圖及地方標(biāo)準(zhǔn)圖由發(fā)包人負(fù)責(zé)解決。 If the Employer require the Designer to delivery the design documents in advance, it should get the prior consent of the Designer without serious deviation from the reasonable design circle, and the Employer shall pay the crush cost. The Employer should offer conveniences in

30、 aspects of working, living and traffic and necessary labor-protection equipments. The Employer shall be responsible for the national standard drawing, ministerial standard drawing and local standard drawings.承擔(dān)本項(xiàng)目外國(guó)專家來(lái)設(shè)計(jì)人辦公室工作的接待費(fèi)(包括傳真、電話、復(fù)印、辦公等費(fèi)用)。 9 The Employer shall bear the expenses for receiv

31、ing foreign expert in charge of the engineering to the Designers office (including expenses on fax, telephone and office affairs).設(shè)計(jì)人責(zé)任設(shè)計(jì)人應(yīng)按國(guó)家規(guī)定和合同約定的技術(shù)規(guī)范、標(biāo)準(zhǔn)進(jìn)行設(shè)計(jì),按本合同第六條規(guī)定的內(nèi)容、時(shí)間及份數(shù)向發(fā)包人交付設(shè)計(jì)文件(出現(xiàn)、規(guī)定有關(guān)交付設(shè)計(jì)文件順延的情況除外)。并對(duì)提交的設(shè)計(jì)文件的質(zhì)量負(fù)責(zé)。設(shè)計(jì)合理使用年限為 年。負(fù)責(zé)對(duì)外商的設(shè)計(jì)資料進(jìn)行審查,負(fù)責(zé)該合同項(xiàng)目的設(shè)計(jì)聯(lián)絡(luò)工作。 Designers responsibilities Th

32、e Designer should carry out design work in accordance with technological rules and standards provided in this contract or the state, and deliver design documents as the content, time and copies specified in Article 6 of this Contract (except for the circumstances provided in Art. , , , under which t

33、he delivery of design documents may be extended), and shall be responsible for the quality of the design documents. The design life of the engineering construction shall be years. The Designer shall be responsible for the scrutiny on the foreign investors design material and contact on the design of

34、 the engineering.設(shè)計(jì)人對(duì)設(shè)計(jì)文件出現(xiàn)的遺漏或錯(cuò)誤負(fù)責(zé)修改或補(bǔ)充。由于設(shè)計(jì)人設(shè)計(jì)錯(cuò)誤造成工程質(zhì)量事故損失,設(shè)計(jì)人除負(fù)責(zé)采取補(bǔ)救措施外,應(yīng)免收受損失部分的設(shè)計(jì)費(fèi),并根據(jù)損篇二:建設(shè)工程委托設(shè)計(jì)合同(中英文對(duì)照)建設(shè)工程設(shè)計(jì)合同Construction Project Design Contract 項(xiàng)目名稱: Project Name:項(xiàng)目建設(shè)地點(diǎn):Project Location:合同編號(hào):Contract No.:設(shè)計(jì)證書等級(jí):Grade of Design License:委托方:Client:承接方:Design Firm:簽訂日期:Signed on:委托方:(甲方)C

35、lient (Party A):承接方:(乙方)Design Firm (Party B): 甲方委托乙方承擔(dān)XX 項(xiàng)目(一期)工程設(shè)計(jì),經(jīng)雙方協(xié)商一致, 簽訂本合同。 Party A entrusts Party B to undertake the design for This Contract is made by the two parties after their mutual agreement. 第一條 本合同依據(jù)下列文件簽訂 Article 1. This Contract is made on the basis of the following documents: 中

36、華人民共和國(guó)合同法、中華人民共和國(guó)建筑法和建設(shè)工程勘察設(shè)計(jì)市場(chǎng)管理規(guī)定。 The Contract Law of the Peoples Republic of China,The building regulations of thePeoples Republic of China and Th(來(lái)自: 校 園生活:建設(shè)工程設(shè)計(jì)合同,中英文)e developmental Law of the Peoples Republic ofChina. 國(guó)家及地方有關(guān)建設(shè)工程勘察設(shè)計(jì)管理法規(guī)和規(guī)章。 Relevant Building & Design Codes and Regulati

37、ons of the State and of the ShanghaiMunicipality. 建設(shè)工程的相關(guān)批準(zhǔn)文件。 The approval documents that are required for this construction project.第二條 本合同工程設(shè)計(jì)項(xiàng)目的名稱、 地點(diǎn)、 規(guī)模、 投資、內(nèi)容及 標(biāo)準(zhǔn)Article 2. The name, location, size, investment sum, function, design contents and standards : 工程項(xiàng)目的名稱: XX 項(xiàng)目 (一期) Project name: 工程

38、項(xiàng)目的地點(diǎn): Project location: 工程項(xiàng)目的規(guī)模: 總建筑面積約 平方米(其中地下面積約 平方米),高度 米。 Project size:The total floor area is approximately m2(of which the floor area of the underground area is m2),the total height is m. 工程特征及附注說(shuō)明: 商業(yè)辦公綜合樓 Project features & remarks: A commercial cum office building complex 工程項(xiàng)目的投資總額:控制

39、在 億元人民幣以下 Project investment in total: Controlled Within RMB million yuan RMB 工程項(xiàng)目的設(shè)計(jì)內(nèi)容及標(biāo)準(zhǔn):紅線內(nèi)的建筑、結(jié)構(gòu)、機(jī)電、總體設(shè)計(jì)(包括3000m2 人防設(shè)計(jì),不包括精裝修設(shè)計(jì)、園藝設(shè)計(jì)和藝術(shù)泛光照明等專業(yè)設(shè)計(jì)),施工圖設(shè)計(jì)約為70000 m2(不包括五層到七層的SOHO 區(qū)域 Design requirements and scope of work: The scope of work shall include master planningand building design that are lo

40、cated within the boundary line . For building design it shallcomprise of the architectural, structural & M/E work . (including 3,000 m2of Air-raid shelterdesign, but excluding other specialists design, such as the Luxurious Interior Design, Landscaping Design and Flood Lighting Design). The tota

41、l floor area during theworking drawing stage is 70,000 m2 (excluding the SOHO Area, which is starting from thefifth floor level to the seventh floor level ).第三條 甲方向乙方提交的有關(guān)資料及文件(見(jiàn)下表)Article 3. Relevant documents which shall be issued by Party A to Party B: 序號(hào)S/N資料及文件名稱Name of documents份數(shù)copies提交時(shí)間Sub

42、mission Date備注Remarks政府批文Government Approval DocumentsFull set設(shè)計(jì)任務(wù)書Design Instructions規(guī)劃紅線圖 Plan of Property Line 1水、電、氣源落實(shí)情況說(shuō)明Design Information of Utilities (water,electricity, & gas supply etc.)規(guī)劃設(shè)計(jì)要求Requirements from the Government地質(zhì)勘探報(bào)告Soil Investigation Report原打入樁的資料Dsign Information of As

43、 Built pilings概念方案Concept Design Information 第四條 乙方向甲方交付的設(shè)計(jì)文件(見(jiàn)下表) Article 4. Design documents which shall be submitted by Party B to Party A (listed as follows):序號(hào)S/N設(shè)計(jì)文件名稱Design Documents階段Phase份數(shù)Copies提交時(shí)間Submission DateRemarks方案設(shè)計(jì)文件Schematic Design Documents 方案Schematic10 30天內(nèi)Within 30 days初步設(shè)計(jì)文

44、件 Documents擴(kuò)初15 30天內(nèi)Within 30 days初步概算文件Preliminary Estimate 擴(kuò)初2 7 天內(nèi)Within 7 days 施工圖設(shè)計(jì) Working Drawings 施工圖ConstructionDocuments15 樁位圖擴(kuò)初批準(zhǔn)后15 天 The piling drawings will be submitted within 15 days after the Approval篇三:建設(shè)工程設(shè)計(jì)合同英文版 建設(shè)工程設(shè)計(jì)合同(一) (民用建設(shè)工程設(shè)計(jì)合同) 工 程 名 稱:工 程 地 點(diǎn): 合 同 編 號(hào):(由設(shè)計(jì)人編填) 設(shè)計(jì)證書等級(jí):發(fā)包人:設(shè)計(jì)人:簽 訂 日 期:中華人民共和國(guó)建設(shè)部國(guó)家工商行政管理局鑒制發(fā)包人: 設(shè)計(jì)人:發(fā)包人委托設(shè)計(jì)人承擔(dān) 工程設(shè)計(jì),經(jīng)雙方協(xié)商一致,簽訂本合同。第一條 本合同依據(jù)下列文件簽訂:中華人民共和國(guó)合同法中華人民共和國(guó)建筑法建筑工程勘察設(shè)計(jì)市場(chǎng)管理規(guī)定。國(guó)家及地方有關(guān)建設(shè)工程勘察設(shè)計(jì)管理法規(guī)和規(guī)章。建設(shè)工程批準(zhǔn)文件。說(shuō)明:以上各階設(shè)計(jì)文件成果內(nèi)容詳細(xì)如下: 一、概念性方案設(shè)計(jì)文件:以平面功能布局草案、參考性圖例與照片、局部手繪草圖以及概念性構(gòu)思設(shè)

溫馨提示

  • 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
  • 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
  • 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。

評(píng)論

0/150

提交評(píng)論