




已閱讀5頁,還剩6頁未讀, 繼續(xù)免費閱讀
版權說明:本文檔由用戶提供并上傳,收益歸屬內容提供方,若內容存在侵權,請進行舉報或認領
文檔簡介
James Zhen, April. 5th.,HPC China ELCP Update,ELCP & Operation Improvement,The structure and process of the ELCP process is set up and communicated The next focus is to drive the execution of these process, with measurable target,Responsible & execution,HPC China Business Management Model,ELCP PHASE,1.0 INITIATION,2.0 PLANNING & PROPOSAL,3.0 SELECTION,4.0 IMPLEMENTATION,5.0 WARRANTY,6.0 SUPPORT,- HP confidential -,Management process,Project delivery Management,Funnel Management,Accountable manager,Bid manager,Project manager,SSO manager,Practice manager,Support & control,F&A, Contract, Credit, PMO, GM, WFP, RM, KM,P.S. Bid manager R&R, Project manager R&R in HPC,Control Document & activities,ELCP PHASE,1.0 INITIATION,2.0 PLANNING & PROPOSAL,3.0 SELECTION,4.0 IMPLEMENTATION,5.0 WARRANTY,6.0 SUPPORT,Owner BM BM&PPTL BM&PPTL PM PM PM,Submit BAT-A1,BAT/RAT Sign off,Sign Contract,Acceptance & Warranty Letter,Contract close letter,HPC China ELCP Implementation Card update,Order entry approval check list: I. BAT/RAT or FOI (if $500K). III. Contract approved by: 1) Contract 2) Credit 3) BAM 4) HPC Country GM 5) Workforce Partner Mgr. (for subcontract),BM: Bid Manager PPTL: Proposal Team Leader PM: Project Manager,- HP confidential -,Proposal submission Approval by SSO mgr,A1 Approval & EID,PM assigned BM & PM transition,PM sign-off check list,ELCP Pre-sale improvement,Monthly Funnel review with the right template (manual, transition to OSO later) F&A team update A1 approval, EID to funnels Proposal submission Approval by SSO mgr. & filing from April/02 Monthly proposal submission &deal review report Monitor SSO utilization on each opportunities Quotation need for sub-contract in price approval,Delivery Management Frame-Work - responsibilities,Practice mgr takes the management responsibility of the project after the deal is closed. Practice mgr assign and support the PM for all the project related issue, no matter the PM is from the Practice, other Practice, PMO or oversea. Practice mgr monthly review all the projects with PMs. Maintain review log & submit project overview in summary. PMO support Practice mgr review the projects with revenue 300K USD and designed issue projects,Delivery Management Frame-Work - management process,Once CMS is cut for the month, Project Admin will collect the labor cost, 3P cost, ic bills and travels associated with project delivery. No later than WD2 of each month, Project Admin will forward the updated cost tracking(per project) to PM and PM will review with Practice Manager. After reviewing with Practice Manager, PM send back the updated cost tracking to Project Admin with latest CTC (cost-to-complete) no later than end of WD3. PM ensure to obtain agreement from the practice manager for changing the CTC. Project Admin will base on the latest CTC provided by Project Manager for P&L forecast (revenue, EGM% and NP) and to update open project list. Such forecast will submit to AP by WD5 of each month, it will be used for forecast accuracy calculation on AP BFT. If Project Admin did not receive updated CTC from Project Manager in due time, its assumed that no change is required. Forecast shall be done base on the data of WD2. By WD10 of each month, a practice review meeting will be chaired by the Operations Manager, to go through project status, identify issues, define action items, and review the overall project financial picture. Practice manager monthly projects review report Base on the result of practice review meeting, F&A will update the P&L forecast and keep track the progress till month-end closing.,Improvement on delivery,PM assignment letter 100% for new project of Q2 FY02 Implement Project & PM sign-off check list by 100% from Q2 FY02 Customer SAT survey 100% implementation for revenue 200K projects PM make sure sub-contract ready before request sub start to deliver, otherwise escalate Monthly highlight report on issue&inactive projects with resolution to follow up,Improvement on delivery,PMO project monthly review and highlight report PMO big project monitor, project audit Monthly Practice review for Revenue, make sure 5% less on revenue up/down as country base,Resource management & Utilization,Promote utilization tool for resources forecast Monitor the low utilization staff and push improvement and deployment Implement the track of the skill miss matched and hard to re-deploy staff for recycle Monthly resources management report,Deal Review Report - monthly Resources Management report - monthly Issue Pro
溫馨提示
- 1. 本站所有資源如無特殊說明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請下載最新的WinRAR軟件解壓。
- 2. 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請聯系上傳者。文件的所有權益歸上傳用戶所有。
- 3. 本站RAR壓縮包中若帶圖紙,網頁內容里面會有圖紙預覽,若沒有圖紙預覽就沒有圖紙。
- 4. 未經權益所有人同意不得將文件中的內容挪作商業(yè)或盈利用途。
- 5. 人人文庫網僅提供信息存儲空間,僅對用戶上傳內容的表現方式做保護處理,對用戶上傳分享的文檔內容本身不做任何修改或編輯,并不能對任何下載內容負責。
- 6. 下載文件中如有侵權或不適當內容,請與我們聯系,我們立即糾正。
- 7. 本站不保證下載資源的準確性、安全性和完整性, 同時也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的傷害或損失。
最新文檔
- 住宅小區(qū)物業(yè)設施維保及更新協議
- 智能藥店電子貨架標簽租賃與醫(yī)藥信息管理系統(tǒng)合同
- 抖音平臺火花用戶身份驗證及用戶行為規(guī)范合同
- 城市文明抖音火花合作推廣合同
- 環(huán)保物流兼職貨車司機勞動合同
- 知識產權轉讓與知識產權運營管理服務合同
- 高效倉儲海外租賃與多維度服務協議
- 新能源充電樁智能充電系統(tǒng)研發(fā)與運營服務合同
- 蘇科版2025年中考數學三輪沖刺專題-幾何動態(tài)及最值問題含答案
- 《職業(yè)與健康》投稿須知
- 福建省廈門市2024-2025學年七年級下學期期中生物試題(原卷版+解析版)
- 高層火災撲救要點及注意事項
- 消防救援隊伍微腐敗風氣教育
- 2025-2030中國共軛亞油酸(CLA)行業(yè)市場發(fā)展趨勢與前景展望戰(zhàn)略研究報告
- 中央2025年中國知識產權研究會招聘筆試歷年參考題庫附帶答案詳解
- 10《奪取抗日戰(zhàn)爭和人民解放戰(zhàn)爭的勝利》第一課時《勿忘國恥》教學設計-2023-2024學年道德與法治五年級下冊統(tǒng)編版
- 江蘇省新高考基地學校2024-2025學年高三下學期第二次大聯考化學試卷(含答案)
- 試崗期協議書模板
- 檔案法律法規(guī)知識試題及答案
- 第四單元《比例尺》(單元設計教案)-2024-2025學年六年級下冊數學青島版
- 2025人教版七年級下冊生物期末學業(yè)質量檢測試卷(含答案)
評論
0/150
提交評論