1、establishment of perfect quality control system. comprehensive understanding of engineering quality control points, develop specific comprehensive quality control measures, clear quality control responsibilities, company, department, three-level quality control system in the construction area of the

2、 project. concrete quality control system block diagram. 4.1 quality control principles: (1) quality control follow the prevention first principle, insisting on quality in advance control, eliminate hidden quality in spurts stage. (2) adhere to the high standards of quality assessment, and all data

3、is strictly prohibited on imagination-do. 4.2 quality control: quality control procedures, see next page. quality control elements list construction prepared process a design low-down 1 drawings since trial project technicians drawings information whether complete, whether meet construction need dra

4、wings technology file a, 2 design low-down project technology head understand design intent proposed problem drawings technology file design low-down records 3 drawings triage project technology head on drawings of integrity, and accuracy, and feasibility for triage drawings technology file drawings

5、 triage records ii developed construction process file 4 construction organization design project technology head by related file requirements prepared construction organization and standard approval drawings for approval of construction organization design of 5 construction plan project technical p

6、ersonnel above drawing standards proposal . officer for check acceptance, through the layers of quality control to ensure that the project meets quality standards. 3.9 breach of construction regulations, construction techniques according to the person in charge of construction quality accident repor

7、ting system specifications, design and construction process guide the construction personnel, shall not be an illegal command. the operator must operate in accordance with the relevant norms and regulations is, not brutal construction. construction managers found that the operators violated the cons

8、truction specifications, be stopped immediately, and report technical leader, urged the operator immediately corrected. quality accident on violations of construction rules, and size, as appropriate, timely escalation the company, management and owners and record in writing reports. quality the righ

9、t to stop any violations of construction quality accident of construction can occur. 3.10 summary quality improvement system for a week on a regular basis the quality of construction of the project for a comprehensive measurement and evaluation, the use of statistical techniques in quality scientifi

10、c statistical methods, identifying the principal contradiction. to find out the major quality problems and quality problems by the relevant departments to seriously study, find out ways to solve the quality problems andespecificaci tcnica jtj034-2000 lespecificaci, prova de proportioning segons els

11、requeriments de disseny i complir els requisits de disseny abans de construcci es pot utilitzar. estricte control de graduada fora crua triturada, valor, ndex drid 0,5 mm de tela fina com el plstic. gra escatosa a lndex de contingut en lmbit especificat, mentre net agregat dagregat. (2) el control e

12、stricte dels nivells graduada de composici agregat. 9.4.3.2 mtode de construcci de (1): macadam pavimentaci barreja ha dutilitzar una gran construcci mecnica, equips, equipament de transport, material de pavimentaci i altres rodets carretera normal de requisits de construcci del projecte. (2) ingred

13、ients: un control estricte de qualitat grava, tot nivell. preguem a travs de capes. (6) la difusi de qualificar a base de pedra triturada. difusi de la mquina. graduada pedra trencada pavimentaci en lnia dos paviments mquines per permetre luniforme complet per pedra triturada graduada per a paviment

14、s i anivellament, desprs de compactar el gruix de la base. divisi de paviment. per alleujar la segregaci, carretera classificava trencat pedra s 12,5 m (amb costat pedres ampliat), control de mquina de estenedora abg423 2 a 6 m, doble mquina botiga, dues pavimentaci de calades. quan dobla mquina bot

15、iga, estenent un estricte control dambdues parts abans delevaci, desprs de lexterior amb elevaci de control del filferro corda, pel qual sa linterior del pat coix control de nivell nivell, dos superposici estenedora pavimentaci 20-30cm, abans i desprs el mantenir dos 20-30m. hbrid carrils installats

16、 capacitat s de 8m, fer un paviment de calada. elements de paviment. materials de pavimentaci quan segregaci i personal designat per mantenir leliminaci de la segregaci agregat fina i gruixuda. pavimentaci de control de velocitat a 2,5-3m/min. en construcci, coeficient de solta aplanant per 1.2. aba

17、ns de paviments, primer comprovar el substrat, pendent, alat, secci, assegurar que els requisits, al mateix temps, davant el paviment sobre el terreny, polvoritzaci daigua sobre el substrat, la part superior subjacent mantenen la humitat adequada. per reduir la segregaci, garantit la planitud segons

18、 la situaci actual, la construcci, per evitar la segregaci de la barreja a la falda de pavimentada dasfalt, barreja a m amb una segregaci b material, mantenir sempre les llambordes al paviment no perdr procs barreja-los tots en la tremuja. (7) el laminat: pressi esttica: corr vibratori esttica 20t 1

19、 vegades. pneumtics: ltp2030 goma dels pneumtics vibraci corr rcc 1 vegades: compactaci vibratori terra esttica de 3 - 5 vegades (freqncia desprs de la primera freqncia alta): terra esttica vibraci carretera corr 1-2, pneumtics: patins de rodes de goma de ltp2030 rcc 1 vegades quan va rodar, directa

20、ment des de lespatlla a banda i banda per centre mlta de caixa de la carretera, lateral segments de corba dein order to ensure normal teaching order, protecting students healthy growth, ensuring that national (property) is not lost, to prevent or minimize the occurrence of safety accidents, follow t

21、he prevent, rescue each other, ensure safety and reduce losses principle, according to the local conditions, make the management system. 1, the principal is the responsibility of school safety, school security under the leadership of president security work leading group. the head teacher to the lea

22、dership team is responsible for, implementation of the accountability system. 2, school monthly student knowledge about safety education, education should be diversified in the form every safety education for students of classes per week should be targeted. to carry on emergency issues dealing with

23、education in general, self-help and mutual rescue knowledge. emergency calls (such as 110, 119, 122, 120, and so on) use common sense in education. 3, the establishment of major accident reporting system. school students report major accident within an hour of education; student run and disappearanc

24、es to report; report of the accident to a written report in triplicate, a correctional centre, a police station, a township peoples government shall not conceal the accident. 4 week, teachers are on duty system, establish and improve the leadership values; strengthen the education, management of tea

25、ching activities in schools to ensure normal teaching order; responsible for school safety leadership always maintained close contact and district police stations, canvassing support from the police station on school safety and help. 5, strengthening teachers moral education, establish a dedicated l

26、ove, improving education quality, observe the students psychological changes at any time and take preventive measures, no corporal punishment and covert corporal punishment on students, student out of the classroom, schools may not be. 6, units or departments use student street propaganda or partici

27、pate in the celebrations, as well as participating in other social work, without approval of the correctional centre, school principals consent, without organization. without the approval of relevant departments, may organize students to participate in fire fighting, disaster relief and so on. 7, sc

28、hools should educate students to obey the school rules and regulations, on time, on time home to prevent accidents. 8, school to school inspections on a regular basis, found hidden in time, and in severe cases, it is hard to eliminate immediately closed, and reported to the local peoples government,

29、 education, and rule of law section. 9, the school should always check the internal walls, retaining walls, ponds, railings, handrails, doors, windows, staircases and a variety of sports, extracurricular activities, facilities such as fire safety, infrastructure security, unsafe facility to immediat

30、ely repair and demolition to ensure that teachers and students work, learn, live venues and facilities are safe and reliable. song lin xiang liu jia ping elementary school march 2016 song lin xiang liu jia ping primary school fire safety systems to enhance fire safety, protection of public property

31、and the life and property safety of teachers and students, school fire safety into day-to-day management, is developing the following fire safety system. 1, strengthen fire safety education of the whole school. according to the requirements of the fire services act, so that everyone has of keeping f

32、ire control safety, protecting fire control facilities, fire prevention, reports of fire目錄(1) 談判函(2) 報價表(3) 技術規(guī)范偏離表(4) 售后服務承諾(包括:維護期限、維護方式、服務響應時間、故障排除時限、聯(lián)系人、聯(lián)系電話等)(5) 受邀方的業(yè)績合同(6)報價單位簡介及相應資質(zhì)證明文件 a、營業(yè)執(zhí)照復印件b、稅務登記證復印件c、組織機構代碼證復印件d、法定代表授權委托書復印件f、授權代理人身份證復印件g、質(zhì)量管理體系認證復印件i、受邀方認為有必要提供的其他資質(zhì)文件復印件(7)施工方案(安裝方案)

33、施工準備、施工順序主要分部分項工程施工要點與方法資源需用計劃施工進度計劃安排及人員配備情況保證質(zhì)量措施安全保證措施文明施工保證措施一、談 判 函河口區(qū)便民服務中心 : 東營市舒欣裝飾工程有限公司授權張增光經(jīng)理為全權代表,參加貴方組織的 衛(wèi)生間隔斷談判的有關活動,并對該項目進行報價,為此:1、提供談判須知規(guī)定的全部報價文件報價文件正本 壹份,副本 肆份;資格證明文件 2、保證遵守報價文件的有關規(guī)定和收費標準。 3、保證忠實的執(zhí)行買賣雙方所簽的經(jīng)濟合同,并承擔合同規(guī)定的責任義務。4、原意向貴方提供任何與該項談判有關的數(shù)據(jù)、情況和技術資料。5、本項目談判有效期為 30 個日歷天。 6、與本談判有關的

34、一切往來通訊請寄:地址:東營市東七路21號郵編: 257400電話:真:邀方全稱(公章):授權代表(簽字): 日 期:2012年3月27日二、報 價 表河口區(qū)便民服務中心辦公樓:序號貨物名稱單位數(shù)量單價(元)合價(元)1衛(wèi)生間隔斷平方米約24017040800.00合計:小寫:¥40800.00,大寫:肆萬零捌佰圓整受邀方全稱(公章):授權代表(簽字):2012年3月27日三、技術規(guī)范偏離表序號貨物名稱數(shù)量談判文件要求受邀方供貨成熟偏離說明1平開門平開門平開門投與招一致2顏色 淺灰色淺灰色投與招一致3規(guī)格600mmx1700mm600mm

35、x1700mm投比招優(yōu)越材質(zhì)實木顆粒板實木顆粒板投比招優(yōu)越4厚度18 mm18 mm投與招一致5配件鋅合金鋅合金投與招一致6拉桿及門檔金屬色鋁合金金屬色鋁合金投比招優(yōu)越受邀方全稱(公章):授權代表(簽字):2012年3月27日四、供貨時間及售后服務的承諾(包括:維護期限、維護方式、服務響應時間、故障排除時限、聯(lián)系人、聯(lián)系電話等)我公司對所有承接、并按本公司材質(zhì)工藝說明完成的工程項目,實行二年保質(zhì)、終生維護。意外情況僅收取工料成本費。針對系列產(chǎn)品服務內(nèi)容,我公司鄭重承諾:一、 本公司所有產(chǎn)品均說明售后服務熱線。二、 接到甲方通知后2日內(nèi)送貨到指定地點,并按照甲方要求于20天內(nèi)保質(zhì)保量完成工期。三

36、、 在質(zhì)保期內(nèi),我方將提供免費維修。若是因為使用不當而引起產(chǎn)品損壞,我方以合同價收取材料費,免收人工費。四、 我方維修人員在接到通知后30分鐘內(nèi)電話響應,4個小時內(nèi)派技術人員上門服務,當日內(nèi)修復。質(zhì)保期外,我公司仍一如既往地做好售后服務工作。五、 質(zhì)保期外,我公司負責終身維修,維修所需地面材料,我公司將以合同價同樣優(yōu)惠提供;隨時接受用戶的咨詢和求助。六、 我公司建立完善了完整的質(zhì)量監(jiān)督程序和客戶對應檔案;實行以客戶為中心的產(chǎn)品售后服務微機化管理;配備專門機構,跟蹤調(diào)查用戶使用情況,保證售后服務。想用戶之所想、急用戶之所急,為您提供放心滿意的全方位服務。七、 附:貨物質(zhì)量承諾書、售后服務承諾書單

37、位:東營市舒欣裝飾工程有限公司; 授權人: 地址:東營市東七路21號 郵編:257400 聯(lián)系電話傳真聯(lián)系手機2012年3月27日貨物質(zhì)量承諾書現(xiàn)就河口便民服務中心辦公樓衛(wèi)生間隔斷采購項目在貨物質(zhì)量方面,我公司鄭重承諾:1、提供的實際供貨產(chǎn)品與投標樣品無差異,未經(jīng)使用過的全新產(chǎn)品。2、供貨方式:汽運至工地現(xiàn)場。3、針對本工程具體情況,制定詳細的施工方案。4、建立專業(yè)的、責任分工明確的施工隊伍。投標方名稱(簽章)聯(lián)系人:張增光聯(lián)系電話機2012年3月27日 20

38、12年3月27日五、2008年以來受邀方的業(yè)績合同序號項目名稱供貨內(nèi)容合同金額(元)供貨時間用戶名稱用戶代表聯(lián)系方式備注1淄博萬杰醫(yī)院綜合樓三聚氰胺防潮板衛(wèi)生間隔斷450000.002010年5月淄博萬杰醫(yī)院孫主營市人民醫(yī)院綜合樓抗貝特板材624000.002009年10月東營市人民醫(yī)院李主任158651829893臨淄區(qū)新建高中綜合樓學生公寓a1-a7號樓衛(wèi)生間隔斷制作安裝三聚氰胺防潮板衛(wèi)生間隔斷276774.002010年6月臨淄區(qū)教育局鄭主淄區(qū)新建高中綜合樓衛(wèi)生間隔斷制作安裝35mm塑鋼板材衛(wèi)生間隔斷225000.002010年

39、12月臨淄區(qū)教育局鄭主邑一中新校區(qū)35mm塑鋼板材衛(wèi)生間隔斷245600.002010年5月山東興昌建設有限公司王經(jīng)理159636359886壽光市中心敬老院三聚氰胺防潮板衛(wèi)生間隔斷78030.002009年6月壽光中心敬老院劉主任7濱州汽車站35mm塑鋼板材衛(wèi)生間隔斷265061.002009年10月濱州汽車站張經(jīng)理133566187078??萍瘓F三聚氰胺防潮板衛(wèi)生間隔斷166500.002009年11月??萍瘓F楊經(jīng)理133566186679廣饒麟豐材料公司35mm塑鋼板材衛(wèi)生間隔斷70050.002011年5月廣饒麟豐材料公司隋經(jīng)理1865466360010濱

40、州國際大廈35mm塑鋼板材衛(wèi)生間隔斷210000.002009年8月濱州國際大廈姜主任1370546978711榮軍醫(yī)院25mm塑鋼板衛(wèi)生間隔斷280000.002009年11月勝利建安公司宋工1356336169912天圓銅業(yè)公寓樓35mm塑鋼板材衛(wèi)生間隔斷65200.002009年5月天圓銅業(yè)李經(jīng)stablishment of perfect quality control system. comprehensive understanding of engineering quality control points, develop specific comp

41、rehensive quality control measures, clear quality control responsibilities, company, department, three-level quality control system in the construction area of the project. concrete quality control system block diagram. 4.1 quality control principles: (1) quality control follow the prevention first

42、principle, insisting on quality in advance control, eliminate hidden quality in spurts stage. (2) adhere to the high standards of quality assessment, and all data is strictly prohibited on imagination-do. 4.2 quality control: quality control procedures, see next page. quality control elements list c

43、onstruction prepared process a design low-down 1 drawings since trial project technicians drawings information whether complete, whether meet construction need drawings technology file a, 2 design low-down project technology head understand design intent proposed problem drawings technology file des

44、ign low-down records 3 drawings triage project technology head on drawings of integrity, and accuracy, and feasibility for triage drawings technology file drawings triage records ii developed construction process file 4 construction organization design project technology head by related file require

45、ments prepared construction organization and standard approval drawings for approval of construction organization design of 5 construction plan project technical personnel above drawing standards proposal . officer for check acceptance, through the layers of quality control to ensure that the projec

46、t meets quality standards. 3.9 breach of construction regulations, construction techniques according to the person in charge of construction quality accident reporting system specifications, design and construction process guide the construction personnel, shall not be an illegal command. the operat

47、or must operate in accordance with the relevant norms and regulations is, not brutal construction. construction managers found that the operators violated the construction specifications, be stopped immediately, and report technical leader, urged the operator immediately corrected. quality accident

48、on violations of construction rules, and size, as appropriate, timely escalation the company, management and owners and record in writing reports. quality the right to stop any violations of construction quality accident of construction can occur. 3.10 summary quality improvement system for a week o

49、n a regular basis the quality of construction of the project for a comprehensive measurement and evaluation, the use of statistical techniques in quality scientific statistical methods, identifying the principal contradiction. to find out the major quality problems and quality problems by the releva

50、nt departments to seriously study, find out ways to solve the quality problems anddins de lespatlla a espatlla laminaci. comenant des de la carretera a ambds costats de lespatlla dur a rodant cam centre. 1 - 2 vegades ms pressi a banda i banda de carretera. procs rodant la roda del darrere 1/2 roda

51、ample, darrere de superposici roda amplada del paviment acabat, sha acabat. rodant velocitat dels rodets, les dues primeres vegades han de ser tractats amb 1.5-1.7km/h, desprs 2.0-2.5km/h. corr est estrictament prohibit a lacabat o est posant en un tram de carretera de torn o fre (fora de la zona de

52、 construcci a volta). aixafar controlada en la humitat ptima humitat contingut contingut flotant al voltant del 1% - 2% (prova personal controls en qualsevol moment en lobra si construcci) i, si sescau, recrrega artificial daigua, consum daigua s 1kg/m2, loperaci real grava tot humit, i la calada s

53、no formar aigua, portar laigua a les necessitats. 9.4.3.3 gesti de la qualitat de li avaluaci del control de dimensions de construcci estndard del projecte inspeccions graduada proporciona freqncia de mtode de prova de valor delevaci 1 secci longitudinal (mm) nica 20.1 metres secci 5, nivell-10, per

54、 secci 3-5 2 gruix (mm) endoll mesurar valor representatiu de-8 sol 100.6 metres damplada lmit-10 3 (mm) disseny estndard per 40,1-metre. estndards de qualitat i tolerncies de les taules de vorera projecte estndards de qualitat i tolerncies de grau subgrade de compactaci del grau de compactaci de su

55、bgrade de suavitat 10mm 110mm creu pendent requisits 10mm i menys de 0,3% amplada no inferior a lestructura de paviment disseny 9.5.2.3 constructiva mtode (1): 15cm de trencat graduada pedra base + 3 cm gruix ciment morter + 6 cm gruix pors sorra coix. (2) primria 15cm el gruix de paviment trencat g

56、raduada pedra base, preparaci, barreja de procs amb les carreteres, classificava aixafat grau pedra base, motor, pavimentaci, anivellament artificial, corr compactar. (3) ma permeable pres tant control fil horitzontals i verticals, assegura articulacions uniformes, lineals i suaus, superfcies plana. tancat 25x12cm pedra especificacions, c20 prefabricats formig requereix la mateixa mida, angular, fora compleix els requisits de disseny. 9.6 asfalt estructura de paviment de asfalt de paviment de formig de dalt a baix les segents: 4cm asfalt molt especfics con

溫馨提示

  • 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
  • 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯(lián)系上傳者。文件的所有權益歸上傳用戶所有。
  • 3. 本站RAR壓縮包中若帶圖紙,網(wǎng)頁內(nèi)容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
  • 4. 未經(jīng)權益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
  • 5. 人人文庫網(wǎng)僅提供信息存儲空間,僅對用戶上傳內(nèi)容的表現(xiàn)方式做保護處理,對用戶上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對任何下載內(nèi)容負責。
  • 6. 下載文件中如有侵權或不適當內(nèi)容,請與我們聯(lián)系,我們立即糾正。
  • 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。

評論

0/150

提交評論