1、設(shè)備開(kāi)箱檢查記錄record of equipments box-open inspection 通01 編號(hào)no: 單位工程名稱name of unit project分部工程名稱name of divisional project分項(xiàng)工程名稱name of sub-divisional project設(shè)備名稱name of equipment型號(hào)規(guī)格type and spec.設(shè)備位號(hào)position no.檢查內(nèi)容inspection contents破損、缺件、銹蝕等缺陷情況說(shuō)defects description of breakage, lack and corrosion etc
2、.箱號(hào)box no.包裝packing另、部件名稱規(guī)格parts and components name and spec.處理意見(jiàn)或示意圖說(shuō)明:treatment comments or illustration:處理結(jié)果:treatment result:確認(rèn)人: 年 月 日person to confirm: year/month/day監(jiān)理(建設(shè))單位:supervising company (the owner):(公章)(seal)監(jiān)理工程師:supervising engineer(建設(shè)單位代表):(representative of the owner)年 月 日year/mo
3、nth/day移交單位:company to hand over:經(jīng)辦人:person in charge:年 月 日year/month/day接受單位:company to accept:班組長(zhǎng):monitor of work team: (公章)施工員: (seal)technician:質(zhì)檢員:quality inspector:年 月 日year/month/day基礎(chǔ)驗(yàn)收記錄record of foundation acceptance通02 編號(hào)no: 單位工程名稱name of unit project分部工程名稱name of divisional project分項(xiàng)工程名稱
4、name of sub-divisional project施工圖號(hào)construction drawing no.基礎(chǔ)名稱name of foundation驗(yàn)收日期acceptance date復(fù)測(cè)項(xiàng)目item of re-measuring測(cè)點(diǎn)號(hào)measuring point no.設(shè)計(jì)坐標(biāo)(mm)design coordinate允許偏差(mm)permitted error實(shí)測(cè)坐標(biāo)(mm)measured coordinate復(fù)測(cè)項(xiàng)目item of re-measuring測(cè)點(diǎn)號(hào)measuring point no.設(shè)計(jì)坐標(biāo)(mm)design coordinate允許偏差(mm)p
5、ermitted error實(shí)測(cè)坐標(biāo)(mm)measured coordinatexyxyxy坐標(biāo)coordinates標(biāo)高level測(cè)點(diǎn)編號(hào)圖示:illustrate of measuring point no.:尺寸偏差或缺陷說(shuō)明:dimension errors or defects description:其他:others:驗(yàn)收意見(jiàn):acceptance comments:監(jiān)理(建設(shè))單位:supervising company (the owner):(公章)(seal)監(jiān)理工程師:supervising engineer(建設(shè)單位代表):(representative of th
6、e owner)年 月 日year/month/day移交單位:company to hand over:負(fù)責(zé)人:person in charge:年 月 日year/month/day接受單位:company to accept: (公章)(seal)施工員: technician:質(zhì)檢員:quality inspector:年 月 日year/month/day隱蔽工程(系統(tǒng)封閉)檢查記錄record of concealed works (system closing) inspection通03 編號(hào)no: 單位工程名稱name of unit project施工日期construct
7、ion duration分部工程名稱name of divisional project分項(xiàng)工程名稱name of sub-divisional project施工圖號(hào)construction drawing no.隱蔽部位concealing location序號(hào)no.隱蔽部分名稱name of concealing part單位unit數(shù)量number序號(hào)no.隱蔽部分名稱name of concealing part單位unit數(shù)量number隱蔽前的檢查:inspection before concealment:隱蔽方法:concealing method:簡(jiǎn)圖說(shuō)明:illustra
8、tion:監(jiān)理(建設(shè))單位:supervising company (the owner):(公章) (seal) 監(jiān)理工程師:supervising engineer(建設(shè)單位代表):(representative of the owner)年 月 日year/month/day施工單位:construction company:班組長(zhǎng):monitor of work team: (公章)施工員: (seal)technician:質(zhì)檢員:quality inspector:年 月 日year/month/day閥門試驗(yàn)(清洗)記錄record of valves test (cleanin
9、g) 通05 編號(hào)no: 單位(子單位)工程名稱name of unit project分部(子分部)工程名稱name of divisional project分項(xiàng)工程名稱name of sub-divisional project執(zhí)行的規(guī)范編號(hào)及條款spec. no. performed and terms試驗(yàn)儀器型號(hào)、精度test instrument type & precision試驗(yàn)日期test date閥門名稱valve name制造廠名name of manufacturer規(guī)格型號(hào)spec. & type數(shù)量(只)number抽查率%spot-check ra
10、te (%)清洗結(jié)果cleaning result脫脂結(jié)果degreasing result試驗(yàn)介質(zhì)test medium試驗(yàn)壓力mpatest pressure試驗(yàn)時(shí)間stest time結(jié)論result強(qiáng)度intensity嚴(yán)密性tightness強(qiáng)度intensity嚴(yán)密性tightness班組長(zhǎng):施工員:質(zhì)檢員:年 月 日monitor of work team:technician:quality inspector: year/month/day設(shè)備/管道防腐、保溫或保冷、涂漆施工記錄record of anticorrosion, insulation, painting of
11、equipment/pipeline通06 編號(hào)no: 單位工程名稱name of unit project分部工程名稱name of divisional project分項(xiàng)工程名稱name of sub-divisional project施工日期construction duration項(xiàng)目items內(nèi)容contents位號(hào)或線號(hào)tag. no. line no.規(guī)格spec.數(shù)量(臺(tái)或米)number (set or m)施工(底層)材料material(premier coat)保護(hù)層(面層)材料protection material (surface coat)規(guī)范編號(hào)spec.
12、no.檢查結(jié)果inspection result名稱name厚度(mm)thick名稱name厚度(mm)thick防腐與襯里anticorrosion and lining保溫或保冷 insulation涂漆painting班組長(zhǎng):施工員:質(zhì)檢員:年 月 日monitor of work team:technician:quality inspector: year/month/day設(shè)備安裝檢查記錄record of equipment installation inspection通07 編號(hào)no: 單位工程名稱name of unit project分部(分項(xiàng))工程名稱name of
13、divisional (sub-divisional) project施工圖號(hào)construction drawing no.位號(hào)tag. no.執(zhí)行規(guī)范標(biāo)準(zhǔn)spec. & standard設(shè)備名稱equipment name型號(hào)type施工日期cons. duration檢查項(xiàng)目inspection items允許偏差(mm)permitted error實(shí)際偏差(mm) actual error檢查項(xiàng)目inspection items允許偏差(mm)permitted error實(shí)際偏差(mm) actual error標(biāo)高level鉛垂度verticality中心線central
14、 line縱向longitudinal水平度levelness縱向longitudinal橫向transverse橫向transverse聯(lián)軸器聯(lián)接 coupling link徑向位移(mm)radial displacement軸向傾斜度(mm)axial gradient端面間隙(mm)clearance between end faces規(guī)定值specified value實(shí)際值actual value規(guī)定值specified value實(shí)際值actual value規(guī)定值specified value實(shí)際值actual value其他聯(lián)接other link ways偏移值(mm)de
15、viation value平行度(mm)axial gradient其他偏差(mm)other deviation規(guī)定值specified value實(shí)際值actual value規(guī)定值specified value實(shí)際值actual value規(guī)定值specified value實(shí)際值actual value減振器壓縮量space vibration damper compressed壓縮高度誤差(mm)compressed height error規(guī)定值specified value實(shí)際值actual value設(shè)備鋼支架制作manufacture of equipment steel s
16、upport結(jié)構(gòu)形式structure type 焊接welding附圖及說(shuō)明:illustration and explanation:班組長(zhǎng):施工員:質(zhì)檢員:年 月 日monitor of work team:technician:quality inspector: year/month/day單機(jī)試運(yùn)轉(zhuǎn)記錄record of single machine test run通09 編號(hào)no: 單位工程名稱name of unit project分部(分項(xiàng))工程名稱name of divisional (sub-divisional) project施工圖號(hào)construction dra
17、wing no.位號(hào)tag. no.執(zhí)行規(guī)范標(biāo)準(zhǔn)spec. & standard設(shè)備名稱equipment name型號(hào)規(guī)格specification設(shè)備轉(zhuǎn)速(r/min) rotate speed電機(jī)規(guī)格motor spec.額定電流(a) rated current額定功率(kw) rated power電機(jī)空運(yùn)轉(zhuǎn)情況:non-loading running of the motor:傳動(dòng)方式drive mode機(jī)械系統(tǒng)拆洗情況:cleaning of mechanical system:冷卻系統(tǒng)檢查情況:examination of cooling system:試運(yùn)轉(zhuǎn)的類別ty
18、pe of test連續(xù)運(yùn)轉(zhuǎn)時(shí)間(h) continuous running time環(huán)境溫度() surrounding temperature運(yùn)行時(shí)間(h)running time負(fù)荷情況load溫度()temperature壓力(mpa)pressure電壓汽壓 voltage pressure運(yùn)行電流(a)current振幅swing噪聲noise其它others軸承bearings電機(jī)motor油溫oil汽溫steam介質(zhì)溫度medium油壓oil介質(zhì)壓力medium前front后rear前front后rear進(jìn)in出out結(jié)論:conclusion:監(jiān)理(建設(shè))單位:supervi
19、sing company (the owner):(公章) (seal) 監(jiān)理工程師:supervising engineer(建設(shè)單位代表):(representative of the owner)年 月 日year/month/day施工單位:construction company:班組長(zhǎng):monitor of work team: (公章)施工員: (seal)technician:質(zhì)檢員:quality inspector:年 月 日year/month/day管道(設(shè)備)強(qiáng)度試驗(yàn)記錄record of pipeline (equipment) hydraulic pressure
20、 test水01 編號(hào)no: 單位(子單位)工程名稱name of unit project子分部工程名稱name of divisional project分項(xiàng)工程名稱name of sub-divisional project施工圖號(hào)construction drawing no.執(zhí)行的規(guī)范編號(hào)及條款spec. no. performed and terms工作壓力(mpa)working pressure管道材質(zhì)pipeline material試驗(yàn)介質(zhì)(test medium)試驗(yàn)儀器型號(hào)、精度type & accuracy of test instrument施工日期cons
21、. duration試驗(yàn)日期test date部位equip. location壓力pressure規(guī)定值(mpa)specified value穩(wěn)壓時(shí)間(min)constant pressure time壓力降(mpa)pressure drop試驗(yàn)情況text result試驗(yàn)壓力test pressure工作壓力work pressure試驗(yàn)壓力test pressure工作壓力work pressure試驗(yàn)壓力test pressure工作壓力work pressure說(shuō)明:explanation:試驗(yàn)結(jié)果:test result:監(jiān)理(建設(shè))單位:supervising compa
22、ny (the owner):(公章) (seal) 監(jiān)理工程師:supervising engineer(建設(shè)單位代表):(representative of the owner)年 月 日year/month/day施工單位:construction company:班組長(zhǎng):monitor of work team: (公章)施工員: (seal)technician:質(zhì)檢員:quality inspector:年 月 日year/month/day管道系統(tǒng)沖洗記錄record of pipeline system washing水02 編號(hào)no: 單位(子單位)工程名稱name of u
23、nit project子分部工程名稱name of divisional project分項(xiàng)工程名稱name of sub-divisional project管道材質(zhì)pipe material沖洗介質(zhì)washing medium施工日期cons. duration試驗(yàn)日期test date執(zhí)行的規(guī)范編號(hào)及條款spec. no. performed and terms試驗(yàn)儀器型號(hào)、精度type & accuracy of test instrument管段號(hào)pipeline section no.沖洗washing管段號(hào)pipeline section no.沖洗washing壓力(m
24、pa)pressure次數(shù)times壓力(mpa)pressure次數(shù)times說(shuō)明:explanation:試驗(yàn)結(jié)果:test result:監(jiān)理(建設(shè))單位:supervising company (the owner):(公章) (seal) 監(jiān)理工程師:supervising engineer(建設(shè)單位代表):(representative of the owner)年 月 日year/month/day施工單位:construction company:班組長(zhǎng):monitor of work team: (公章)施工員: (seal)technician:質(zhì)檢員:quality in
25、spector:年 月 日year/month/day輔助設(shè)備水(氣)壓試驗(yàn)記錄record of water (air) pressure test of auxiliary equipment水03 編號(hào)no: 單位(子單位)工程名稱name of unit project子分部工程名稱name of divisional project分項(xiàng)工程名稱name of sub-divisional project施工圖號(hào)construction drawing no.施工日期cons. duration試驗(yàn)日期test date執(zhí)行的規(guī)范編號(hào)及條款spec. no. performed and
26、 terms試驗(yàn)儀器型號(hào)、精度type & accuracy of test instrument設(shè)備名稱equipment name工作壓力(mpa)working pressure試驗(yàn)壓力(mpa)test pressure設(shè)備名稱equipment name工作壓力(mpa)working pressure試驗(yàn)壓力(mpa)test pressure說(shuō)明:explanation:試驗(yàn)結(jié)果:test result:監(jiān)理(建設(shè))單位:supervising company (the owner):(公章) (seal) 監(jiān)理工程師:supervising engineer(建設(shè)單位代
27、表):(representative of the owner)年 月 日year/month/day施工單位:construction company:班組長(zhǎng):monitor of work team: (公章)施工員: (seal)technician:質(zhì)檢員:quality inspector:年 月 日year/month/day排水管道灌水(通水)試驗(yàn)記錄record of drainage pipeline water filling test 水04 編號(hào)no: 單位(子單位)工程名稱name of unit project子分部工程名稱name of divisional pr
28、oject分項(xiàng)工程名稱name of sub-divisional project施工圖號(hào)construction drawing no.管道材質(zhì)pipeline material施工日期cons. duration執(zhí)行的規(guī)范編號(hào)及條款spec. no. performed and terms試驗(yàn)日期test time部位position管徑(mm)pipe diameter持續(xù)時(shí)間(min)duration time試驗(yàn)情況test result試驗(yàn)結(jié)果:test result:監(jiān)理(建設(shè))單位:supervising company (the owner):(公章) (seal) 監(jiān)理工程
29、師:supervising engineer(建設(shè)單位代表):(representative of the owner)年 月 日year/month/day施工單位:construction company:班組長(zhǎng):monitor of work team: (公章)施工員: (seal)technician:質(zhì)檢員:quality inspector:年 月 日year/month/day排水管道通球試驗(yàn)記錄record of drainage pipeline ball-pass test 水05 編號(hào)no: 單位(子單位)工程名稱name of unit project子分部工程名稱n
30、ame of divisional project分項(xiàng)工程名稱name of sub-divisional project施工圖號(hào)construction drawing no.管道材質(zhì)pipeline material施工日期cons. duration執(zhí)行的規(guī)范編號(hào)及條款spec. no. performed and terms試驗(yàn)日期test time部位position管徑(mm)pipe diameter球徑ball diameter通球試驗(yàn)情況ball-pass test result通球試驗(yàn)數(shù) 管數(shù) 順利通球數(shù) 管數(shù) 通球率 %number of test number of p
31、ipes number of balls passed number of pipes pass rate試驗(yàn)結(jié)果:test result:監(jiān)理(建設(shè))單位:supervising company (the owner):(公章) (seal) 監(jiān)理工程師:supervising engineer(建設(shè)單位代表):(representative of the owner)年 月 日year/month/day施工單位:construction company:班組長(zhǎng):monitor of work team: (公章)施工員: (seal)technician:質(zhì)檢員:quality insp
32、ector:年 月 日year/month/day衛(wèi)生器具滿水和通水試驗(yàn)記錄record of sanitary wares water filling and overflow test 水06 編號(hào)no: 單位(子單位)工程名稱name of unit project子分部工程名稱name of divisional project分項(xiàng)工程名稱name of sub-divisional project衛(wèi)生器具的名稱name of sanitary ware管道材質(zhì)pipeline material施工日期cons. duration執(zhí)行的規(guī)范編號(hào)及條款spec. no. performe
33、d and terms試驗(yàn)日期test time部位position數(shù)量number滿水和通水試驗(yàn)情況water filling and overflow test說(shuō)明:explanation:試驗(yàn)結(jié)果:test result:監(jiān)理(建設(shè))單位:supervising company (the owner):(公章) (seal) 監(jiān)理工程師:supervising engineer(建設(shè)單位代表):(representative of the owner)年 月 日year/month/day施工單位:construction company:班組長(zhǎng):monitor of work team
34、: (公章)施工員: (seal)technician:質(zhì)檢員:quality inspector:年 月 日year/month/day室內(nèi)消火栓試射試驗(yàn)記錄record of indoor fire hydrant trying test 水07 編號(hào)no: 單位(子單位)工程名稱name of unit project子分部工程名稱name of divisional project分項(xiàng)工程名稱name of sub-divisional project施工日期cons. duration執(zhí)行的規(guī)范編號(hào)及條款spec. no. performed and terms試驗(yàn)日期test ti
35、me注射試驗(yàn)過(guò)程:test process:試驗(yàn)結(jié)果:test result:監(jiān)理(建設(shè))單位:supervising company (the owner):(公章) (seal) 監(jiān)理工程師:supervising engineer(建設(shè)單位代表):(representative of the owner)年 月 日year/month/day施工單位:construction company:班組長(zhǎng):monitor of work team: (公章)施工員: (seal)technician:質(zhì)檢員:quality inspector:年 月 日year/month/day變壓器、箱式
36、變電所安裝記錄record of transformer, box substation installation 電01 編號(hào)no: 單位工程名稱name of unit project施工日期cons. duration分部工程名稱name of divisional project施工圖號(hào)construction drawing no.分項(xiàng)工程名稱name of sub-divisional project執(zhí)行的規(guī)范編號(hào)spec. & standard performed型號(hào)type額定容量(kva)rated capacity額定電壓(v)rated voltage額定電流(a
37、)rated current制造單位manufacturer出廠日期manufacture date編號(hào)no.外觀檢查appearance inspection出廠合格證manufacturer certificate文件documents絕緣套管insulation bushing油箱密封oil tank sealing油位指示oil level indicator隨機(jī)附件accessories部件安裝installation of parts溫度計(jì)temp. indicator氣體繼電器gas-relay散熱器radiator吸濕器moisture absorber油枕oil pillow
38、呼吸器respirator防爆管press絕緣套管insulation bushing本體安裝installation of transformer body中心尺寸central dimension坡度gradient基礎(chǔ)檢查foundation inspection接地grounding中性點(diǎn)neutral有載調(diào)壓開(kāi)關(guān)on load tap changer固定fixing注油oil filling備注:remarks:班組長(zhǎng): 施工員: 質(zhì)檢員: 年 月 日monitor of work team: technician: quality inspector: year/month/day
39、成套配電柜、控制柜及動(dòng)力、照明配電箱安裝記錄record of distribution cabinet、control power cabinet、power & lighting distribution box inst. 電02 編號(hào)no: 單位工程名稱name of unit project施工日期cons. duration分部工程名稱name of divisional project分項(xiàng)工程名稱name of sub-divisional project施工圖號(hào)construction drawing no.制造單位manufacturer型號(hào)type編號(hào)no.數(shù)量nu
40、mber外觀檢查appearance inspection基礎(chǔ)型鋼安裝foundation shaped steel installation項(xiàng)目items不直度straightness水平度levelness不平行度parallelismmm/mmm/全長(zhǎng)mm/full lengthmm/mmm/全長(zhǎng)mm/full lengthmm/全長(zhǎng)mm/full length允差permitted error15155實(shí)測(cè)measured value箱柜安裝box and cabinet installation項(xiàng)目items垂直度verticality成列盤面偏差faces error of row
41、 boards盤間接縫joint seam between boardsmm/mmmmm允差permitted error<1.5<5<2實(shí)測(cè)measured value固定方式fixing mode允差handcart inspection接地情況grounding簡(jiǎn)圖:sketch:班組長(zhǎng): 施工員: 質(zhì)檢員: 年 月 日monitor of work team: technician: quality inspector: year/month/day硬母線滑線安裝記錄record of bus-bar and trolley bus installation 電03 編號(hào)no:?jiǎn)挝还こ堂Qname of unit project施工日期cons. duration分部工程名稱name of divisional project施工圖號(hào)construction drawing no.分項(xiàng)工程名稱name of sub-divisional project執(zhí)行規(guī)范編號(hào)spec. no. performed絕緣子規(guī)格insulator spec.數(shù)量(只)number(piece)名稱name項(xiàng)目item內(nèi)容contents母線規(guī)格bus spec.規(guī)定值specified valu
溫馨提示
- 1. 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫(kù)網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 合資設(shè)備合同范本
- 業(yè)主瓷磚購(gòu)買合同范本
- 公司廠房翻新施工合同范本
- 咨詢策劃服務(wù)合同范例
- 中標(biāo)平移合同范本
- 合作測(cè)試合同范本
- 課題申報(bào)書代寫正規(guī)機(jī)構(gòu)
- 內(nèi)衣委托加工合同范本
- 信息項(xiàng)目合同范本
- 體育產(chǎn)業(yè)發(fā)展趨勢(shì)及市場(chǎng)潛力研究
- 公安人口管理
- 高中英語(yǔ)-怎樣寫英語(yǔ)倡議書
- GB/T 3477-2023船用風(fēng)雨密單扇鋼質(zhì)門
- YMO青少年數(shù)學(xué)思維28屆三年級(jí)全國(guó)總決賽試卷
- TT、IT、TNC、TNS、TNCS低壓接地系統(tǒng)全面解析
- 三位數(shù)除以一位數(shù)(商為三位數(shù))練習(xí)題含答案
- 特殊教育概論第二版PPT完整全套教學(xué)課件
- 粉體密度及流動(dòng)性測(cè)定
- 北師大版八年級(jí)下冊(cè)課程綱要分享課件
- 鍋爐工崗位安全風(fēng)險(xiǎn)告知卡
- 小學(xué)勞動(dòng)教育課堂教學(xué)水平評(píng)價(jià)量表
評(píng)論
0/150
提交評(píng)論