




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請(qǐng)進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、recovery and treatment in a timely manner. at the time of construction, should be taken to prevent dust and mud spill leak, measures such as the sewage outflow, vehicles stained with dirt, construction waste someone to clean up, to avoid polluting the environment 3.2 night arrangements of noise emit
2、ted by construction equipment, mixer noise emitted by machinery and equipment next to foam for noise control to prevent noise pollution of the surrounding environment. 3.3 construction managers and construction personnel, special operations personnel listing jobs, site operators, leaders, managers,
3、operators, wearing a helmet is divided into red, blue and yellow species. 3.4 site construction and company's comprehensive evaluation, check scores published examination results issued on a regular basis. 4, construction site environmental protection measures in order to protect and improve the
4、 living environment and the ecological environment, prevent construction and operation of pollution and nuisance, safeguard the health of residents and workers near the construction area, promoting the development of socialist construction, environmental protection must be the construction site. 4.1
5、 daily by the deputy project manager, construction, safety officer for the afternoon the second comprehensive self test, where a violation of the provisions of the environment protection in construction site must be promptly identified and corrective action, made by construction workers on the day o
6、f the construction of the log on post records. 4.2 monthly by the department of projects to be checked, according to the environmental protection in construction site inspection, evaluation criteria for inspection score, fill in the score sheet as the basis for site evaluation of safe production and
7、 civilized. during the inspection, do not meet the environmental requirements of the "three" (people, time, and measures) modification, implementation and review review the duties specified. 4.3 4.3.1 pollution prevention measures in construction site clean up rubbish, used motor vehicle s
8、hipments, no free air dispersion caused by dust. construction of refuse to be cleaned up to a designated location, no feel free to pile up, cleaned up and when adequate water to reduce dust. 4.3.2 earthmoving construction site entrances and set the car wash, and arrange for someone to clean up tire,
9、 not wheel dirt into other roads, affecting the city clean. 4.3.3 construction road construction site before construction ready plans and setting, make full use of red line layout, arrangement of temporary construction road, grass-roots energising, pavement paving the way coke button, fine aggregate
10、, and water at all times, reduce road dust. 4.3.4 construction when the protection of urban public facilities have been built, reasonable arrangements within the lot of construction organization, construction on the normal life of the residents and to minimize the impact of leisure. 4.3.5 easy cloud
11、 of fine materialwe will continue to improve the company's internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independen
12、t oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. deepening the information management to ensure full commu
13、nication "zero resistance". to constantly perfect erp, and bfs+, and pi, and mis, and scm, information system based construction, full integration information system, achieved information resources shared; to expand portal system application of breadth and depth, play information system on
14、 enterprise of assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening bfs+, and erp, and scm, technology application of training, improve employees application information system of capacity and level. humanistic
15、care to ensure "zero." to strengthening humanities care, continues to foster company wind clear, and gas are, and heart shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labou
16、r protection, organization career health medical, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of humanities environment. to strengthen
17、 risk management, ensure that the business of "zero risk". to strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national p
18、olicy trends, strengthening track, active should; to implementation state-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management,
19、 improve risk prevention capacity. to further standardize trading, and strive to achieve "according to law, standardize and fair." innovation of performance management, to ensure that potential employees "zero fly". to strengthen performance management, process control, enhance e
20、mployee evaluation and levels of effective communication to improve performance management. to further quantify and refine employee standards . work, full play party, and branch, and members in "five type enterprise" construction in the of core role, and fighting fortress role and pioneer
21、model role; to continues to strengthening "four good" leadership construction, full play levels cadres in enterprise development in the目錄1 編制依據(jù)22 工程概況22.1 設(shè)計(jì)概況22.2 現(xiàn)場(chǎng)情況53 施工安排53.1 冬期施工期的規(guī)定53.2 冬期施工目標(biāo)和原則53.3 冬期施工部位及工期63.4 冬期施工勞動(dòng)力組織和職責(zé)分工73.6 冬期施工主要項(xiàng)目工程量94 施工準(zhǔn)備與資源配置計(jì)劃94.1 技術(shù)準(zhǔn)備94.2 現(xiàn)場(chǎng)準(zhǔn)備104.3 物
22、資準(zhǔn)備105 施工方法及工藝要求115.1 測(cè)量工程115.2 鋼筋工程115.3 模板工程125.4 混凝土工程135.5 地下外墻防水工程195.6 地下肥槽土方回填土工程205.7 安裝工程預(yù)留預(yù)埋216 質(zhì)量保證措施216.1 冬施教育和培訓(xùn)216.2 質(zhì)量管理措施217 安全消防措施227.1 安全、消防教育227.2 制定具體措施23冬期施工方案1 編制依據(jù)編制依據(jù)見表1-1。表1-1序號(hào)名稱編號(hào)1建筑施工圖建施-2結(jié)構(gòu)施工圖結(jié)施-2地基與基礎(chǔ)工程施工質(zhì)量驗(yàn)收規(guī)范gb5020220023混凝土結(jié)構(gòu)工程質(zhì)量驗(yàn)收規(guī)范gb5020420024建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)gb5030020
23、015建筑工程冬期施工規(guī)程jgj104-20116建筑機(jī)械使用安全技術(shù)規(guī)程jgj3320017建筑施工手冊(cè)(第四版)8施工組織設(shè)計(jì)2 工程概況2.1 設(shè)計(jì)概況設(shè)計(jì)概況見表2-1。表2-1序號(hào)項(xiàng) 目內(nèi) 容1工程名稱盛和.日月華庭1號(hào)樓、2號(hào)樓、3號(hào)樓、4號(hào)樓、地下車庫及服務(wù)用房2地理位置河北省張家口市沈家屯村東南部,清水河西路以西、張家口市第一中學(xué)新校區(qū)南側(cè),朝陽西大街南側(cè)、西苑南路東側(cè)3建筑功能本工程為一類高層住宅和住宅地下車庫及配套服務(wù)用房。4建筑面積90307.67m2(其中地下19491.79m2,地上70815.88m2)1號(hào)樓:19998.07m2(其中地下2423.45m2,地上1
24、7574.62m2)2號(hào)樓:19915.74m2(其中地下2421.49m2,地上17494.25m2)3號(hào)樓:19616.31m2(其中地下2336.88m2,地上17279.43m2)4號(hào)樓:20320.79m2(其中地下2437.62m2,地上17883.17m2)地下車庫及服務(wù)用房:10456.76m2(其中地下9872.35m2,地上584.41m2)5建筑物占地面積5352.87m21號(hào)樓:1193.57m22號(hào)樓:1202.05m23號(hào)樓:1175.10m24號(hào)樓:1191.56m2地下車庫及服務(wù)用房:584.41m26建筑平面1號(hào)樓、2號(hào)樓地下二層、地下一層、首層、二層:橫軸編
25、號(hào)144,縱軸編號(hào)aq,橫軸距離76.770m,縱軸距離18.900m三層以上:橫軸編號(hào)144,縱軸編號(hào)ap,橫軸距離76.770m,縱軸距離16.800m3號(hào)樓 橫軸編號(hào)155,縱軸編號(hào)an,橫軸距離74.070m,縱軸距離16.800m4號(hào)樓橫軸編號(hào)156,縱軸編號(hào)am,橫軸距離76.170m,縱軸距離16.800m地下車庫及服務(wù)用房地下一層:橫軸編號(hào)126,縱軸編號(hào)al,橫軸距離198.300m,縱軸距離56.400m地上一層:橫軸編號(hào)f-8f-1,縱軸編號(hào)f-ef-b,橫軸距離41.750m,縱軸距離10.800m7建筑物層數(shù)1號(hào)樓、2號(hào)樓、3號(hào)樓、4號(hào)樓:地下二層、地上十九層地下車庫
26、及服務(wù)用房:地下一層為車庫,地上一層為服務(wù)用房8建筑層高1號(hào)樓、2號(hào)樓:地下二層(庫房、戊類庫房)3.00m,地下一層(自行車庫、接室、配電室、弱電機(jī)房、設(shè)備用房、合用前室)3.5m、3.95m,一層門廳和合用前室3m、商鋪3.3m,二層前室2.8m、商鋪2.95m、三層以上住宅2.80m。3號(hào)樓、4號(hào)樓:地下二層(庫房、戊類庫房)3.00m,地下一層(自行車庫、接室、配電室、弱電機(jī)房、設(shè)備用房、合用前室)3.5m、3.95m,一層門廳和合用前室3m、商鋪3.3m,二層以上住宅2.80m。地下車庫及服務(wù)用房:地下一層3.80m、4.90m、6.00m,一層3.80m 9建筑物標(biāo)高、高度1號(hào)樓:
27、±0.00=709.50m,檐高54.55m 2號(hào)樓:±0.00=709.85m,檐高54.55m3號(hào)樓:±0.00=708.30m,檐高54.55m4號(hào)樓:±0.00=708.50m,檐高54.55m地下車庫及服務(wù)用房:±0.00=708.60m,檐高3.80m10結(jié)構(gòu)選型地基基礎(chǔ):1號(hào)樓、2號(hào)樓、3號(hào)樓、4號(hào)樓為現(xiàn)澆鋼筋混凝土筏形基礎(chǔ),地下車庫及服務(wù)用房為柱下獨(dú)立基礎(chǔ)+筏板基礎(chǔ)抗側(cè)力體系:1號(hào)樓、2號(hào)樓、3號(hào)樓、4號(hào)樓為現(xiàn)澆鋼筋混凝土剪力墻結(jié)構(gòu),地下車庫及服務(wù)用房為現(xiàn)澆鋼筋混凝土框架結(jié)構(gòu)樓蓋結(jié)構(gòu):現(xiàn)澆鋼筋混凝土普通梁板11樓梯坡道結(jié)構(gòu)形式板
28、式鋼筋混凝土12后澆帶設(shè)置1號(hào)樓、2號(hào)樓、3號(hào)樓、4號(hào)樓:各一條,從基礎(chǔ)底板至首層樓板,寬800mm地下車庫及服務(wù)用房:四條,從基礎(chǔ)底板至頂板面,寬800mm13變形縫設(shè)置1號(hào)樓、2號(hào)樓、3號(hào)樓、4號(hào)樓:各一條,寬175 14鋼筋類別hpb235()級(jí)鋼hrb335()級(jí)鋼hrb400()級(jí)鋼15混凝土強(qiáng)度等級(jí)1號(hào)樓、2號(hào)樓、3號(hào)樓、4號(hào)樓基礎(chǔ)墊層:c15基礎(chǔ)底板:c30八層及以下墻、柱、梁、板:c30九層及以下墻、柱、梁、板:c25樓梯:c25圈梁、構(gòu)造柱、現(xiàn)澆過梁:c20標(biāo)準(zhǔn)構(gòu)件:按標(biāo)準(zhǔn)圖要求后澆帶:采用比相應(yīng)部位構(gòu)件混凝土強(qiáng)度等級(jí)高一級(jí)的膨脹混凝土地下車庫及服務(wù)用房基礎(chǔ)墊層:c15基礎(chǔ)底
29、板、防水板、地下室外墻:c35 框架柱:c40梁、板、樓梯:c35構(gòu)造柱、圈梁、過梁:c20后澆帶:采用比相應(yīng)部位構(gòu)件混凝土強(qiáng)度等級(jí)高一級(jí)的膨脹混凝土16地下防水1號(hào)、2號(hào)、3號(hào)、4號(hào)樓:防水等級(jí)為二級(jí)地下車庫及服務(wù)用房:種植頂板的防水等級(jí)為一級(jí);其余地下工程防水等級(jí)為二級(jí)外墻、底板防水材料及做法(外防):側(cè)墻、底板和室外部分的頂板,除結(jié)構(gòu)采用不小于250mm厚自防水混凝土(抗?jié)B等級(jí)p6)外,并在底板下側(cè),側(cè)墻和頂板外側(cè)加做1.5厚p型單面自粘防水卷材,具體做法參照“貼必定”自粘防水卷材(10bjz50),并應(yīng)符合地下工程防水技術(shù)規(guī)范(gb 50108-2008)2.2 現(xiàn)場(chǎng)情況2012年11
30、月1日之前,1號(hào)樓、2號(hào)樓、4號(hào)樓二層墻體以下混凝土結(jié)構(gòu)施工完,3號(hào)樓一層樓板以下混凝土結(jié)構(gòu)施工完,地下車庫混凝土結(jié)構(gòu)施工完,1號(hào)樓和4號(hào)樓地下外墻防水施工完。3 施工安排3.1 冬期施工期的規(guī)定根據(jù)建筑工程冬期施工規(guī)程(jgj104-2011),冬期施工期限劃分原則是:根據(jù)當(dāng)?shù)囟嗄隁庀筚Y料統(tǒng)計(jì),當(dāng)室外日平均氣溫連續(xù)5天穩(wěn)定低于5即進(jìn)入冬期施工;當(dāng)室外日平均氣溫連續(xù)5天高于5時(shí)解除冬期施工。根據(jù)氣象資料,張家口市通常是每年11月1日至翌年3月31日為冬期施工期。但10月25日至31日為初寒期,4月1日至10日為回暖期,在此期間,要密切注意天氣變化,及時(shí)掌握氣象預(yù)報(bào),以防氣溫突然下降,給工程造成
31、損失。施工現(xiàn)場(chǎng)在10月25日起開始對(duì)大氣進(jìn)行測(cè)溫工作。3.2 冬期施工目標(biāo)和原則3.2.1 確保工程質(zhì)量,做到安全生產(chǎn)。3.2.2 冬期施工的措施方案要因時(shí)因地因工程項(xiàng)目制宜,既要技術(shù)上可靠,同時(shí)要經(jīng)濟(jì)合理,盡量減少能源消耗和物資損耗,縮短工期,使所增加的費(fèi)用最少。3.2.3 冬期施工應(yīng)考慮所需的設(shè)備、熱能及材料要有充足、可靠的來源,暫設(shè)工程能夠滿足施工生產(chǎn)要求。3.2.4 所選擇的施工方法簡單可靠,施工速度快,達(dá)到保證質(zhì)量、安全生產(chǎn)、縮短工期、降低成本的目的。3.2.5 必須制定行之有效的冬期施工管理措施。3.2.6 本工程的冬期施工要以保證質(zhì)量、保安全為主,完成施工進(jìn)度為輔。3.3 冬期施
32、工部位及工期根據(jù)本工程施工組織設(shè)計(jì)中工期要求和現(xiàn)場(chǎng)實(shí)際施工進(jìn)度情況,結(jié)合張家口市氣候條件,在2012年內(nèi)混凝土結(jié)構(gòu)施工至11月30日、地下外墻防水施工至11月24日、地下肥槽回填土施工至12月15日,2013年從4月1日開始施工,在初冬期間要涉及到混凝土結(jié)構(gòu)工程、地下外墻防水、土方回填工程等施工,冬期期間施工部位及工期安排見表3-1。表3-1序號(hào)施工部位始止時(shí)間持續(xù)天數(shù)11號(hào)樓混凝土結(jié)構(gòu)1.1四層墻體及梁頂板2012.11.12012.11.15151.2五層墻體及梁頂板2012.11.162012.11.30151.3基礎(chǔ)底板至一層樓板溫度伸縮后澆帶2012.11.192012.11.257
33、22號(hào)樓混凝土結(jié)構(gòu)2.1四層墻體及梁頂板2012.11.12012.11.15152.2五層墻體及梁頂板2012.11.162012.11.30152.3基礎(chǔ)底板至一層樓板溫度伸縮后澆帶2012.11.192012.11.25734號(hào)樓混凝土結(jié)構(gòu)3.1四層墻體及梁頂板2012.11.12012.11.15153.2五層墻體及梁頂板2012.11.162012.11.30153.3基礎(chǔ)底板至一層樓板溫度伸縮后澆帶2012.11.192012.11.25743號(hào)樓混凝土結(jié)構(gòu)4.1一層墻體及梁頂板2012.11.12012.11.10104.2二層墻體及梁頂板2012.11.112012.11.20
34、104.3三層墻體及梁頂板2012.11.212012.11.30104.4基礎(chǔ)底板至一層樓板溫度伸縮后澆帶2012.11.242012.11.3075服務(wù)用房樓板混凝土結(jié)構(gòu)2012.11.12012.11.20206地下車庫與1-4號(hào)樓之間通廊混凝土結(jié)構(gòu)2012.11.12012.11.25257地下車庫溫度伸縮后澆帶2012.11.122011.11.211082號(hào)樓地下外墻防水卷材2012.11.62011.11.1279地下車庫外墻防水卷材2012.11.132011.11.2210103號(hào)樓地下外墻防水卷材2012.11.232011.11.29711地下車庫與1-4號(hào)樓之間通廊防水
35、卷材2012.11.302011.12.5612地下外墻肥槽回填土2012.11.152012.12.153113安裝工程預(yù)留預(yù)埋2012.11.12012.11.30303.4 冬期施工勞動(dòng)力組織和職責(zé)分工3.4.1 管理層負(fù)責(zé)人及職責(zé)分工成立以項(xiàng)目經(jīng)理為組長的冬期領(lǐng)導(dǎo)小組,負(fù)責(zé)人及職責(zé)分工見表3-2。表3-2序號(hào)職務(wù)姓名主要職責(zé)1項(xiàng)目經(jīng)理-組長趙學(xué)來全面負(fù)責(zé)工地冬期施工的領(lǐng)導(dǎo)工作2項(xiàng)目總工-副組長陳建新全面負(fù)責(zé)和指導(dǎo)冬施技術(shù)、質(zhì)量工作3生產(chǎn)經(jīng)理-副組長康錦平負(fù)責(zé)組織實(shí)施和協(xié)調(diào)工作4技術(shù)員-組員饒際鵬方案的實(shí)施檢查、技術(shù)協(xié)調(diào)5安全員-組員陽太平負(fù)責(zé)冬施期間的消防、安全監(jiān)督6質(zhì)量檢查員 -組員
36、王爭權(quán)負(fù)責(zé)冬施期間的質(zhì)量控制7土建施工員-組員唐永斌負(fù)責(zé)冬施中的工程進(jìn)度、質(zhì)量、保溫工作8水電施工員-組員閆倫軍負(fù)責(zé)冬施中的水電配合及水管的保溫9實(shí)驗(yàn)員-組員黃劍琦負(fù)責(zé)試驗(yàn)、計(jì)量及冬施的測(cè)溫管理和氣象預(yù)報(bào)工作10測(cè)量員-組員曹鋒負(fù)責(zé)冬施過程中測(cè)量工作11材料員-組員黃祖武負(fù)責(zé)冬施中工程物資供應(yīng)工作12資料員-組員宋丹負(fù)責(zé)冬施資料收集整理工作3.4.2 工人數(shù)量及分工根據(jù)施工進(jìn)度計(jì)劃及施工流水段劃分,進(jìn)行勞動(dòng)力安排見表3-3。表3-3序號(hào)工種名稱班組名稱人數(shù)任務(wù)1防水工防水班組8設(shè)組長1人,負(fù)責(zé)外墻防水卷材施工2回填土工土方回填組20設(shè)組長1人,負(fù)責(zé)肥槽土方回填施工3鋼筋工鋼筋成型班組24設(shè)組長
37、1名,負(fù)責(zé)鋼筋加工鋼筋安裝班組50設(shè)組長1名,負(fù)責(zé)墻、柱、梁板鋼筋連接綁扎4木工樓板支模班組46設(shè)組長1名,負(fù)責(zé)樓板、梁、陽臺(tái)和樓梯等水平構(gòu)件模板施工。 鋼大模班組46設(shè)組長1名,具體負(fù)責(zé)墻、柱等豎向構(gòu)件的模板施工。5混凝土工混凝土澆筑班組25設(shè)組長一名,負(fù)責(zé)混凝土的布料澆筑、振搗、搓平,泵管的移動(dòng)就位固定。6架子工腳手架20設(shè)組長一名,負(fù)責(zé)負(fù)責(zé)腳手架搭設(shè)及拆除及安全防護(hù)。7放線工防線班組6設(shè)組長一名,樓層水平線、墻體位置線8保溫工混凝土保溫班組6設(shè)班長一名,負(fù)責(zé)混凝土保溫9測(cè)溫工混凝土測(cè)溫班組6設(shè)組長1名,負(fù)責(zé)混凝土的測(cè)溫10安裝電工電工班組24設(shè)組長1名,負(fù)責(zé)電氣配管和洞口預(yù)留11水暖工水
38、暖工班組6設(shè)組長1名,負(fù)責(zé)給排水、暖通洞口預(yù)留和套管預(yù)埋12抹灰工4地下外墻面修補(bǔ)13電氣焊工6鋼筋和鋼管焊接14臨電電工2臨電維護(hù)15塔司6垂直運(yùn)輸16信號(hào)工8垂直運(yùn)輸合計(jì)3133.6 冬期施工主要項(xiàng)目工程量冬期施工主要項(xiàng)目工程量見表3-4。表3-4序號(hào)項(xiàng) 目單 位數(shù) 量備注1鋼筋工程地上墻體t330地上梁板t2262模板工程地上墻體m219200地上梁板m239003混凝土工程地上墻體、柱m31980地上梁板m313504防水工程地下外墻m295005土方回填工程肥槽m3400004 施工準(zhǔn)備與資源配置計(jì)劃4.1 技術(shù)準(zhǔn)備4.1.1 冬期施工技術(shù)培訓(xùn)冬期施工前,對(duì)全體人員進(jìn)行冬期施工培訓(xùn),
39、組織參與冬施的施工管理人員學(xué)習(xí)有關(guān)冬期施工規(guī)范、規(guī)定及冬期施工技術(shù);學(xué)習(xí)、理解公司冬期施工的總方案及本工程的冬施方案,具體掌握各分項(xiàng)工程冬期施工的方法、有關(guān)要求及具體措施。特別要對(duì)試驗(yàn)人員和測(cè)溫人員進(jìn)行冬施試驗(yàn)和測(cè)溫方法培訓(xùn),明確試驗(yàn)、測(cè)溫意義和測(cè)溫?cái)?shù)據(jù)的重要性,提高試驗(yàn)人員和測(cè)溫人員的責(zé)任心。對(duì)工人進(jìn)行冬施培訓(xùn),并進(jìn)行技術(shù)交底。4.1.2 編制冬施材料計(jì)劃和技術(shù)交底在冬期來臨之前,技術(shù)部根據(jù)施工進(jìn)度計(jì)劃、結(jié)合實(shí)際情況和工程特點(diǎn)編制冬施材料計(jì)劃和技術(shù)交底。 4.1.3 對(duì)預(yù)拌混凝土供應(yīng)商技術(shù)交底在冬施來臨之前,項(xiàng)目技術(shù)部根據(jù)預(yù)拌混凝土技術(shù)合同要求及現(xiàn)場(chǎng)施工部位、施工環(huán)境等因素對(duì)預(yù)拌混凝土供應(yīng)商
40、進(jìn)行冬期施工混凝土供應(yīng)技術(shù)交底。交底中應(yīng)明確混凝土的使用部位、數(shù)量、混凝土的強(qiáng)度等級(jí)、坍落度要求、原材料的要求、混凝土水灰比的要求、外加劑的要求、混凝土出罐溫度的要求、混凝土凝結(jié)時(shí)間要求等,并要求混凝土攪拌站提供混凝土冬期施工方案(主要有原材料的溫度的控制及拌制運(yùn)輸?shù)浆F(xiàn)場(chǎng)的熱工計(jì)算等有關(guān)資料)。4.2.4 對(duì)管理層和作業(yè)層技術(shù)交底技術(shù)部按冬施方案要求和有關(guān)規(guī)定,對(duì)總包有關(guān)職能人員進(jìn)行施工方案交底,對(duì)分包負(fù)責(zé)人及作業(yè)班組進(jìn)行書面和口頭形式的冬施各分項(xiàng)工程的技術(shù)交底和安全交底。4.2 現(xiàn)場(chǎng)準(zhǔn)備4.2.1 施工場(chǎng)地的準(zhǔn)備(1)排除施工現(xiàn)場(chǎng)積水、對(duì)施工現(xiàn)場(chǎng)進(jìn)行必要的修整,截?cái)嗔魅胧┕がF(xiàn)場(chǎng)的水源,做好排
41、水措施,消除現(xiàn)場(chǎng)施工用水造成場(chǎng)地結(jié)冰現(xiàn)象。(2)施工場(chǎng)地積雪清掃后,不應(yīng)放在機(jī)電設(shè)備、構(gòu)件堆放場(chǎng)地附近。(3)保證消防道路的暢通。 4.2.2 機(jī)械設(shè)備、附屬設(shè)施的準(zhǔn)備(1)機(jī)械設(shè)備要做好冬季施工所需油料的儲(chǔ)備和工程機(jī)械潤滑油的更換補(bǔ)充以及其它檢修保養(yǎng)工作,以便在冬施期間運(yùn)轉(zhuǎn)正常。(2)工地臨時(shí)供水管埋地1.4m保溫,露出地面臨水管采用管狀巖棉保溫、表面纏繞塑料布,外露的閥門要用磚砌井、內(nèi)填鋸沫保溫,水龍頭、閥門有損壞的一律更換完畢。(3)消防泵房采用電暖器供暖,并有專人值班。(4)辦公區(qū)采用空調(diào)供暖、生活區(qū)采用電暖器供暖,門口安裝棉門簾。(5)建立室外監(jiān)測(cè)點(diǎn),現(xiàn)場(chǎng)設(shè)置測(cè)溫百葉箱(規(guī)格300&
42、#215;300×400mm,箱底距地1.5m,外表面刷白色油漆),并于10月25日起測(cè)量記錄大氣溫度。4.3 物資準(zhǔn)備冬期施工所需物資必須于冬施前到位,主要物資準(zhǔn)備計(jì)劃見表4-1。表4-1序號(hào)材料名稱品種規(guī)格單位數(shù)量用途1砂漿防凍劑-15t1地下混凝土外墻表面修補(bǔ)2塑料薄膜寬1mm29600混凝土表面養(yǎng)護(hù)及保溫覆蓋3阻燃聚氨酯保溫板厚15×寬1m、長2mm24300鋼大模板外表面保溫4阻燃保溫被厚15m22400混凝土保溫覆蓋5彩條布寬6mm22000外墻門窗洞口及外架圍擋6管狀巖棉內(nèi)徑100mm、壁厚50mmm570外露消防管保溫內(nèi)徑40mm、壁厚50mmm240生活及
43、生產(chǎn)用水管保溫7棉門簾寬1m、長2m個(gè)65辦公室及宿舍門口8空調(diào)機(jī)1.5p臺(tái)12辦公室取暖9電暖器1200w臺(tái)53宿舍、消防泵房取暖10暖風(fēng)機(jī)1000w臺(tái)2作業(yè)面清除冰雪11空壓機(jī)1.5m3臺(tái)2作業(yè)面清除冰雪12木制百頁箱300×300×400mm個(gè)1大氣溫度及室內(nèi)測(cè)溫13干濕溫度計(jì)個(gè)2大氣溫度及環(huán)境測(cè)溫14電子測(cè)溫儀個(gè)1混凝土測(cè)溫15棒形溫度計(jì)-20、酒精支20混凝土測(cè)溫16測(cè)溫管10根50混凝土測(cè)溫17防寒服套350工人防寒18防滑棉鞋雙350工人防寒19布手套雙350工人防寒5 施工方法及工藝要求5.1 測(cè)量工程5.1.1 施工時(shí)測(cè)量儀器應(yīng)輕拿輕放。5.1.2 盡量避
44、免在風(fēng)雪天氣進(jìn)行戶外測(cè)量放線工作,如需要時(shí)對(duì)儀器采用打傘遮擋的保護(hù)措施。5.1.3 在測(cè)量彈線時(shí)往墨斗中加入酒精以防止墨汁上凍。5.2 鋼筋工程5.2.1 一般要求(1)雪天鋼筋要用塑料布遮蓋嚴(yán)密,以防鋼筋表面結(jié)冰霜。(2)鋼筋加工要按規(guī)范操作,在運(yùn)輸、加工過程中要輕拿輕放,以避免造成刻痕,撞擊凹陷。(3)鋼筋接頭及澆筑混凝土前將鋼筋上的冰雪凍塊及時(shí)清理干凈,不得用水沖洗。(4)對(duì)澆筑完混凝土面的預(yù)留鋼筋上的混凝土及時(shí)清理干凈。(5)鋼筋調(diào)直采用調(diào)直機(jī)。(6)直徑16的鋼筋連接采用直螺紋連接,直徑14的鋼筋連接采用搭接。直螺紋連接接頭加工后及時(shí)戴帽保護(hù)。(7)定位鋼筋、馬凳鋼筋采用電弧焊5.2
45、.2 鋼筋負(fù)溫焊接方法及技術(shù)要點(diǎn)(1)在負(fù)溫條件下焊接鋼筋,應(yīng)盡量安排在室內(nèi)進(jìn)行。如必須在室外焊接,其環(huán)境溫度不宜低于-20,風(fēng)力超過3級(jí)時(shí)要有擋風(fēng)措施。焊后未冷卻的接頭,嚴(yán)禁碰到冰雪。(2)焊條易潮,特別在負(fù)溫度時(shí),使用前必須按照質(zhì)量說明書的規(guī)定進(jìn)行烘焙。使用時(shí)取出放在保溫筒內(nèi),做到隨用隨取,外露2小時(shí)后必須要重新烘焙。所使用的焊條要貯存在通風(fēng)干燥的地方,保證焊條的良好性能。5.3 模板工程5.3.1 模板類型一層以上墻采用鋼大模板,柱、梁、板采用15厚腹膜木模板。5.3.2 模板的保溫措施 (1)柱木模板側(cè)外圍滿裹掛兩層阻燃保溫被。(2)墻鋼大模板背楞之間粘貼兩層15mm厚聚氨酯保溫板。(
46、3)模板表面應(yīng)清理干凈后涂擦脫模劑,混凝土澆筑前表面不得有冰雪。5.3.3 模板的拆除要求(1)混凝土受凍臨界強(qiáng)度:未加防凍劑的混凝土為設(shè)計(jì)強(qiáng)度30%,摻用防凍劑的混凝土不得小于4.0n/mm2。 (2)墻、柱、梁側(cè)模板和保溫層在混凝土達(dá)到受凍凍臨界強(qiáng)度值并冷卻到5后方可拆除,拆除時(shí)間根據(jù)同條件試塊確定,經(jīng)驗(yàn)數(shù)是,當(dāng)溫度為-5-8時(shí),拆除時(shí)間不少于48h;當(dāng)溫度為-8-12時(shí),拆除時(shí)間不少于72h。拆模時(shí)混凝土表面溫度與環(huán)境溫度差大于20時(shí),混凝土表面及時(shí)覆蓋,使其緩慢冷卻,防止由于溫差過大產(chǎn)生溫度裂縫。 (3) 梁底及板底模拆除時(shí),混凝土強(qiáng)度達(dá)到100%,以同條件混凝土試塊強(qiáng)度為準(zhǔn)。 (4)
47、模板拆除依據(jù)技術(shù)部門下發(fā)的拆模通知書執(zhí)行,無拆模通知書嚴(yán)禁進(jìn)行梁板拆模作業(yè)。5.4 混凝土工程5.4.1 混凝土冬期施工方法的選擇冬期施工混凝土采用綜合蓄熱法。 5.4.2 冬期施工對(duì)預(yù)拌混凝土原材料的要求(1)水泥優(yōu)先選用低堿普通硅酸鹽水泥。水泥強(qiáng)度等級(jí)不應(yīng)低于42.5級(jí),最小水泥用量不應(yīng)少于280kg/m3,水灰比不大于0.55。(2)骨料砂、石按常溫施工要求外,不得含有冰、雪等凍結(jié)物及易凍裂的礦物質(zhì),含混量不得超過規(guī)定值。砂、石投料前應(yīng)加熱。(3)外加劑混凝土外加劑使用前必須進(jìn)行復(fù)試?;炷练纼鰟?yīng)選用無氯低堿類防凍劑,防凍劑類型按初冬(適用于最低環(huán)境溫度-15)選擇無氯高效早強(qiáng)復(fù)合防凍
48、劑。防凍劑應(yīng)具有早強(qiáng)、減水、引氣作用,并必須符合混凝土外加劑應(yīng)用技術(shù)規(guī)范(gb50119-2003)的規(guī)定。(4)摻合料選用級(jí)粉煤灰,摻量不大于15%。(5)水普通飲用水。5.4.3 冬期施工對(duì)預(yù)拌混凝土攪拌要求(1)入冬前,混凝土攪拌站應(yīng)對(duì)原材料堆場(chǎng)和庫房采取封閉、覆蓋等保溫措施?;炷翑嚢枵镜陌韬显O(shè)備應(yīng)進(jìn)行防寒、保溫處理,拌合水及骨料必須加熱,加熱溫度不得超過表5-1的規(guī)定。表5-1項(xiàng) 次項(xiàng) 目拌合水骨 料1強(qiáng)度等級(jí)小于42.5級(jí)普通硅酸鹽水泥、礦渣硅酸鹽水泥80602強(qiáng)度等級(jí)等于或大于42.5級(jí)普通硅酸鹽水泥、硅酸鹽水泥6040(2)冬施攪拌混凝土的投料順序應(yīng)與材料加熱條件相適應(yīng)。冬施攪
49、拌混凝土的時(shí)間應(yīng)比常溫條件下適當(dāng)延長。5.4.4 預(yù)拌混凝土運(yùn)輸要求(1)從攪拌站到施工現(xiàn)場(chǎng)采用混凝土汽車罐車,罐車筒體用定型的保溫被覆蓋保溫。(2)混凝土進(jìn)場(chǎng)后采用汽車泵泵送。 (3)混凝土從攪拌站運(yùn)送至澆筑地點(diǎn),延續(xù)時(shí)間盡量縮短,不得超過混凝土的初凝時(shí)間?;炷翑嚢柽\(yùn)輸車單趟行駛時(shí)間控制在1h之內(nèi),運(yùn)輸?shù)能囕v間隔時(shí)間不大于20min,混凝土的運(yùn)輸供應(yīng)保持運(yùn)輸均衡。(4)預(yù)拌混凝土到施工現(xiàn)場(chǎng)出罐溫度不低于10。(5)混凝土攪拌站人員密切注意混凝土攪拌及運(yùn)輸過程中混凝土的溫度,當(dāng)不滿足要求時(shí),及時(shí)采取措施。5.4.5 混凝土澆筑及振搗技術(shù)要點(diǎn)(1)掌握氣溫動(dòng)態(tài),混凝土澆筑選擇白天無風(fēng)晴朗天氣進(jìn)
50、行, 當(dāng)最低氣溫低于15停止混凝土施工。(2)在混凝土澆筑之前,對(duì)澆筑時(shí)所用腳手架、馬道的搭設(shè)和防滑措施檢查、振搗機(jī)械和工具的準(zhǔn)備等。(3)在混凝土澆筑之前,要及時(shí)清除鋼筋、模板和腳手架作業(yè)平臺(tái)上的冰雪凍塊和污垢,用熱風(fēng)機(jī)清除冰雪和對(duì)鋼筋、模板進(jìn)行預(yù)熱,并用空壓機(jī)吹干凈,不能用澆筑熱水融化的方法。 (4)混凝土入模溫度不低于5。 (5)混凝土送到澆筑地點(diǎn)后,如混凝土拌合物出現(xiàn)離析或分層現(xiàn)象,應(yīng)對(duì)混凝土拌合物進(jìn)行二次攪拌,同時(shí)應(yīng)檢測(cè)其坍落度。 (6)混凝土因凝結(jié)或凍結(jié)而降低流動(dòng)性后不得加水拌和使用。 (7)每個(gè)流水段混凝土的澆筑要連續(xù)施工,間隔時(shí)間不超過0.5h,不留施工縫。(8)混凝土振搗采用
51、插入式振動(dòng)棒,振搗密實(shí)。5.4.6 混凝土保溫及養(yǎng)護(hù)(1)柱木模板側(cè)外圍及上口滿裹掛兩層15厚阻燃保溫被;墻鋼大模板背楞之間粘貼兩層15厚聚氨酯阻燃保溫板、墻上口將保溫被切成條雙層封蓋嚴(yán)密;梁板下部樓層外圍洞口采用彩條布封閉。 (2)利用外腳手架設(shè)彩條布擋風(fēng),防止冷風(fēng)直接灌擊施工混凝土接觸面。 (3)梁板混凝土振搗密實(shí)后抺平,在混凝土表面溫度降至2之前先覆蓋一層塑料薄膜,再覆蓋二層阻燃保溫被,并覆蓋要嚴(yán)密并用木方壓實(shí)。(4)在樓板上預(yù)埋鋼筋馬凳,鋪上跳板,以便于保溫、測(cè)溫人員能夠及時(shí)覆蓋和測(cè)溫。特別注意板邊緣、墻頂樓板處等易受凍部位的保溫。(5)混凝土受凍臨界強(qiáng)度:未加防凍劑的混凝土為設(shè)計(jì)強(qiáng)度
52、30%,摻用防凍劑的混凝土不得小于4.0n/mm2。(6)混凝土達(dá)到受凍臨界強(qiáng)度后并冷卻到5方可拆除墻、柱、梁側(cè)模板和保溫被,拆模時(shí)混凝土溫度與環(huán)境溫度差大于20時(shí),拆模后的混凝土表面應(yīng)及時(shí)覆蓋嚴(yán)密,使混凝土緩慢冷卻,防止由于溫差過大產(chǎn)生溫度裂縫。拆除時(shí)間根據(jù)同條件試塊確定,經(jīng)驗(yàn)數(shù)是,當(dāng)溫度為-5-8時(shí),拆除時(shí)間不少于48h;當(dāng)溫度為-8-12時(shí),拆除時(shí)間不少于72h。(7)混凝土養(yǎng)護(hù)期間要防風(fēng)防失水,養(yǎng)護(hù)時(shí)間為14d。(8)混凝土養(yǎng)護(hù)期間要嚴(yán)格控制梁板面上料時(shí)間及荷載。5.4.7 混凝土試塊留置(1)應(yīng)按常溫規(guī)定留置齡期為28d標(biāo)養(yǎng)試塊、結(jié)構(gòu)實(shí)體檢驗(yàn)試塊。(2)同條件試塊墻體、柱留置三組:一
53、組測(cè)受凍臨界強(qiáng)度,約37d,應(yīng)與測(cè)溫結(jié)合起來,在結(jié)構(gòu)溫度降到防凍劑規(guī)定溫度前試壓,判斷是否超過受凍臨界強(qiáng)度;一組測(cè)拆模的混凝土強(qiáng)度;一組測(cè)冬施轉(zhuǎn)常溫后再養(yǎng)護(hù)28d的混凝土強(qiáng)度。梁板留置三組:一組測(cè)受凍臨界強(qiáng)度,約37d,應(yīng)與測(cè)溫結(jié)合起來,在結(jié)構(gòu)溫度降到防凍劑規(guī)定溫度前試壓,判斷是否超過受凍臨界強(qiáng)度;一組測(cè)拆模的混凝土強(qiáng)度;一組測(cè)冬施轉(zhuǎn)常溫后再養(yǎng)護(hù)28d的混凝土強(qiáng)度。同條件混凝土試塊應(yīng)裝入提前加工好的鋼筋籠內(nèi),放在與結(jié)構(gòu)相同條件下進(jìn)行養(yǎng)護(hù)。5.4.8 混凝土測(cè)溫(1)冬期混凝土測(cè)溫范圍大氣溫度、水和骨料加熱溫度、混凝土出機(jī)時(shí)溫度、混凝土出罐溫度、混凝土入模溫度、混凝土養(yǎng)護(hù)溫度。 (2)混凝土測(cè)溫
54、點(diǎn)的布設(shè)混凝土測(cè)溫孔應(yīng)設(shè)在混凝土溫度較低的和有代表性的地方,采用綜合蓄熱保溫法時(shí),應(yīng)在易冷卻的部位設(shè)置。剪力墻:上下測(cè)孔距大模板上下邊緣300mm,與混凝土面傾斜300角設(shè)置孔深100mm。柱:上、下邊緣300mm,與混凝土面傾斜300角設(shè)置孔深100mm。樓梯間:每層測(cè)孔不少于3個(gè)。梁板:每15m2設(shè)置1個(gè),每間至少設(shè)置1個(gè),與混凝土面垂直設(shè)置,孔深1/2板厚。所有測(cè)溫孔均應(yīng)編號(hào),并繪制測(cè)溫布置圖。(3)主要測(cè)溫工具、用具測(cè)溫百葉箱設(shè)置:規(guī)格為300mm×300mm×400mm,在施工現(xiàn)場(chǎng)的東南側(cè)和西北側(cè)各安裝一個(gè),距地面高度為1.5m,通風(fēng)條件較好,外表面刷白色油漆。測(cè)溫計(jì):測(cè)量大氣溫度,采用最高最低溫度計(jì);測(cè)量混凝土出罐溫度和入模溫度,采用便攜式建筑電子測(cè)溫儀;測(cè)量混凝土養(yǎng)護(hù)溫度,采用玻璃酒精液體溫度計(jì);各種測(cè)溫計(jì)在使用前均應(yīng)進(jìn)行校合。開始測(cè)溫前,還應(yīng)備齊手電筒、測(cè)溫記錄表等用具、文具。(4)測(cè)溫方法及要求大氣溫度:2:00、8:00、14:00、20:00及最高最低溫度、平均溫度。從10月25日開始由專
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 2025版權(quán)轉(zhuǎn)讓合同:電影(電視)劇版權(quán)益讓渡協(xié)議
- 2025租賃合同模板示例
- 2025網(wǎng)絡(luò)版自建房屋買賣合同范本
- 2025年家庭成員間共同購房合同
- 腦干出血昏迷護(hù)理查房
- 2025商業(yè)辦公場(chǎng)地租賃合同范本
- 手術(shù)后返回病房的護(hù)理
- 南京倉庫租賃合同范本
- 產(chǎn)業(yè)園物業(yè)匯報(bào)
- 全冠牙體預(yù)備的護(hù)理配合
- 煤礦頂板管理培訓(xùn)
- 刑事訴訟中電子數(shù)據(jù)凍結(jié)的性質(zhì)及其法律規(guī)制
- 觀察小魚尾鰭內(nèi)血液的流動(dòng)實(shí)驗(yàn)
- 2025年重慶三支一扶招募469人高頻重點(diǎn)提升(共500題)附帶答案詳解
- 健身會(huì)籍顧問
- 電力系統(tǒng)分析知到智慧樹章節(jié)測(cè)試課后答案2024年秋東北電力大學(xué)
- 2025年中航證券有限公司招聘筆試參考題庫含答案解析
- 2024年中考?xì)v史真題匯編專題13 材料分析題(中國史部分)-教師
- 2025年上半年甘肅省林業(yè)和草原局事業(yè)單位招聘筆試重點(diǎn)基礎(chǔ)提升(共500題)附帶答案詳解
- 化工單元操作知到智慧樹章節(jié)測(cè)試課后答案2024年秋煙臺(tái)職業(yè)學(xué)院
- 談黑色變-認(rèn)識(shí)色素痣與黑素瘤.課件
評(píng)論
0/150
提交評(píng)論