




版權(quán)說明:本文檔由用戶提供并上傳,收益歸屬內(nèi)容提供方,若內(nèi)容存在侵權(quán),請進(jìn)行舉報(bào)或認(rèn)領(lǐng)
文檔簡介
1、synchronous backup software does not respond to the rest of the data to be modified. in order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. offsite backups that must be supported across networ
2、k segments. in accordance with the above requirements for development our dedicated backup software. after development, wing that opened in salt on high speed test results meet the design requirementswith the passing of time, it is preparing source huan of hubei industrial investment company limited
3、 factory close to the planning of the day looks like, planning human ideals gradually into an entity, spread out before us. security plan enters the deployed state. after listening to your business objective for the leaders of security, i quickly people with loyalty to the cause of security, as well
4、 as previous security experience, combined with peer pioneers of success stories or experiences. border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory boundary: 540.65m x 234
5、.24m rectangular site. 1.2 scope for such dachangqu, i recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. because the factory could not spend a great deal of manpower cost to post thr
6、ee steps, five steps and a whistle. as we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. in order to better achieve the goal of planners, as well as for active solid border defense work. we recommend that you use infrare
7、d radiation or linkage of electronic fences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiation equipment or fences and electronic equipment as well as
8、 video surveillance equipment, the specific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your company's site to see and listen to the leadership proposal, and in accordance with the actual needs of the project, with reference to the relevan
9、t international standards and national standards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. if the contents or any other aspect of the programme has not detailed where we welcome your valuable comments. second, the design pr
10、inciples of the project design follows technology advanced, functional, stable and cost-saving principles. and considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room for expansion. design elements of the system is the s
11、ystematic, integrated and comprehensive; design has the scientificity, reasonability and operability. its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology, errors rate low, compatible sex strong, upgrade easy,
12、 used module type structure, expansion convenient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming and operation using and should simple, easy master, f
13、or china conditions and this project of features. set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. while the system is the system used for various management leve
14、ls, its functions are configured to provide the user with comfortable, safe, fast and convenient to3.1, the intelligent building design standards (gb/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (db32/191-1998) 3.3, the code大板銅精煉技改電解液凈化工程電氣安裝工程施工方案1、 工程概況1.1 供配
15、電系統(tǒng)工程1.1.1大板銅精煉技改電解液凈化工程,由凈化濃縮、凈化結(jié)晶 、凈化水泵房(附設(shè)低壓配電室)、凈化鹽水機(jī)組冷卻水泵房四部分子單位工程組成。凈化供配電采用tn-s系統(tǒng)放射型供電方式,子單位工程三相五線制380v220v電源引自凈化水泵房低壓總配電室;1.1.2 子單位工程均設(shè)有低壓配電室供電系統(tǒng); 1.2 電氣動(dòng)力安裝工程1.2.1動(dòng)力電源電纜均采用ygc-yjv-1kv電纜,控制電纜均采用ygc-kvv-500v電纜,沿電纜橋架敷設(shè)、橋架外穿管或穿pe管保護(hù)敷設(shè);1.2.2 電纜標(biāo)注敷設(shè)和安裝方式的文字符號(hào)sc: 穿焊接鋼管敷設(shè),ct:沿橋架敷設(shè);pc:穿pe塑料管敷設(shè);fc:暗敷設(shè)
16、在地面或地板內(nèi);wc:暗敷設(shè)在墻內(nèi);1.2.3 所有的明配管均采用pe塑料管,埋地管采用sc鋼管,外露部分采用不銹鋼管;1.2.4單梁吊起重機(jī)安裝a凈化濃縮廠房 +10.00,5t電動(dòng)葫蘆電氣安裝,單極安全滑線安裝,老濃縮廠房滑線拆安; b、凈化結(jié)晶鎳廠房 ±0.00,2t電動(dòng)葫蘆電氣安裝, ±15.00,10t電動(dòng)葫蘆電氣安裝;c、凈化水泵房 ±4.50,2t電動(dòng)葫蘆電氣安裝,單極安全滑線安裝;1.3防雷及接地系統(tǒng)1.3.1 本工程防雷等級(jí)為三類,采用10鍍鋅圓鋼做避雷接閃器; 1.3.2 利用建筑物基礎(chǔ)內(nèi)鋼筋網(wǎng)做接地體將基礎(chǔ)結(jié)構(gòu)主筋通長焊接成基礎(chǔ)接地網(wǎng);1.3
17、.3 防雷接地和電氣設(shè)備的保護(hù)接地共用接地極;r1歐。1.3.4 凡不帶電金屬部件,電氣設(shè)備金屬外殼均應(yīng)可靠接地。2、施工準(zhǔn)備2.1 由技術(shù)負(fù)責(zé)人組織施工人員認(rèn)真熟悉施工圖紙及相關(guān)設(shè)計(jì)文件、標(biāo)準(zhǔn)規(guī)范,掌握設(shè)計(jì)意圖及設(shè)計(jì)要求,對(duì)圖紙中所選用的電氣設(shè)備和主要材料進(jìn)行統(tǒng)計(jì)。做好施工圖紙的審查、會(huì)審,參加設(shè)計(jì)交底及圖紙會(huì)審;2.2 按施工作業(yè)計(jì)劃備齊施工用料及施工機(jī)具;2.3 與供應(yīng)部及生產(chǎn)技術(shù)部一起進(jìn)行工程設(shè)備及材料的檢驗(yàn)工作,要求設(shè)備、材料的規(guī)格、型號(hào)、數(shù)量應(yīng)與圖紙一致,附件、設(shè)備、質(zhì)量合格證及技術(shù)文件齊全,同時(shí)應(yīng)符合規(guī)范要求,并作好檢驗(yàn)記錄;2.4 根據(jù)工程特點(diǎn),組織學(xué)習(xí)安全規(guī)程及規(guī)章制度,開工
18、前對(duì)施工人員進(jìn)行安全技術(shù)交底;2.5 施工前參與生產(chǎn)技術(shù)部組織的工序交接,核實(shí)土建工程是否達(dá)到電氣施工要求,內(nèi)容如下:2.5.1 屋頂、樓板施工完畢,不得滲漏;2.5.2室內(nèi)地面的基層施工完畢,并在墻上標(biāo)出地面標(biāo)高;2.5.3 預(yù)埋件及預(yù)留孔位置符合設(shè)計(jì)要求,預(yù)埋件應(yīng)牢固;2.5.4配電室門窗安裝完畢,具備封閉條件;2.5.5設(shè)備安裝后不能再有可能損壞已安裝設(shè)備的裝飾工作;2.5.6混凝土及基礎(chǔ)構(gòu)架達(dá)到允許安裝的強(qiáng)度,設(shè)備支架焊接質(zhì)量應(yīng)符合設(shè)計(jì)要求;2.5.7 施工設(shè)施及雜物需清除干凈,并有足夠的安裝用地,施工道路通暢;3、主要安裝工程量;施工機(jī)具計(jì)劃序號(hào)名稱型號(hào)規(guī)格單位數(shù)量1低壓配電柜ggd
19、2臺(tái)202低壓配電柜gxll2(改)臺(tái)13plc控制柜ggd2臺(tái)14控制箱臺(tái)445動(dòng)力檢修箱臺(tái)96照明配電箱臺(tái)77燈具各種規(guī)格套1608玻璃鋼橋架200*100、400*200米3909單梁吊起重機(jī)臺(tái)410保護(hù)管米320011吊車q=8t臺(tái)112吊車q=16t臺(tái)113載重汽車5t臺(tái)214載重汽車8t臺(tái)115手拉葫蘆1t/2t臺(tái)8/316彎管機(jī)2970臺(tái)117砂輪切割機(jī)250臺(tái)218鉆床61319鉆床2520電動(dòng)剪切機(jī)臺(tái)121母線煨彎機(jī)手動(dòng)自制22電錘0.6kw23交流焊機(jī)臺(tái)224角向磨光機(jī)臺(tái)625對(duì)講機(jī)套126電纜放線架套427接地電阻測試儀只128高壓絕緣搖表只229電氣系統(tǒng)調(diào)試儀表套14、
20、主要?jiǎng)趧?dòng)力需要計(jì)劃工種等級(jí)人數(shù)電工四級(jí)以上10人鉗工合格10人電調(diào)工合格4人電焊工合格3人3人起重工合格4人外協(xié)工合格15人5、主要施工方法和技術(shù)組織措施5.1 主要施工順序安排:施工準(zhǔn)備 主要設(shè)備、材料進(jìn)場驗(yàn)收 防雷接地系統(tǒng)安裝配合土建預(yù)留洞孔、預(yù)埋導(dǎo)管 安裝前對(duì)土建條件進(jìn)行檢查確認(rèn) 動(dòng)力、現(xiàn)場控制箱等電氣設(shè)備安裝 導(dǎo)管、橋架貫通 電纜、銅母排等電路敷設(shè)安裝 照明安裝 檢查接線、線路連接 電氣交接實(shí)驗(yàn)、調(diào)整試車5.2主要施工方法5.2.1接地裝置安裝a、明敷接地應(yīng)便于檢查,在直線段不應(yīng)有高低起伏及彎曲;b、接地體頂面埋設(shè)深度應(yīng)符合設(shè)計(jì)要求,當(dāng)無埋設(shè)要求時(shí),頂部距地面不小于0.6m,角鋼接地體
21、應(yīng)垂直配置,間距不應(yīng)小于5m;c、接地體(線)的焊接應(yīng)采用搭接焊,搭接長度符合要求;d、接地體敷設(shè)完畢,基坑回填土不應(yīng)有石塊和建筑垃圾等。5.2.2 盤柜安裝a、盤柜在吊裝、搬運(yùn)過程中要固定牢靠,防止磕碰,避免元件、儀表等油漆損壞;b、盤柜組安裝后,盤面每米高垂直度應(yīng)小于1.5mm,相鄰兩盤頂部水平偏差應(yīng)小于2mm,成列安裝時(shí),盤頂部水平偏差應(yīng)小于5mm;c、盤柜接地應(yīng)牢固良好;d、引入電纜應(yīng)排列整齊、編號(hào)清晰,避免交叉并固定牢固,不得使端子額外受力;e、盤柜內(nèi)電纜芯線按直或水平有規(guī)律配置,不得任意歪斜交叉連接,備用芯線長度有余量;5.2.3 電氣設(shè)備檢查接線a、電氣設(shè)備可接近裸露導(dǎo)體,必須接
22、地;b、電氣設(shè)備安裝牢固,防水防潮電氣設(shè)備的接口及接線盒等做密封處理;c、設(shè)備接線盒內(nèi)裸露的不同相導(dǎo)線間和導(dǎo)線對(duì)地間最小距離應(yīng)大于8mm,否則應(yīng)采取絕緣防護(hù)措施;d、電氣設(shè)備的絕緣電阻值應(yīng)大于0.5;5.2.4 母線安裝a、母線表面應(yīng)光潔平整,不應(yīng)有裂紋、折皺、夾雜物及變形和扭曲現(xiàn)象,并應(yīng)矯正平直,切斷面平整,無毛刺;b、相同布置的母線,引下線應(yīng)對(duì)稱一致,橫平豎直,整齊美觀;c、母線接頭螺孔的直徑宜大于螺栓直徑1mm,鉆孔應(yīng)垂直,不歪斜,螺孔間中心距離的誤差為±0.5mm;d、母線的接觸面加工必須平整、清潔、無氧化膜,螺栓孔周邊無毛刺;e、母線各類搭接連接的鉆孔直徑和搭接長度符合規(guī)范
23、要求;f、母線支架與預(yù)埋件采用焊接固定時(shí),焊縫應(yīng)飽滿;采用脹栓固定時(shí),選用螺栓適配,連接牢固;g、母線平置時(shí),貫穿螺栓應(yīng)由下往上穿,其余情況下,螺母應(yīng)置于維護(hù)測,螺栓長應(yīng)宜露出螺母23扣;焊接前對(duì)口平直,其彎折偏移不應(yīng)大于0.2%;中心線偏移不應(yīng)大于0.5mm.對(duì)口間隙24mm,65°75°坡口,1.52mm頓邊厚;h、母線應(yīng)盡量減少對(duì)接焊縫,對(duì)接盡量采用螺栓連接,對(duì)接焊接支持絕緣母線夾板邊緣不應(yīng)小于50mm,相同母線不同片上的對(duì)接焊縫,應(yīng)錯(cuò)開位置不少于50mm;i、焊接接頭表面應(yīng)無肉眼可見的裂紋、凹陷、缺肉、未焊透、氣孔、夾渣等缺陷;j、咬邊深度不得超過母線厚度的10%,
24、且其總長度不得超過焊縫總長度的20%;k、母線涂色:交流,a相黃色,b相綠色,c相紅色;在連接處或支持件邊緣兩側(cè)10mm以內(nèi)不涂色;5.2.5 橋架安裝a、橋架安裝橫平豎直,整齊美觀,支持水平間距1.5m,垂直間距不大于2m;b、橋架連接板螺栓固定緊固無遺漏,螺母位于橋架外側(cè);c、支架與預(yù)埋件焊接固定處,焊縫飽滿,螺栓固定處連接緊固,防松零件齊全;5.2.6 電纜敷設(shè)a、電纜敷設(shè)前,必須經(jīng)絕緣測試合格后,方可進(jìn)行;b、電纜敷設(shè)時(shí),應(yīng)排列整齊,不宜交叉,要加以固定并裝設(shè)標(biāo)志牌;c、電纜終端上應(yīng)有明顯的相色標(biāo)志,且應(yīng)與系統(tǒng)的相位相一致;d、金屬電纜支架、電纜套管必須接地可靠;e、電纜敷設(shè)嚴(yán)禁有擰絞
25、、護(hù)層斷裂和表面嚴(yán)重劃傷等缺陷;5.2.7 塑料管敷設(shè)a、塑料管管口應(yīng)平整、光滑、管與管、管與盒(箱)之間應(yīng)采用插入法連接,連接處結(jié)合面應(yīng)涂膠合劑,接口應(yīng)牢固密封;b、明配硬塑料管應(yīng)排列整齊、固定點(diǎn)間距應(yīng)均勻;c、塑料管彎曲處及至設(shè)備接口需采用波紋管密封;5.2.8 金屬管敷設(shè)a、金屬管必須接地(零)可靠;b、暗配的導(dǎo)管埋設(shè)深度符合規(guī)定,明配的導(dǎo)管應(yīng)排列整齊、固定點(diǎn)間距均勻,安裝牢固;c、鋼管安裝時(shí),彎曲半徑不小于管外徑的6倍,明配一個(gè)彎時(shí),彎曲半徑不小于管外徑的4倍,二個(gè)彎時(shí),彎曲半徑不小于管外徑的6倍;d、金屬管至設(shè)備接口接口采用波紋管密封;e、暗敷鋼管套絲或套箍連接,套管用電焊焊接,管口
26、不應(yīng)有毛刺;f、所有鋼管始終端應(yīng)焊有m10的鍍鋅螺栓1個(gè),并于接地母線相連;5.2.9 燈具安裝a、燈具固定牢固可靠,重量大于3kg時(shí)固定在螺栓和支架上;b、燈具距地面高度小于2.4m時(shí),燈具可接近裸露導(dǎo)體必須接地可靠,引向燈具的導(dǎo)線線芯滿足規(guī)范要求;c、燈具及其配件齊全,無機(jī)械損傷、變形、燈罩破裂等缺陷;d、低壓配電設(shè)備及裸母線正上方不應(yīng)安裝燈具;5.2.10 安全滑線安裝a、安全滑線連接應(yīng)平直,支架安裝牢固;b安全滑線之間的距離應(yīng)一致,其中心線應(yīng)與行車軌道的實(shí)際中心線保持平行,其偏差應(yīng)小于10mm,滑線之間的水平偏差或垂直偏差小于10mm.5.3主要設(shè)備進(jìn)場計(jì)劃序號(hào)名稱型號(hào)規(guī)格單位數(shù)量要求
27、進(jìn)場時(shí)間1低壓配電柜ggd2臺(tái)202.152低壓配電柜gxll2(改)臺(tái)12.153plc控制柜ggd2臺(tái)12.154控制箱臺(tái)442.155動(dòng)力檢修箱臺(tái)92.156照明配電箱臺(tái)72.157燈具各種規(guī)格套1602.158玻璃鋼橋架200*100、400*200米3902.159單梁吊起重機(jī)臺(tái)4同機(jī)械設(shè)備10保護(hù)管米32002.015.4施工區(qū)域平面布置圖5.5質(zhì)量控制措施5.5.1 本工程質(zhì)量目標(biāo)平行于建安公司質(zhì)量管理體系質(zhì)量目標(biāo):工程驗(yàn)收合格率達(dá)100%;5.5.2 分公司質(zhì)量管理機(jī)構(gòu)職能圖示(見下圖)分公司經(jīng)理 配置人力資源、基礎(chǔ)設(shè)施,組織施工方案, 組織質(zhì)量自檢,協(xié)調(diào)各崗位質(zhì)量職責(zé)等分公司
28、主管 分解落實(shí)質(zhì)量目標(biāo),執(zhí)行標(biāo)準(zhǔn)規(guī)范、施工方案,組織 副經(jīng)理 物資驗(yàn)證、質(zhì)量檢查,督促做好質(zhì)量記錄等 質(zhì)量檢查,質(zhì)量驗(yàn)收評(píng)定,填寫記錄,整理交工資料等質(zhì)檢員核對(duì)圖紙,解決問題,提物資計(jì)劃,指導(dǎo)施工,質(zhì)量檢查,填寫驗(yàn)收記錄等技術(shù)員按方案及技術(shù)交底施工,組織物資驗(yàn)證,督促班組自檢,做好記錄等施工員 按標(biāo)準(zhǔn)、規(guī)程施工,組織自檢,反映材料、設(shè)備、施工質(zhì)量問題,施工設(shè)備使用維護(hù),參與質(zhì)量驗(yàn)收,填寫原始記錄等班組長組織物資進(jìn)場,驗(yàn)證、標(biāo)識(shí),建立臺(tái)帳,回收余料標(biāo)識(shí)建臺(tái)帳,庫存材料清理檢查等材料員 按圖紙交底施工,作好原始記錄,檢查反映質(zhì)量問題,及時(shí)整改發(fā)現(xiàn)問題,正確使用、保管圖紙等技術(shù)資料操作者 5.5.3
29、 本工程執(zhí)行的標(biāo)準(zhǔn)、規(guī)范電氣裝置安裝工程接地裝置施工及驗(yàn)收規(guī)范 gb50169-92電氣裝置安裝工程母線裝置施工及驗(yàn)收規(guī)范gbj149-90電氣裝置安裝工程電氣設(shè)備交接試驗(yàn)標(biāo)準(zhǔn)gb50150-91電氣裝置安裝工程電纜線路施工及驗(yàn)收規(guī)范gb50168-92電氣裝置安裝工程盤、柜及二次回路結(jié)線施工及驗(yàn)收規(guī)范gb50171-9235kv及以下電纜敷設(shè) 03d101-5 電氣裝置安裝工程低壓電氣施工及驗(yàn)收規(guī)范 gb50254-96電氣裝置安裝工程起重機(jī)電氣裝置施工及驗(yàn)收規(guī)范gb50256-96建筑電氣施工質(zhì)量驗(yàn)收規(guī)范 gb50303-2002施工現(xiàn)場臨時(shí)用電安全技術(shù)規(guī)范jgj46-20055.6主要質(zhì)
30、量控制程序序號(hào)程序名稱操作內(nèi)容責(zé)任人1ysja/cx-423文件控制程序標(biāo)準(zhǔn)規(guī)范、圖紙使用控制分公司文管員技術(shù)交底編制、施工方案編制分公司技術(shù)員技術(shù)交底發(fā)放、保管分公司文管員2ysja/cx-62人力資源控制程序提出人力資源需求,并引進(jìn)分公司經(jīng)理3ysja/cx-63基礎(chǔ)設(shè)施控制程序提出要求,組織基礎(chǔ)設(shè)施進(jìn)場,安裝、使用、維護(hù)、退場分公司副經(jīng)理4ysja/cx-64工作環(huán)境控制程序工作環(huán)境識(shí)別,檢查分公司副經(jīng)理操作規(guī)程、安全生產(chǎn)分公司安全員文明施工班組長5ysja/cx-72與顧客有關(guān)的過程控制程序顧客溝通,信息收集有關(guān)責(zé)任人6ysja/cx751施工和服務(wù)提供的控制程序組織施工,技術(shù)交底,參
31、與工程驗(yàn)收有關(guān)責(zé)任人7ysja/cx-74-1材料采購控制程序編寫材料計(jì)劃,報(bào)批技術(shù)員材料驗(yàn)證、驗(yàn)收、保管、發(fā)放材料員8ysja/cx-753標(biāo)識(shí)和可追溯性控制程序外來物資標(biāo)識(shí)材料員通過施工記錄和質(zhì)量記錄對(duì)施工半成品標(biāo)識(shí)施工員9ysja/cx-824-1外來物質(zhì)監(jiān)視和測量控制程序材料驗(yàn)證、入庫、材質(zhì)證明收集材料員工程設(shè)備開箱驗(yàn)證(會(huì)同生產(chǎn)技術(shù)部)施工員10ysja/cx-824-2施工半成品的監(jiān)視和測量控制程序工序質(zhì)量自檢,工序交接檢,質(zhì)量評(píng)定,質(zhì)量記錄填寫施工員技術(shù)員班組長11ysja/cx-824-3工程成品的監(jiān)視和測量控制程序竣工自檢,收集資料,預(yù)驗(yàn)整改施工員技術(shù)員副經(jīng)理6、安全環(huán)境措施
32、針對(duì)工程施工實(shí)際情況及環(huán)境條件,本工程需采取如下安全措施:6.1按照安全施工責(zé)任制及規(guī)章制度,各負(fù)其責(zé),針對(duì)具體施工條件,搞好安全技術(shù)交底。6.2 執(zhí)行建安安裝工人安全技術(shù)操作規(guī)程規(guī)定6.3架梯、腳手架使用前必須經(jīng)檢查確認(rèn)安全后方可使用,梯子使用時(shí)擺放穩(wěn)定,與地面夾角以60°-70°的范圍內(nèi)為宜,禁止兩人同時(shí)在梯子上作業(yè)。6.4 現(xiàn)場安裝必須等玻璃鋼干燥后才能動(dòng)電火焊,并且和土建玻璃鋼配制現(xiàn)場隔離至少5m,空氣中玻璃鋼丙酮揮發(fā)氣體濃度高時(shí),嚴(yán)禁電火焊,實(shí)施電火焊時(shí),必須采取防火措施。6.5進(jìn)入現(xiàn)場施工及管理人員正確佩戴安全帽,高空作業(yè)人員要正確佩戴安全帶。6.6 現(xiàn)場施工用
33、電必須設(shè)置漏電保護(hù),在密閉容器或鋼容器內(nèi)采用 以下行燈照明。6.7夜間操作和加班作業(yè)要增加照明設(shè)施和設(shè)專人監(jiān)護(hù)。6.8 現(xiàn)場的孔洞要加以留意識(shí)別,防止踩空,造成人身傷害。6.9現(xiàn)場定期檢查,并如實(shí)記錄,對(duì)有關(guān)違章人員按公司有關(guān)規(guī)定通報(bào)、處罰、教育、整改,違章作業(yè)必須停工。6.10現(xiàn)場需配備干粉及co2滅火器,發(fā)生電氣火災(zāi)要迅速斷電和撲救,并及時(shí)通報(bào)。6.11 現(xiàn)場材料堆放整齊,設(shè)備清潔,施工完后清理現(xiàn)場,做到文明施工 。for engineering design of generic cabling system for city residential buildings (cecs/11
34、9-2000) 3.4, code for design of buildings and campus cable systems engineering (gb/t50311-2000) 3.5, the code for electrical design of civil buildings (jgj/ t16-92) 3.6, the code for civil closed circuit monitoring tv system engineering technology (gb/50198-94) 3.7, the types of system earthing and
35、safety technical requirements (gb14050-93) 3.8, of the security engineering procedures and requirements (ga/t75-94) 3.9, the rules of security engineering acceptance (ga/t308-2001) 3.10, the industrial design of tv system code (gbj 115) 3.11, the security checks prevention system pass for graphics s
36、ymbol (ga/74-94) 3.12, and fire linkage control equipment general technology conditions (gb 16806-1997) four, and system function and features in system both advanced, and practical, and mature, and reliable, and do system open, and can extended sex good, both investment reasonable, and benefits bes
37、t of purpose, border security alarm system on site equipment for concentrated monitored, and control and management, makes these equipment to security, and reliable, and efficient to run, maximize intelligent management role to create a safe, healthy, comfortable and pleasant, and to improve the eff
38、iciency of a good environment and save energy, and reduce maintenance personnel. according to the project's environmental needs, and engagement functions to establish the project boundary security alarm system, in a word, this boundary is a project of the security alarm system is highly automate
39、d and efficient hospitality for a comfortable, convenient, and highly secure environment. five, scheme design based on design principles, design specifications and according to international and domestic standards, and in accordance with user needs, as well as drawings and related information provid
40、ed by, and joining the project's actual situation and future development trends, border security alarm systems for the project design. 5.1. principle of system and burglar alarm system from detectors, regional directors, and the alarm control centre composed of three parts. its principles as in
41、the following chart: detectors for burglar alarm system is inside and outside the building in key areas, important places, protection, when the probe to illegal invaders, the signal transmitted to the alarm control: sound and light alarm, display address, about the person on duty after receiving the
42、 alarm, take measures according to the situation, to control the development of the situation. anti-theft alarm system alarm function in addition to the above, there is linkage function. such as: open the alarm light (including infrared lamp), interactive audio and video matrix controller, switch on the alarm camera on the spot, matrix controller tv se
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒有圖紙預(yù)覽就沒有圖紙。
- 4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
- 5. 人人文庫網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
- 6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請與我們聯(lián)系,我們立即糾正。
- 7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 電力行業(yè)員工薪酬福利合同
- 勞動(dòng)合同 月度范文
- 大型商業(yè)綜合體裝修合同
- 建筑工地安全施工合同書
- 廢舊物資循環(huán)利用合同項(xiàng)目2025
- 生產(chǎn)制造合同合作書
- 商品房購回合同條款
- 房地產(chǎn)租賃管理合同范本
- 訂單班人才培養(yǎng)協(xié)議(范本)
- 無機(jī)鹽產(chǎn)品在農(nóng)業(yè)領(lǐng)域的應(yīng)用考核試卷
- 國企治理三會(huì)一層詳解
- 全國水資源綜合規(guī)劃技術(shù)細(xì)則(水利部文件)
- 2022年《國民經(jīng)濟(jì)行業(yè)分類》
- 公司企業(yè)生產(chǎn)安全事故應(yīng)急預(yù)案演練計(jì)劃
- 人教鄂教版科學(xué)六年級(jí)下冊全冊教案
- 鋁合金鑄造基礎(chǔ)知識(shí)(課堂PPT)
- 診斷學(xué)課件:臨床常用免疫學(xué)檢測
- jw甲級(jí)設(shè)計(jì)院十六層醫(yī)院綜合樓全套電氣施工圖紙103張含多大樣圖
- 廣東專插本高等數(shù)學(xué)真題
- 云南省普通初中學(xué)生成長記錄
- 仿真技術(shù)在車架防腐性能開發(fā)中的應(yīng)用
評(píng)論
0/150
提交評(píng)論